助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[182]条 当前为第81条到100条[由于搜索限制,当前仅支持显示前5页数据]
 

相关语句
hvdc
He has since than held several positions in the design and marketing of HVDC.
      
However, 320 km is rather short for an HVDC system, where allocating converter stations cost per km is a large cost component.
      
However, this is likely to raise major planning and environmental issues which could be largely avoided by the use of hvdc links.
      
Hence for both of the above schemes the total length of HVDC submarine cable would be two times the route length.
      
HVDC converter bridges and lines or cables can be arranged into a number of configurations for effective utilization.
      
However, the reliability of APS does have relevant impact on the reliability of the HVDC link.
      
HVDC links are in general better at maintaining voltage stability than AC lines.
      
HVDC Link should be considered to be part of the Core Grid.
      
HVDC systems feature easy powerflow control, stable cable transmission, and economical operation for long-distance transmission.
      
HVDC control and protection panels are important for HVDC systems.
      
He is currently engaged in the design and construction of substation facilities, and at the Kii channel HVDC system, is involved in device design.
      
He worked in the design of the Kii-channel HVDC system, and is currently engaged in the design of control and protection equipment in power systems.
      
HVDC operation for the voltage and frequency excursions in the two islands has been reliable.
      
However, for DC power systems there is no such problems so that travelling wave protection is preferably applied to HVDC systems.
      
However, wavelet based fast identification and protection in HVDC systems is a rather undeveloped area.
      
It is well known that HVDC is well suited for connection of asynchronous as well as synchronous networks.
      
Identification of suitable locations for offshore and onshore hvdc converters and connecting substations.
      
If an AC circuit is converted for bi-pole HVDC operation, the unused conductor is be considered an emergency ground return path.
      
Its high internal redundancy puts tri-pole HVDC circuits in a reliability class with a double circuit, single tower, AC circuit.
      
Its redundancy is depended on transmission capacity of a HVDC Link and the configuration of a converter plant.
      
 

首页上一页12345下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社