助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   快速返回 的翻译结果: 查询用时:0.017秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

快速返回
相关语句
  “快速返回”译为未确定词的双语例句
     Functional Test of 50 % Load Run back in 300 MW Unit
     300MW 机组 50% 负荷快速返回功能试验
短句来源
     Last, according to these, the design is altered and revised with the assistance of CAD and returns to construction repidly.
     在施工前阶段研制的有关计算机辅助设计系统的帮助下,按新的工程地质条件变更设计,快速返回施工中,指导施工。
短句来源
     In order to enhanced the automation level of the unit, one ID fan was artificially tripped to produce a 50% load Runback and thus a large disturbance was introduced for testing the performance of the coordinating control system.
     为了提高该机组的自动化水平,特地通过跳一台送风机产生50%负荷快速返回人为对机组引入大扰动,以对该机组的协调控制系统进行考验。
短句来源
     Also the design method for run back(RB) function after tripping off of coal pulverlizer group is approached. 
     还探讨了磨煤机组跳用快速返回(RB)功能的设计方法。
短句来源
     It is demonstrated by numerical simulation that the trade- off is superior to the devices using unlocalized lifetime control, the forward on-state voltage can be reduced by 0.6-1.4 V at the same turn-off speed, and it can avoid the snap-back phenomena of anode-short structure.
     数值模拟表明,该器件的t_f~V_F折衷关系优于采用非局域寿命控制的器件,在相同关断速度下其正向压降可降低0.6~1.4 V,避免了阳极短路结构的正向快速返回现象。
短句来源
更多       
  相似匹配句对
     quick;
     快速
短句来源
     THE RAPID SEQUENCING METHOD
     快速排序法
短句来源
     Furthermore,they must return quickly to normal operation.
     而且,风机必须快速返回至正常操作。
短句来源
     Functional Test of 50 % Load Run back in 300 MW Unit
     300MW 机组 50% 负荷快速返回功能试验
短句来源
     RETURN TRAJECTORY OF SPACE SHUTTLE
     航天飞机返回轨道
短句来源
查询“快速返回”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  rapid return
A well-equipped and prepared sideline provider can have a great impact on the proper care of acute sports skin injury and more rapid return to play.
      
Several animal studies have demonstrated that PTH therapy consisting of daily subcutaneous injections during repair leads to increased callus volumes and a more rapid return of bone strength.
      
Apparent advantages are the limitation of the laparotomy to the location of the stoma, rapid return of bowel function and less postoperative discomfort and morbidity, especially when intestinal diversion is required as an independent procedure.
      
The occurrence of nearly identical episodes was remarkable, as well as the relatively rapid return to normal consciousness and neurological status after deep coma.
      
Post-suction hyperinflation induced a rapid return of the PO2 to control levels.
      
更多          


Owing to complaxity of geological conditions and limitation of explorating work before construction, revision and alteration of the design of construction details are normal things in construction stage. Alterable Geo-design includes the following ways. First, design before construction is prepared to fully alter. Then, new geological, deformation and failure informations and their engineering significance are fed back immediately. Last, according to these, the design is altered and revised with the assistance...

Owing to complaxity of geological conditions and limitation of explorating work before construction, revision and alteration of the design of construction details are normal things in construction stage. Alterable Geo-design includes the following ways. First, design before construction is prepared to fully alter. Then, new geological, deformation and failure informations and their engineering significance are fed back immediately. Last, according to these, the design is altered and revised with the assistance of CAD and returns to construction repidly. The authors take some real engineering examples to illustrate that feeding back and analysing these informations and ensuring normal flow of them are the key for optimum design. It is necessary to bring the design into design norm formally.

由于工程地质条件的复杂性和施工前勘探工作量的限制,边坡施工详图设计在施工阶段进行修正、变更是正常的。可变更地质设计就是施工前设计做好变更的充分准备;施工中及时反馈新的地质和变形信息,分析其工程意义;在施工前阶段研制的有关计算机辅助设计系统的帮助下,按新的工程地质条件变更设计,快速返回施工中,指导施工。本文以施工阶段变更设计的工程实例说明边坡设计、施工中及时反馈加工处理新获得的信息,保证信息正常流动对优化设计是十分关键的。把可变更地质设计正式纳入边坡设计规范是十分必要的。

The coordinating control system and the pre commissioning operation of the Waigaoqiao Power Plant′s No.2 unit are described. In order to enhanced the automation level of the unit, one ID fan was artificially tripped to produce a 50% load Runback and thus a large disturbance was introduced for testing the performance of the coordinating control system.

介绍了外高桥电厂2号机组的协调控制系统方式及试运情况,运行状况良好。为了提高该机组的自动化水平,特地通过跳一台送风机产生50%负荷快速返回人为对机组引入大扰动,以对该机组的协调控制系统进行考验。

The coordinate control system of generating unit is designed using unidirectional decoupling design technology.Taking large delay property on boiler side in turbine following mode into account,the adapting Smith preestimator is employed.In order to compensate strong coupling property in boiler following mode,the adapting feedward control loop of boiler is employed.Also the design method for run back(RB) function after tripping off of coal pulverlizer group is approached.

采用了单向解耦设计技术设计了单元机组协调控制系统。考虑到机跟炉方式锅炉侧的大迟延特性,系统采用了具有自适应特性的SMITH预估器。为了补偿炉跟机方式下的强烈耦合特性,采用具有适应性的锅炉前馈控制回路。还探讨了磨煤机组跳用快速返回(RB)功能的设计方法。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关快速返回的内容
在知识搜索中查有关快速返回的内容
在数字搜索中查有关快速返回的内容
在概念知识元中查有关快速返回的内容
在学术趋势中查有关快速返回的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社