助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[104]条 当前为第1条到20条[由于搜索限制,当前仅支持显示前5页数据]
 

相关语句
水电站
    Tests and Studies of the Rock Mass Stress Field of the Undefground Powerhouse Area of Longtan Hydropower Station
    龙滩水电站地下厂房区岩体应力场的试验研究
    BLASTING TECHNIQUE ADOPTED IN RIGHT BANK OF YANTAN HYDROPOWER STATION DURING THE FOUNDATION EXCAVATION OF DAM AND PLANT
    岩滩水电站右岸厂坝基础开挖爆破技术
    The method of parametrized solid model for CAD of draft tube in hydropower station and its realization
    水电站尾水管CAD的参数化实体造型方法及实现
    Engineering geologic conditions and soft foundation dealing of the Panzhongtan hydropower station rebuilding project
    盘中滩水电站改建工程基础工程地质条件及软基处理
    STRUCTURAL CHARACTERISTICS AND REGIONAL STABILITY EVALUATION AT NIULIN HYDROPOWER STATION
    皖南牛岭水电站构造特征与区域稳定性评价
    INTERPRETATION OF REMOTE SENSING IMAGE FOR ENGINEERING GEOLOGY OF 500kV TRANSMISSION LINE ENGINEERING BETWEEN DACHAOSHAN HYDROPOWER STATION AND KUNNAN TRANSFORMER SUBSTATION
    大朝山水电站昆南变电站500kV送电线路工程工程地质遥感图像解译
    2-D DEM and FEM Analysis on Stability of Depo sit Body in Front of Dam on the Left Bank of Xiaowan Hydropower Station
    小湾水电站左岸坝前堆积体在自然状态下稳定性的平面离散元与有限元分析
    STUDIES ON INFLUENCE OF DEEP CRACKS ON SLOPE STABILITY ON LEFT BANK OF A HYDROPOWER STATION BY FLAC 3D
    某水电站左岸深裂缝对工程荷载下边坡稳定性影响的FLAC~(3D)分析
    Controlled quarry blasting for dam-filling materials in spillway at Gongbo Gorge Hydropower Station
    公伯峡水电站溢洪道坝料开采爆破控制
    Controlled blasting demolition of second auxiliary pant at Fengtan Hydropower Station
    凤滩水电站二副厂房控制爆破拆除
    Controlled blasting technique adopted in excavation of the united inlet of Jilintai Hydropower Station in Xinjiang
    新疆吉林台水电站联合进水口开挖中的控制爆破
    Vibration monitoring for fresh concrete during plant foundation rock blasting at Gongbo Gorge Hydropower Station
    公伯峡水电站厂房基础岩石开挖爆破对新浇混凝土振动影响监测成果
    CONTROL STUDY OF BLASTING VIBRATION OF UNDERGROUND CHAMBER OF HYDROPOWER STATION
    某水电站地下洞室爆破振动控制研究
    STUDY ON BLASTING VIBRATION CONTROL OF CREEP MASS SLOPE OF LONGTAN HYDROPOWER STATION
    龙滩水电站蠕变体边坡的爆破振动控制研究
    Excavation Blasting for Diversion Tunnel at the Right Bank of Longtan Hydropower Station
    龙滩水电站右岸导流洞开挖爆破实践
    STUDY ON THE DYNAMIC CHARACTERISTICS OF NANYA VILLAGE GULLY DEBRIS FLOW OF LIZIPING HYDROPOWER STATION
    栗子坪水电站南桠村沟泥石流运动特征研究
    Explosive demolition of cofferdam and rock-dyke of water conveyance tunnelon of Xiaowan Hydropower Station
    小湾水电站导流洞进出口围堰及岩埂的爆破拆除
    USE OF CONTROLLED BLASTING FOR RAPID EXCAVATION OF BASE ROCK IN HYDROPOWER STATION
    用控制爆破技术快速开挖水电站岩石地基
    Safety monitoring and stability analysis on old landslide at plantback slope of Zhelin Hydropower Station
    柘林水电站厂房古滑坡变形监测及稳定性分析
    BLASTING TESTS FOR EXCAVATION OF HIGH AND STEEP SLOPES AT XIAOWAN HYDROPOWER STATION
    小湾水电站高陡边坡开挖爆破试验
 

首页上一页12345下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社