助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[42]条 当前为第1条到20条
 

相关语句
connection works
    Study on Water Intake Scheme of Fenhe Reservoir In the Connection Works of the Yellow River Diversion Project(YRDP)
    万家寨引黄工程联接段汾河水库取水口方案研究
    Technological Design on Construction Horizontal Control Survey Network Of the Connection Works,the YRDP
    万家寨引黄工程联接段施工控制网的技术设计
    Influence of Construction Site on Its Surrounding Environment,the Connection Works,the YRDP
    引黄工程联接段施工现场对周边环境的影响
    Influence of Land Requisition for the Connection Works of the YRDP on Environment
    浅淡引黄联接段工程占地对环境的影响
    Structure Calculation for Tunnel #7 Segment of Yellow River Diversion Project Connection Works
    引黄联接段7#隧洞管片衬砌结构计算
    Selection of Design Scheme on Tunnel No.7 of " Connection Works" ,Wanjiazhai YRDP(Yellow River Diversion Project)
    万家寨引黄工程联接段7~#隧洞设计方案比选
    Application of PCCP in Connection Works of YRDP
    预应力钢筒混凝土管(PCCP)在引黄工程联接段输水工程中的应用
    Construction of PCCP on Upstream And Downstream Pipeline of Second Pressure-reducing Valve Room in The Connection Works of YRDP
    万家寨引黄联接段工程2~#减压阀室上下游PCCP管道的施工
    Design of Pontoon Trash Raft for Water Intake of Connection Works of YRDP
    引黄工程联接段汾河水库取水口浮式拦污排的设计
    Anti-thrust Design of PCCP in Connection Works of YRDP
    山西省万家寨引黄工程联接段PCCP止推设计
    Disilting Analysis for the Regulating Reservoir of Wanjiazhai Yellow River Diversion Project Connection Works
    万家寨引黄工程联接段调节水库泥沙冲淤分析研究
    The article analyzes three calculation methods for Tunnel 7 # segment structure of Yellow River Diversion Project Connection Works, and the final caculation results has been applicated successfully in the project and obtained the expected effect.
    万家寨引黄联接段工程 7#隧洞TBM施工采用的拼装式管片衬砌结构设计中用的结构力学方法、平面有限元法、空间有限元法 3种计算方法进行了分析和讨论 ,最终选定的计算成果已在工程中的成功运用 ,检测表明 ,达到了预期效果
    Using the technology of rapidly completing tunnel by TBM in tunnel NO. 7 in the connection works of YRDP,the tunnel,which is 13334m long,has been completed within 10 months. According to the computation of 244 workdays,the average advence length per day is 54.65m.
    山西省万家寨引黄工程联接段7#隧洞运用隧洞掘进机(TBM)快速成洞技术,在十个月内成洞13334m,按实际工作日244d计算,日平均进尺54.65m。
    In the connection works of Wanjiazhai YRDP,PCCP is adopted,the diameter of which is 3 m,and the total length is 43.5 km.
    山西省万家寨引黄工程联接段工程采用了3m直径的PCCP管,全长43.5km。
    Design on Intake Works of Fenhe Reservoir in the Connection Works, the YRDP
    浅谈引黄联接段汾河水库取水枢纽的设计
    Analysis and Contermeasures of Landslip of Branch Heading Happened in No.2 Tunnel on the Road of Connection Works,YRDP
    引黄联接段公路2号隧道错车道塌方原因分析及处理方法
    Technicial Analysis of Remeasure Design in Connection Works.the YRDP
    引黄联接段技施阶段重新测量的技术分析
    Quality Control in Construction of PCCP in “connection works” of Wanjiazhai YRDP(Yellow River Diversion Project)
    万家寨引黄工程联接段PCCP输水工程建筑安装Ⅱ标施工质量控制
    Application of Multiple Control Gate in Controlling Waste Water of Tunnel NO.1 of “Connection Works”,the South Main Line,Wanjiazhai YRDP (Yellow River Diversion Project)
    复式节制闸在联接段7~#隧洞弃水控制中的应用
    The Armored Joints Test of PCCP in the Connection Works of Wanjiazhai YRDP
    山西省万家寨引黄工程联接段PCCP铠装接头试验
 

首页上一页123下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社