助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[135]条 当前为第1条到20条[由于搜索限制,当前仅支持显示前5页数据]
 

相关语句
高坝
    Study on Hydrodynamic Characteristics and Safety of Protecting Structure in High Dam Plunge Pool
    高坝消力塘水动力特性与防护结构的安全研究
    Mechanical Behavior and Analysis Theories of Crossfeed between High Dam Body and Complex Foundation
    高坝坝体与复杂坝基互馈的力学行为及其分析理论
    Numerical Simulation and Experiment Study on Flood Discharge and Energy Dissipation of High Dam with Large Discharge
    高坝大流量泄洪消能数值模拟及实验研究
    Stability Study on Saturated-Unsaturated Fracture Rock Slope under Atomized Rain of High Dam
    高坝泄洪雾雨作用下饱和非饱和裂隙岩质边坡稳定性研究
    SOME EXPLORATIONS ABOUT SANXIA HIGH DAM ON YANGTZE RIVER
    关于長江三峡建造高坝的一些探讨
    Study on Rock Mass Engineering for High Dam Foundation
    高坝坝基岩体工程研究
    Some displacements of foundation rock adjacent to high dam
    高坝附近基岩的一些变位现象
    Inversion analysis on field displacement observation data of high dam and rock foundation
    高坝岩基原位观测位移资料的反馈分析
    Computing Method for the Design of Cascade Stilling Basins for High Dam Spillways
    高坝溢洪道阶式消力池水力计算
    Numerical Methods of Whole Process Simulation and wide Angle Analysis in High Dam Rock Engineering
    高坝岩石工程中全过程模拟与广角度分析的数值方法
    The Effect of Age of Loading and Aggregate Gradation on theFracture Energy (G_F)and Fracture Toughness (K_(IC))of High Dam Concrete
    龄期及粗骨料级配对高坝混凝土断裂能G_F和断裂韧度K_(IC)的影响规律
    Shearing strength parameters for RCC Iifts of Longtan high dam
    龙滩高坝碾压混凝土的层间抗剪强度参数
    Determination of atomized concentration by β-ray method during flood discharge from high dam
    用β射线测定高坝泄洪雾化浓度
    Hydraulic study on using the river diversion tunnel for high dam as a permanent spillway tunnel
    高坝施工导流洞改为永久竖井泄洪洞水力学研究
    Study on Discharge Coefficient for Steady Free Outflow under a High Dam Spillway Gate
    高坝平板闸门闸孔恒定自由出流流量系数研究
    Research on Engineering Properties under High Dam Stress Condition of Wide Graded Gravel Soil Material
    砾石土宽级配土料在高坝应力状态下工程性质的研究
    Prototype Observation about Discharge Atomization Pollution at High Dam
    高坝泄流雾化环境污染原体观测研究
    Optimization Study On Trajectory Bucket-type Dissipator of Chai Shitan High Dam
    柴石滩高坝挑流消能工体型优化研究
    By the year 2020, when the exploitation works should be completed, about 17.2 million m3 of ash and waste products will have been inbuilt into the high dam reaching its end altitude of 110 m.
    到2020年,当开采工程结束时, 大约17.2×106m3的粉灰和废弃产品将会汇聚成这座最终高度达110m的高坝
    A Study of the Velocity Measuring Methods and Their Instruments for the High Dam Aerial Water Jet Nappe Flow
    高坝空中挑射水流流速量测方法和仪器的研究
 

首页上一页12345下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社