助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[30]条 当前为第1条到20条
 

相关语句
over sea
    Construction Features of Bored Piles of Bridges over Sea
    跨海桥梁钻孔灌注桩施工特点
    DESIGN AND CONSTRUCTION OF STEEL HUNG BOX COFFERDAM FOR PLATFORM IN SOUTH INTERTIDE ZONE AT HANGZHOU BAY OVER SEA BRIDGE
    杭州湾跨海大桥南滩涂区承台钢吊箱围堰设计与施工
    Research on Comprehensive Key Technologies for Design of the Super Large-Scale East Sea Bridge over Sea
    东海大桥超大型跨海桥梁设计综合关键技术研究(上)
    Exploration on Erection Construction Technique of 70 m Box Girder at Hangzhou Bay Over Sea Bridge
    杭州湾跨海大桥70m箱梁架设施工技术的探讨
    The (overall) length of the Bridge is 20.922 km, in which the part of the Bridge over sea is 18.415 km.
    大桥全长20.922km,其中跨海桥梁长18.415km。
    Construction Techniques for Large Precast Pier Columns of Bridges over Sea
    跨海大桥大型预制墩柱的施工技术
    Design of Nanmeng bridge of Xiangshan Sanmengkou over sea bridge
    象山县三门口跨海大桥南门桥设计
    Century Bridge-Hangzhou Bay Bridge over sea
    世纪长桥杭州湾跨海大桥
    Research of Control Network Layout Techniques for Bridges over Sea
    跨海大桥工程控制网布设技术方案研究
    Application of GPS Technique to Piling Construction at Open Sea for Bridges over Sea
    GPS定位技术在跨海大桥外海沉桩施工中的应用
    Integrative Construction of Bridges over Sea ——Ideas and Implementation of Integrative Construction of Non-Navigable Spans of Donghai Bridge
    跨海大桥的一体化施工——东海大桥海上非通航孔一体化施工的构想及实践
    The corrosion and corrosion resistance design of long term used floating bridge discussed in this paper,according to the design and practical operation of Daxie Floating Bridge over sea and on the basis of corrosion data collection and the study of four years.
    根据大榭跨海浮桥设计与使用的工程实践,在多年数据采集和跟踪研究的基础上,对中长期浮桥的腐蚀与防腐设计进行探讨。
    The application of the composite girder broadens the range of utilization of the cable-stayed bridges, which will not only add new alternatives to the cable -stayed bridges, but also will provide new choices and practical experiences for the major bridges to be built over sea.
    钢-混凝土箱形结合梁的采用拓宽了结合梁斜拉桥的应用范围,不仅为斜拉桥的发展增添了新的形式,也为今后大型跨海大桥采用斜拉桥提供了新的选择与实践经验。
    Connecting an island at open sea 31 km far from the coast, Donghai Bridge is the longest, also in the real sense, the first bridge having ever been built over sea in China.
    东海大桥连接远离陆域31km外海孤岛,是我国最长、也是第一座真正意义上的跨海大桥。
    In the design of foundations for a bridge over sea, the horizontal force caused by waves to the foundations is the primary design load, and to a great extent, the load will dominate the design of the size of a foundation.
    跨海大桥基础设计中,波浪对基础产生的水平力为主要设计荷载,在很大程度上控制桥梁基础的规模。
    Under conditions that the (de-) signed service life of the Bridge is (100) years and the sea conditions are harsh, the construction practice to ensure the good durability of bridge structures over sea is still very lacking, the researches of the corrosion proof is thus extremely important and significant, and will provide valuable experiences for the deep-going researches of the durability of more bridge structures to be built (over) sea in China in the 21st century.
    在100年设计基准期的前提下、在恶劣海况的条件下,确保跨海桥梁结构耐久性的施工实践还很缺乏,进行这方面的探索及研究十分重要和有意义,将为我国21世纪跨海工程结构耐久性研究提供宝贵经验。
    With reference to the gravity survey, this paper describes the schemes of control network layout used with global positioning system (GPS) technique for Donghai Bridge project over sea.
    结合重力测量,介绍利用GPS技术进行东海大桥跨海工程控制网的布设技术方案。
    Under conditions that the design service life of the Bridge is 100 years, and construction is carried out at open sea under harsh climate, the implementation of the integrative construction becomes very important and is of significance to reduce construction risks at sea and will provide valuable experiences for still more bridges to be built over sea in China in the 21st century.
    在100年设计基准期的前提下,在外海恶劣气候的施工条件下,采用跨海桥梁一体化施工对于降低海上施工作业风险,显得十分重要和有意义,由此对我国21世纪大规模兴起的跨海桥梁建设将提供宝贵经验。
    The pile base grouting technique herewith undoubtedly provides a new idea for the construction of the large diameter and long bored piles with slurry wall protection in sea, and accumulates valuable experiences for more bridges to be built over sea in China in the future.
    无疑这对于海上超长大直径泥浆护壁钻孔灌注桩的施工提供了一个新思路,为我国今后跨海大桥的建设积累了宝贵的经验。
    This paper reviews the construction experience of Wuhan Yangtze River Bridge built in 1950', presents the "Tubular Drilling Method" and a series of the creative technologies adopted in design and fabrication of the bridge and describes the popularization, application and further development of these technologies in fabricating Nanjing Yangtze Bridge, Wuhu Bridge and Hengzhou Bay Bridge over Sea.
    本文回顾了我国五十年代建成的武汉长江大桥的建设历程,试举了建桥中采用的“管柱钻孔法”和正桥钢梁设计与制造中采用的一系列技术措施等创新技术,并阐述了这些新技术在以后建成的南京大桥、芜湖大桥及杭州湾跨海大桥建设中的推广应用和进一步发展。
 

首页上一页12下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社