助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   无井架 的翻译结果: 查询用时:0.511秒
图标索引 在分类学科中查询
所有学科
矿业工程
建筑科学与工程
更多类别查询

图标索引 历史查询
 

无井架
相关语句
  without hoist frame
     Construction practice of multi-purpose shaft without hoist frame in the second phase project in Jiguanzui Gold Mine
     鸡冠嘴金矿二期工程混合井“无井架”施工实践
短句来源
  without shaft well
     Construction technology of attached reciprocal formwork without shaft well of 120-high chimney
     120m烟囱无井架附着式倒模施工技术
短句来源
     By the construction case of the 240m-high double tube RC chimney of the plant in Ji county Tianjin, this article describes the technology for construction tube-in-tube structure RC chimney that combine 140m/12 out shaft well reciprocal formwork with without shaft well reciprocal formwork. This method is safe, economical and workable.
     本文通过天津蓟县电厂 2 4 0M双筒钢筋混凝土烟囱工程的施工实例 ,介绍采用 140M/ 12孔外井架倒模和无井架倒模相结合的施工方法 ,施工筒中筒结构钢筋混凝土烟囱的施工技术 ,该施工方法安全、经济、可行
短句来源
  “无井架”译为未确定词的双语例句
     Construction Design of Hydraulic Double-slide without Derrick for Chimney
     烟囱无井架液压双滑施工设计
短句来源
     Two-track Slippage Construction Technology Adopted in 180 Meters High Reinforcement Concrete Chimney
     180m钢筋混凝土烟囱无井架双滑施工技术
短句来源
     COMPARISON OF HYDRAULIC DECOKING WITH AND WITHOUT DERRICK
     有井架与无井架除焦方式的比较
短句来源
     The hydraulic sliding mould without the headframe was used for erection of outer cylinder of the stack. Taking the steel pipe with  48 mm×3.5 mm has greatly increased the stability in the process of sliding up.
     烟囱外筒采用无井架液压滑模施工 ,利用48mm× 3.5mm钢管作为支承爬杆 ,大大增加了滑升中的稳定性。
短句来源
     The safety technological measures of free-head-frame wall-attachment style climbing mould method in chimney construction
     无井架附壁式爬模法在烟囱施工中的安全措施
短句来源
更多       
  相似匹配句对
     Yuan is nothing but wu 无 nonexistence.
     元是
短句来源
     Construction Design of Hydraulic Double-slide without Derrick for Chimney
     烟囱井架液压双滑施工设计
短句来源
     Interventions: None.
     干预:
短句来源
     Noheadframe Reversal Mould Construction of Reinforced Concrete Chimney
     钢筋混凝土烟囱井架倒模施工工艺
短句来源
     A study of derrick reliability.
     井架可靠度计算
短句来源
查询“无井架”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  free-head
In the free-head condition, both the head and the eye display a synchronized nystagmus which add their effects.
      
The animals, placed either in the fixed-head condition (VOR) or in the free-head condition (CL-VCR) were rotated in darkness (vestibular responses) or in the presence of visual surroundings (visuo-vestibular responses).
      
In the free-head condition, both the eye and the head display a synchronized nystagmus whose effects are additive.
      
In the free-head condition, while the gaze gain is linear and close to 1 in both the frequency and the velocity domains, the head response gain (CL-VCR) remains lower especially in the low frequency and in the low velocity ranges.
      
Although the two pile groups have been previously tested under free-head conditions, testing was performed by pulling the pile groups together.
      
更多          


The construction process of hydraulic slide model without derrick are widely used in the chimney construction. In this article the engineering of 150/4.5m chimney of reinforced concrete is mainly introduced. The chimney liner, the operation platform, the hydraulic lifting system and the rertical transporation etc. have been improved and the needs of construction are met.

无井架液压滑模施工工艺在烟囱工程中已被广泛应用。本文着重介绍了150/4.5m钢筋混凝土烟囱工程,对烟囱内衬、操作平台、液压提升系统及垂直运输等部位进行了设计改进,满足了施工需要。

A hydro-lifting and sliding formwork method for the construction of the small diameter R.C.tube project is summarized as follows.The hydro-lifting and sliding service platform is composed of & parallel-chord steel trusses as the radial beams and the steel channel beams as the supporting frames being centrally concentrated at a center point.Thus,on the service platform's upper side are the triangular frame supports being used for lifting,while at its lower side is hung underneath with the spiral reinforcement...

A hydro-lifting and sliding formwork method for the construction of the small diameter R.C.tube project is summarized as follows.The hydro-lifting and sliding service platform is composed of & parallel-chord steel trusses as the radial beams and the steel channel beams as the supporting frames being centrally concentrated at a center point.Thus,on the service platform's upper side are the triangular frame supports being used for lifting,while at its lower side is hung underneath with the spiral reinforcement mountingplate.In additinon, there are the inside and outside plastering equipments and the internal and external formwork strutting equipments to help solving the vertical transportation work and the bar binding work as wellas a variety of construction difficulties.The above mentioned method has been applied for the construction ofa 300t inverted conical tank water tower project of the Yibin Wuliangye Brewery. This project has been constrcted of a fine aualitv and with a good resulf.

小口径钢筋混凝土无井架液压滑升施工的结构形式为8平行钢桁架辐射梁及槽钢承力架组成交汇中间一点的滑升结构操作平台。平台上部采用支承随升三角架,下部悬挂螺旋布筋盘,内外模板支撑及外壁抹压面挂架,解决了垂直运输、箍筋绑扎及施工的困难,宜宾五粮液酒厂300t倒锥水塔采用上述方法施工,质量优良,取得良好效果。

Equipment, operating conditions and troubles as well as investment costs for two hydraulic decoking mods, i. e, with and without derrick in delayed coking unit were introduced and compared. Decoking without derrick has gradually exhibited its superiority due to the quality upgrading of rubber tubes of the high-pressure hose and the structure improvement of hydraulic turbine etc..

介绍了延迟焦化装置有井架与无井架两种水力除焦方式的投资、设备、主要故障及生产情况,并进行了比较。由于高压水龙带胶管、水涡轮等产品的改进和质量的提高,无井架除焦逐渐显示出其优越性。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关无井架的内容
在知识搜索中查有关无井架的内容
在数字搜索中查有关无井架的内容
在概念知识元中查有关无井架的内容
在学术趋势中查有关无井架的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725