助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[30]条 当前为第1条到20条
 

相关语句
电站
    The Measures and Practice of Solving Sediment Problem for Liujiaxia Hydropower Station
    刘家峡水电站泥沙问题的解决措施与运用实践
    Influence of Construction of Shuikou Hydropower Station on Minjiang RiverMouth Area
    水口电站建设对闽江河口区的影响
    Study on the Integer Hydraulic Model Tests of Wentoukou Hydropower Station
    温头口电站整体水工模型试验研究
    Experimental Study on Reservoir Scour Funnel before Dam at Luogu Hydropower Station
    洛古电站坝前冲刷漏斗模型试验研究
    Study on Hydraulic Test in Flood-releasing Structure of Qianfoyan Hydropower Station
    千佛岩水电站泄洪建筑物水力学试验研究
    Numerical Simulation with Sloping Ceiling Tail Water Tunnels for Right Bank Underground Hydropower Station of the Three Gorges Project
    三峡地下电站变顶高尾水洞水力过渡过程数值模拟
    Discussion of hydropower station model test and junction arrangement of Shaoguan Gulf
    韶关湾头电站模型试验及枢纽布置中若干问题探讨
    Based on the data of a hydropower station,the small fluctuations′ calculation and further comparison & analysis are done under the consideration of the water elasticity and not.
    结合某实际电站的基本资料,分别在考虑水体弹性和不考虑水体弹性情况下,采用不同的计算方法,研究其小波动稳定性,并进行了比较分析.
    Sedimentation Situation in Front of Liujiaxia Hydropower Station Dam and Tao River Reservoir Area and the Necessary Corresponding Treatments
    刘家峡水电站坝前和洮河库区泥沙淤积状况及应采取的对策
    Flow check of Zhong-xia (hydrology test) hydropower station
    中峡水文实验电站流量的率定
    Summa on hydropower station inlet configuration optimizing test research for Three Gorges Project
    三峡电站进水口体形优化试验研究综述
    Research on hydraulic characteristics for intake emergency gate of Three Gorges Hydropower Station
    三峡电站进水口平面快速事故闸门水力特性试验研究
    A Predictive Analysis of Effect of Typical Daily Operating Modes on Lower River Reaches of Jinghong Hydropower Station
    景洪水电站典型日运行对下游河道影响预测
    Experimental study on flood discharging from the roof of the plant in Gouxi hydropower station gorge of the Yellow River temple jointly releases floodwater
    黄河寺沟峡水电站厂顶泄洪试验研究
    With the swift development of the hydroelectric project in our country, a set of large or extraordinary hydropower stations are being designed or constructed, such as the Three Gorges hydropower station, Longtan hydropower station, Xiangjiaba hydropower station, Xiaowan hydropower station, Pengshui hydropower station etc. All these hydropower stations adopt underground workshop, and have long diversion pipe system, and have one or two surge-chambers or adopt tailrace tunnel with sloping ceiling.
    随着我国水电事业的迅速发展,一批大型、特大型水电站正在设计或处于待建之中,如三峡水电站、龙滩水电站、溪洛渡水电站、向家坝水电站、小湾水电站、乌江彭水水电站等,这些电站多采用地下厂房,具有较长的引水发电系统,并且设有调压室或采用变顶高尾水洞。
    After the steep sluice slope of hydropower station in cascade No. 1 at Kaqun was built and used in 1995,bend current has been always thrown out the side wall of concave bank,at the same time no water at its convex bank when the sluice flow is at 28 m 3·s -1 (design discharge 60 m 3·s -1 ,maximum discharge 70m 3·s -1 )because of existing a irrational shape design of bend here.
    卡群一级电站泄水陡坡于1995年底建成运行后,由于弯道体型设计不合理,当泄水流量为28m3s-1(设计流量为60m3s-1,加大流量为70m3s-1)时,弯道水流已甩出凹岸边墙,而弯道凸岸基本上处于无水状态。
    For example,at Wawushan hydropower station,vnrintion of lifting force during closing of gate is calculated. The calculation results are compared with that of model tests.
    以瓦屋山电站为例,计算了闸门关闭过程的吊力变比过程,并与模型试验结果进行了比较.
    With this method,two seismic profiles in the Sanbanxi hydropower station were processed, and the results are quite consistent with theborehole data.
    用该方法处理了三板溪水电站工区的两个地震剖面,处理结果与钻孔资料对比,一致性较好。
    There exists a vacillated riverbed, about 2km wide, around the Najin hydroelectic station on the Lasa river. Based on velocity field analysis and model test, an optimal scheme was chosen for the setting of silt releasing sluice. Consequently, the back flow in the reservoir of the hydropower station was eliminated.
    拉萨河纳金电站具有宽约 2 km的游荡型河床 ,通过流场分析及试验研究 ,优选出冲沙闸设置的最佳方案 ,从而消除了前池的大回流流态 ,减轻了泥沙淤积危害 ,提高了库区的防洪能力
    The effects of unsteady flow downstream the hydropower station dut to flood discharge and load regulation on the operation of ship lift are studied in a hydraulic model test.
    本文介绍了水口电站因泄洪与电站负荷调节引起的坝下往复波流对垂直升船机运行影响的水力学试验成果 . 在试验研究的基础上提出以下成果 :承船厢与航道中影响波高值的因素 ;
 

首页上一页12下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社