助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   主加速器 的翻译结果: 查询用时:0.01秒
图标索引 在分类学科中查询
所有学科
核科学技术
更多类别查询

图标索引 历史查询
 

主加速器
相关语句
  main accelerator
     The Heavy Ion Research Facility of Lanzhou (HIRFL) consists of ion sources, injector Sector Focusing Cyclotron (SFC) and main accelerator Separated Sector Cyclotron (SSC).
     兰州重离子研究装置(HIRFL)是由离子源,注入器(扇聚焦回旋加速器,SFC)和主加速器(分离扇回旋加速器,SSC)组成的。
短句来源
     The designed frequency of the dipole mode TM_110 is 1.3 GHz,which is equal to the frequency of the main accelerator in PKU-FEL Facility.
     该BPM腔采用的偶极模TM110模的频率与PKU-FEL主加速器的基模频率一致,都是1.3 GHz;
短句来源
     The beam produced by the ion sources is pre 梐ccelerated by injector SFC, and injected into main accelerator SSC, after passing through the former beam line. Then, the beam is accelerated to the maximum energy and transported to the experimental terminals through the post beam lines.
     由离子源产生的束流经过注入器SFC的预加速后,通过前束流线注入到主加速器SSC,束流在主加速器加速到最大能量后,由后束流线送到各个实验终端。
短句来源
     Many improvements of the vacuum, RF, contrul and other systems of the main accelerator SSC ofHIRFL were finished.
     对主加速器SSC的真空、高频、控制等系统作了大量完善性改进工作。
短句来源
  “主加速器”译为未确定词的双语例句
     Based on it, the beam loading in PKU SCAF has been researched. With the 10 kW input power, the optimal average current in the 9 cell SC cavity of PKU SCAF is 1.5 mA, accelerating voltage is 6.6 MV, and β factor is 4.5×10 3.
     计算结果表明,当主加速器馈入功率为10kW时,最佳束流负载为1 5mA,此时电子增能为6 6MeV,β因子为4 5×103。
短句来源
     This Paper beseribes the vacuum System of the Lanzhou heavy ion cyclotron.
     本文介绍了兰州重离子加速器主加速器的真空系统的设计与建造。
短句来源
     In this paper, the construct of the beam splitting arrangement between SFC and SSC has been demonstrated. The parameters of physical design are given, and related 昪alculating methods of beam transport have been stated briefly.
     本文就中国科学院近代物理研究所重离子加速器SFC注入器与SSC主加速器之间设立束流分束装置的可行性作了论证,给出了物理设计的主要参数,并介绍了相应的束流输运计算方法。
短句来源
     n this paper, the SSC ion beam diagnostic system on the console of HIRFL in our institute is presented. We can transfer information between console and diagnostic system via DECnet communication. The central computer for HIRFL console is VAX8350, the working computer of diagnostic system is changed from IBM PC/XT to COMPAQ 486, and the operating program is rewritten from FORTRAN to C.
     本文讲述了HIRFL的主加速器SSC束流诊断系统挂接中控台的工作,利用网络通讯,在微机束流诊断系统和VAX计算机之间进行信息传递,从而该系统的所有操作都可以在中控台上完成,中控台的工作母机是VAX计算机。
短句来源
     The research activities for accelerator structures at SLAC are reviewed including the achievement via the main linac design for the Next Linear Collider (NLC), the program adjustment after the decision of the International Linear Collider (ILC) to be based on superconducting technology, and the work progress for the ILC, photon science at SLAC and basic accelerator structure studies.
     评述近年来加速器结构在SLAC的研究和发展.内容包括:通过下一代直线对撞机(NLC)的研究取得的成果; 在决定国际直线对撞机采用超导主加速器以后研究工作的调整和进展.
短句来源
  相似匹配句对
     Experimental Study on the Main Switches of"Chenguang" Accelerator
     “晨光号”加速器开关的实验研究
短句来源
     Optimization design of the main switch in 12MeV linear induction accelerator
     12MeV直线感应加速器开关的优化设计
短句来源
     Accelerator-Based Atomic Physics
     基于加速器的原子物理学
短句来源
     Linear Induction Accelerator
     直线感应加速器
短句来源
     Separation of main work and non-main work;
     辅分离;
短句来源
查询“主加速器”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  main accelerator
In brief, negative helium-4 atoms were generated by a radio-frequency charge exchange source and pre-accelerated to the main accelerator.
      


A method of synchronous transfer of beam from the booster to the main ring isproposed. In order to meet the character of the BPS, the ratio of the radii is notstrictly equal to the harmonic ratio between two machines. The physical picture andthe choice of parameters in this method are discussed.

本文针对曾经设计的北京质子同步加速器(简称BPS)其增强器引出能量接近临界能量的特点,提出了主加速器与增强器周比不严格等于高频谱波数之比的束团同步传输方法,并对该方法的物理图象及有关参数的选择原则作了探讨。

This Paper beseribes the vacuum System of the Lanzhou heavy ion cyclotron. A monolithic vacuum chamber with a volume of 100 m~3 has been installed in situ. The Pumping system is composed of eight RKP-800 cryopumps, two TPH 5000 turbo-molecular pumps, two ZJZ-600 Roots pumping units and a liguid nitrogen supply system. A pressure of 8.10~(-6) Pa in the vacuum chamber was obtained during the first evacuation in September of 1986.

本文介绍了兰州重离子加速器主加速器的真空系统的设计与建造。一台一百立方米整体式真空室已安装就位。真空排气系统由八台φ800毫米小型氦封闭循环机械致冷机低温泵和两台大型涡轮分子泵,以及两台ZJZ-600机械增压泵组成。系统已于一九八六年九月开始运转。真空室在初次抽空中就获得了7.5×10~(-6)Pa真空度,达到了原设计要求。

In this paper, the construct of the beam splitting arrangement between SFC and SSC has been demonstrated. The parameters of physical design are given, and related 昪alculating methods of beam transport have been stated briefly.

本文就中国科学院近代物理研究所重离子加速器SFC注入器与SSC主加速器之间设立束流分束装置的可行性作了论证,给出了物理设计的主要参数,并介绍了相应的束流输运计算方法。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关主加速器的内容
在知识搜索中查有关主加速器的内容
在数字搜索中查有关主加速器的内容
在概念知识元中查有关主加速器的内容
在学术趋势中查有关主加速器的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社