助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[187]条 当前为第21条到40条[由于搜索限制,当前仅支持显示前5页数据]
 

相关语句
hoist
This contribution describes a promising approach to solving a simple version of this problem, namely cyclic hoist scheduling, based on Evolutionary Algorithms (EAs), which is an?optimization method inspired by biological evolution models.
      
Application of Nonlinear Optimisation Methods to Input Shaping of the Hoist Drive of an Off-Shore Crane
      
An application of nonlinear optimisation methods to the solution of finding the optimal hoist drive moment and the optimal velocity of the hoist drum is presented.
      
Such a choice enables the load to be lifted to a desired height when the boundary conditions are fulfilled and deformations of the hoist rope system are minimised.
      
Finally, we study the robotic cell scheduling problem, the auto-mated guided vehicles scheduling problem, and the hoist scheduling problem.
      
To demonstrate generality, we also consider application of our procedure to a more complicated, multi-product hoist scheduling problem.
      
The advantages of this integration are illustrated by efficientlysolving difficult optimisation problems like the Hoist Scheduling Problem [23]and the Progressive Party Problem [27].
      
An Improved Hybrid Model for the Generic Hoist Scheduling Problem
      
The generic hoist scheduling problem is NP-hard and arises from automated manufacturing lines.
      
The smart house concept includes an intelligent bed, intelligent wheelchair, and robotic hoist for effortless transfer of the user between bed and wheelchair.
      
Methods to improve the maintenance of oil rig hoist systems
      
A branch and bound algorithm for hoist scheduling of a circuit board production line
      
The article studies the scheduling problem of a material handling hoist in a circuit board production line.
      
Scheduling the movements of these hoists is commonly called a hoist scheduling problem (HSP) in the literature.
      
Basic equations of the motion of a rope pulley of variable length in a hoist with a friction pulley
      
The two major yeasts isolated from the southern pine beetle,Dendroctonus frontalis Zimmerman, areHansenula holstii Wickerham andPichia pinus (Hoist) Phaff; a third yeast,P.
      
A method for calculating the optimum operational characteristics of a mine skip hoist
      
The capital cost of such an installation is 2-3 times less than that of a conveyor, or skip hoist.
      
This paper presents the method of assessing rope wheel bearing wear, developed for the special case of a shaft hoist in the Bogdanka coal mine.
      
We also impose no restrictions on the times of robot arrival at and departure from machines as it is the case in the related, but different, hoist scheduling problem.
      
 

首页上一页12345下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社