助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   主要硐室 的翻译结果: 查询用时:0.007秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

主要硐室
相关语句
  “主要硐室”译为未确定词的双语例句
     Renewing thinking of design work,improving layout of drift plane,changing the shape of cross section of the main room floor ,the overall design of central substation of main inhalation dewatering pump room in underground mine can be optimized.
     更新设计思路,改进巷道平面布置方式,改变主要硐室底板横截面形状,可以优化地下矿山吸入式主排水泵房和中央变电所整体设计。
短句来源
  相似匹配句对
     Suporting Design of Main Haulage Roadway and Room in Weak Coalbed
     松软煤层中主要运输巷道及硐室支护设计
短句来源
     Some Problems on Deciding Main Parameters of Chamber Blasting
     硐室爆破主要参数确定的若干问题
短句来源
     The main achievement in this paper are:
     主要研究结果是:
短句来源
     The following are the main results:
     其主要结果为:
短句来源
查询“主要硐室”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Renewing thinking of design work,improving layout of drift plane,changing the shape of cross section of the main room floor ,the overall design of central substation of main inhalation dewatering pump room in underground mine can be optimized.

更新设计思路,改进巷道平面布置方式,改变主要硐室底板横截面形状,可以优化地下矿山吸入式主排水泵房和中央变电所整体设计。

>=Through optimizing the pass loads the system to the main shaft of roadway and the construction organization design, the main shaft lading system of main room, chamber. roadway arrange to run parallel with a relation of layer was analyzed in order to reasonably arrange the proper construction order of the mineral engineering and installation engineering and the proper route of debris of mineral engineering. The main shaft to load the system construction work was shortened to expect 2. 5 months under well using...

>=Through optimizing the pass loads the system to the main shaft of roadway and the construction organization design, the main shaft lading system of main room, chamber. roadway arrange to run parallel with a relation of layer was analyzed in order to reasonably arrange the proper construction order of the mineral engineering and installation engineering and the proper route of debris of mineral engineering. The main shaft to load the system construction work was shortened to expect 2. 5 months under well using of space and times organize homework.

通过对主井装载系统的巷道及施工组织进行优化,分析主井装载系统的主要硐室、巷道布置和层位关系,合理安排矿建工程、安装工程的施工顺序和矿建工程出矸路线。充分利用空间和时间组织平行作业,缩短了主井装载系统建设工期2.5个月。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关主要硐室的内容
在知识搜索中查有关主要硐室的内容
在数字搜索中查有关主要硐室的内容
在概念知识元中查有关主要硐室的内容
在学术趋势中查有关主要硐室的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社