f) to explain the determinante methods of basic parameters, in which concluding the gross output of exploitation, rate of mining less and recovery, rate of mining dilution, rate of ore dressing recovery, rate of concentrate, rate of fine minerals, ratio of ore dressing, quantity of fine minerals, cost of adopting dressing and smelting, scale of mine production, service life of mine,capital investment of mine,stripping ratio etc thirteen parameters;
According to the features of ore deposit and the productive practice,the Piaotang Tungsten Mine makes a research to the new ways of winning management of resource reserves: depending on science and technology development,reasonable engineering layout,stick to "3 ratios" management(winning ratio of mining,mining dilution ratio,ore dressing recovery percentage),broadening sources of income and reducing expenditure,improving the development of enterprise production and stable increasing of economic profits.
The result shows clearly that a production management was controlled thus the indexes of ore loss and dilution ratio were reduced and the ore dressing recovery percentage was raised and economic profits were achieved.
According to the requirement of market on quality of products and index of improving the quality of products and mineral processing recovery efficiency,problems in ore matching work were analysed and comprehensive measures were raised.
It showed that the reformed process flow was unblocked. stable and adaptable to ore property. As a result,the recovery rate of ore dressing improved from 88.55% to 93.16%,the treatment capacity improved from 100t/d of design to 200t/d,the unit treatment cost decreased from $145.54 to $105.90 and the accumutative total of economic benefit reached $7.4266 millions.