助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[104]条 当前为第21条到36条[由于搜索限制,当前仅支持显示前5页数据]
 

相关语句
水电站
    Control of Blasting Vibration of Rock Anchor Beam in Underground Factory of Qiaoqi Hydropower Station
    硗碛水电站厂房岩锚梁爆破振动控制研究
    Construction Technology of Excavation and Blasting for Left Bank Abutment Slot of Xiaowan Hydropower Station
    小湾水电站左岸坝肩槽开挖造孔及爆破施工技术
    BLASTING DEMOLITION OF COFFERDAM INLET OF WATER DIVERSION TUNNEL AT GOUPITAN HYDROPOWER STATION
    乌江构皮滩水电站导流隧洞进口围堰爆破拆除
    Design and construction for blasting of power house side slope for Zhikong Hydropower Station
    直孔水电站厂房边坡石方爆破设计及施工
    Analysis of Key Problems of Explosive Demolition for Cofferdam of Water Conveyance Tunnel on Large Hydropower Station
    大型水电站导流洞围堰拆除爆破关键问题分析
    Hazard Evaluation of Landslides at the Bank of Reservoir of a Hydropower Station in the Upstream of Daduhe River
    大渡河上游某水电站库区滑坡的危险性评价
    Excavation Blasting of High Slope in Guizhou Guangzhao Hydropower Station
    贵州光照水电站高边坡开挖爆破
    Experimentation on Judging Standard of Blasting Vibration Safety in High Slope Excavation of Xiaowan Hydropower Station
    小湾水电站高边坡爆破震动安全判据试验研究
    Presplit Blasting Construction and Quality Control for High Slope of Intake at Left Bank of Xiluodu Hydropower Station
    溪洛渡水电站左岸进水口高边坡预裂爆破施工与质量控制
    Study on the formation and dynamic characteristics of debris flows located in a hydropower station in Southwestern China
    西南某水电站泥石流形成条件及运动特征研究
    Application of Controlled Blasting to the Excavation of the Underground Powerhouse of Longtan Hydropower Station
    控制爆破技术在龙滩水电站地下厂房开挖中的应用
    Numerical Simulation and Study on Blasting Excavation of Underground Powerhouse of Hydropower Station
    水电站地下厂房开挖爆破数值模拟与研究
    The mean content of sand in water is about 190 kg/m3 and the maximum content is over 1200 kg/m3 in this hydropower station.
    巴家嘴水电站年均含沙量为190kg/m3,最大含沙量为1200kg/m3。
    it has been frist applied to the runner band seal of A430 runner that was operated on 2# hydraulic turbine of Bajiazui hydropower station Gan Su province.
    首次将该密封形式应用于甘肃巴家嘴水电站2#机A430转轮下止漏环的设计中。
    Based on the analysis on the environment and geology at the ditching position of 1 ̄# road on the left side of the gate dam of Dongxiguan Hydropower Station,the control of blasting parameters and detonation method used in complicated environment and geology are put forward.
    通过对东西关水电站闸坝工程左岸1#路沟槽开挖部位的环境条件和地质条件的深入分析,提出了复杂环境和复杂地质条件下的控制爆破参数及起爆方法,达到了预期的爆破效果
    The underground workshop of Zhouning Hydropower Station is a large chamber with size of 66.82 m× 17.90 m×42.20 m(L×H×W ); its wall rock is lengthened crisp and whole granite.
    周宁水电站地下厂房尺寸为66.82m×17.90m×42.20m(长×宽×高)的大硐室,其围岩为新鲜完整的钾长花岗岩。
 

首页上一页12345下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社