助手标题
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
共[40]条 当前为第1条到20条
 

相关语句
风险分析模型
    Optimization and Risk Analysis Model of Project Investment and Financing
    项目投资与融资方案优化及风险分析模型
    Risk analysis model of supplying power company under TOU price
    分时电价下供电公司盈亏风险分析模型
    Risk Analysis Model of Bidding Energy for Hydropower Plants and Its Application
    水电厂竞价电量的风险分析模型及应用
    Risk Analysis Model Based on Probabilistic Neural Network in Underwriting Area
    基于概率神经网络的核保风险分析模型
    Risk Analysis Model for Firepower Companies under Coal-Electricity Price Linkage
    煤电价格联动下火力发电企业的风险分析模型
    Research of Risk Analysis Model Based on Rewriting System
    基于重写系统的风险分析模型研究
    Study on the Risk Analysis Model of Project Management of Ocean Engineering
    海洋工程项目管理风险分析模型研究
    3. Based on the risk analysis methods of water resources system and water demand and supply model, a risk analysis model of regional water supply and utility system with large reservoir groups is put forward.
    (3)依据水资源系统风险分析方法,结合水资源供需分析模型,提出了具有大型水库群的区域供用水系统风险分析模型
    Then, we study the important using of Data Mining technologies in Bank CRM System. A Financial Risk Analysis Model is built based on BP algorithm, and the customer financial data are analyzed by applying this model.
    最后介绍了数据挖掘技术及其在商业银行客户关系管理体系中的重要作用,并以神经网络的BP算法为基础建立了商业银行客户财务风险分析模型,对商业银行的客户财务数据进行了分析,将数据挖掘的应用具体化。
    Based on the risk analysis model of the levees, the method of assessment is studied in this paper.
    本文在建立堤防工程风险分析模型的基础上,对堤防工程进行了风险评价,主要研究内容如下:
    The risk analysis model is set up to risk analysis of water supply system.
    建立风险分析模型,进行了供水系统的风险性分析。
    Purchasing Risk Analysis Model & Management Tactics Research on Power Grid
    电网企业购电风险分析模型及管理策略研究
    establishes risk analysis model of preventing flood in urban areas, indefinite evaluating model; sets up the model of drainage charges and an evaluating index system for cities which economize on water.
    建立了城市防洪标准的风险分析模型、模糊评价模型,以及排污收费模型和节水城市的评价指标体系。
    Lastly, the risk-tree analysis method is put forward to develop the fiscal risk analysis model. To sum up, what the dissertation has made is to contribute to broadening and improving the existing theories of fiscal risk evaluation and control.
    三是提出了风险树分析法,并建立了财政风险分析模型,这些都对拓展和创新现有的财政风险评估和控制理论做出了一定的贡献。
    On the basis of current scientific knowledge, risk analysis model of transmitting BSE by cosmetics was set up with the theory of risk analysis from the respects of hazard identification, release assessment, exposure assessment, consequence assessment, risk assessment and risk management etc. in this study.
    本研究以现有的科学知识为基础,系统地运用风险分析理论,分别从危害因素的确定、传入评估、接触评估、后果评估、以及风险评价和风险管理等各方面切入,建立了有关化妆品成份传播疯牛病的风险分析模型
    Moreover, the basic risk analysis model is in the person of an idea Aimed at the weakness of the index method, adjusted the mark scopes applied the results of AHP.
    另外,基本的风险分析模型体现的是一种思想和方法,但是对特殊运行环境下的管线进行风险评价时应该根据评估者的目的,在不明显增加评价费用的前提下对基本模型进行修正和改进。
    The diversion risk analysis model analyses a series of uncertain factors during the diversion such as hydrologic factors, hydraulic factors.
    导流风险分析模型分析了施工导流过程中的不确定因素,如水文不确定性因素、水力不确性因素。
    Finally, this paper builds risk analysis model which based on the result of data mining. Further more, by qualitative and quantitative risk analysis, this paper actualizes the comprehensive study of slope risk's natural characteristic, disaster consequence, types of uncertain factors and their effect on decision-making process, and accurately gains the reasonable safety assessment result, also gets the goal of realizing slope's safety evaluation.
    本文在数据挖掘结果的基础上建立了边坡安全的风险分析模型,通过定性和定量分析,实现对边坡风险本身的自然特性、灾害后果、不确定因素的类型以及它们对决策过程的影响进行综合研究,并得出精确合理的预测结果,达到了对边坡实施安全评价的目的。
    Based on the study of the update materials and documents, this paper conducts adetailed research of the risk analysis model.
    作者在研究分析现有相关文献资料的基础上,针对我国海洋工程项目管理的具体情况,进行了风险分析模型研究。
    Thirdly, the risk analysis model of offshore engineering project management isbuilt on the base of recognition and distinguishing of risk resources in such factors asorganization, the comprehensive ability of the manager, build and installation,procurement and design of offshore project management.
    再次,通过对海洋工程项目管理中组织机构、管理人员的综合水平、建造与安装、采办和设计方面风险源的辨识,建立了海洋工程项目管理的风险分析模型
 

首页上一页12下一页尾页 

 
CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社