助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[94]条 当前为第1条到20条
 

相关语句
未完全匹配句对
    2m Diameter Zhuhai Bridge Bored Pile HOle Completion in Guandong Province
    广东珠海大桥直径2m桥桩孔成孔施工实践
    Talks about Ex-post Evaluation after Completion of Port Construction Item
    港口建设项目后评价工作浅谈
    Based on Chongqing Shibanpo Changjiang Bridge,using the creep model of CEB-FIP(MC90) ,the deformation,internal force and prestress losses of creep responses at ten years after the completion of the bridge are analysed. The analysis result is useful to the construction analysis and design of the bridge to a certain extent.
    本文以重庆石板坡长江大桥为工程背景,采用CEB-FIP(MC90)的徐变模型,对成桥十年后该桥的徐变效应引起的桥梁变形、内力和预应力损失进行了计算分析,分析结果对该类桥梁的施工分析及设计具有一定的借鉴作用。
    Analysis and Countermeasures of Subsidence of Red Sandstone Roadbed After Its Completion
    红砂岩路基工后沉降分析与对策
    Brief Introduction About Compilation and Study of Completion Documents for Yichang Changjiang Highway Bridge
    宜昌长江公路大桥竣工文件编制与研究简介
    A Nonlinear Simulation Analysis-Completion Stage Static Analysis for Southern Branch Navigable Main Span of Jingzhou Changjiang River Highway Bridge
    荆州长江大桥南汊通航孔主桥非线性仿真分析——成桥状态静力分析
    Considerations on cost management in highway construction enterprises after project completion
    浅析公路施工企业项目完工后的成本管理思路
    The quality control of completion documents in highway engineering
    公路工程竣工文件的质量控制
    Study of Static and Dynamic Load Tests for Sifangtai Cable-Stayed Bridge,Harbin at Completion Stage
    哈尔滨四方台斜拉桥成桥静动载试验研究
    Influence on the Performance of the Completion Structure by the Initial Tension of the Main Cable of the Suspension Bridge
    悬索桥主缆初张力对成桥结构性能的影响
    Hole Completion Technology for Large-tonnage Rectangular Section Pile in Wanfeng Road Bridge
    万丰路桥大吨位矩形截面桩成孔施工技术
    Comprehensive Method of Determining Reasonable Cable Forces of Completion State of Bridge of the Cable-Stayed Bridges
    斜拉桥成桥合理索力确定的综合方法
    The technical assessment of highway slope protection is an important section of highway technicality posterior assessment The assessment is defined as assessment after completion of slope protection.
    公路滑坡防治的技术评价是公路技术后评价的招摇组成部分。 滑坡防治后评价定义为公路滑坡整治项目完成后进行评价,它包括社会经济评价和技术评价两方面。
    The main content and avhievements as follows:1.At the base of analyzing the highway investment component, the process of the highway project investment control is divided into five important stages, that is: the project decision stage, the design stage, the bidding stage, the construction stage, the completion acceptance stage, then they are carried on study separately, and the corresponding investment control goal is proposed on each main stage.
    1.在分析高速公路项目投资构成的基础上,将高速公路项目的投资控制过程划分为工程的项目决策阶段、设计阶段、招投标阶段、实施阶段、竣工验收阶段五个重要阶段分别进行研究,并提出各主要阶段所对应的投资控制目标。
    For the problems in construction technical materials at present,from the angle of examining engineering completion materials,the paper discussed the problems existed in construction technical materials and countermeasures.
    目前,作为工程质量保证之一的施工技术资料,还存在不少问题,为了引起施工单位的重视和强化质量管理,从工程竣工资料审查的角度,就施工技术资料中普遍存在的问题及其对策进行了阐述。
    Based on analysis of transport mode of the upper working module structure and design condition of the additional slideway structure of Nanyou marine wharf in Zhanjiang City, critical problems in design process were solved and favorable conditions were created for successful completion of the additional slideway project.
    对湛江市南油海工码头加建滑道工程上部工作模块出运方式、设计条件的分析 ,解决设计过程中关键问题 ,为加建滑道工程顺利建成创造条件。
    Based on Chongqing Shibanpo Changjiang Bridge,using the creep model of CEB-FIP(MC90),the deformation,internal force and prestress losses of creep responses at ten years after the completion of the bridge are analysed. The analysis result is useful to the construction analysis and design of the bridge to a certain extent.
    本文以重庆石板坡长江大桥为工程背景,采用CEB-FIP(MC90)的徐变模型,对成桥十年后该桥的徐变效应引起的桥梁变形、内力和预应力损失进行了计算分析,分析结果对该类桥梁的施工分析及设计具有一定的借鉴作用。
    To ensure all segments under construction to approach corresponding construction segmental reasonable states in both configuration and mechanics states and good behavior of structure after completion,escaping from all kinds of accidents in whole process of construction with high efficiency,safety,excellent quality of engineering achieved,the grey prediction model NGM(1,1) was proposed to fit prediction of any raw grey series by studying grey causes and whitening results based on the normalized mapping rules;
    为了保证实际施工中结构各节段在构形和受力状态两方面逼近施工节段合理状态,避免事故发生,确保工程高效、安全、优质,基于归一化映射规则,研究灰因和白果,提出了适应任意灰序列的灰预测模型NGM(1,1);
    Control and management of engineering cost of port construction are a dynamic process. The method of overall process management and emphases in the stages for decision-making for investment,designs,implementation and completion of a project are analyzed in the paper in order to improve the investment results.
    港口建设工程造价的控制与管理是一个动态的过程,文中重点分析了在项目投资决策阶段、项目设计阶段、项目实施阶段和竣工阶段全过程造价管理的方法与侧重点,以提高投资效益。
    AN OPTIMUM COMPLETION STATE METHODFOR THE CONSTRUCTION CONTROLOF RC CABLE-STAYED BRIDGES
    混凝土斜拉桥施工控制的最佳成桥状态法
 

首页上一页12345下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社