相关语句
  special geological conditions
    Selection of Boring Method for Deep Pile Foundation under Special Geological Conditions
    特殊地质条件下桥梁深桩基钻孔方法的选择
短句来源
    Discussion on construction technology for bridge pile foundation at special geological conditions
    特殊地质条件下桥梁桩基的施工工艺探讨
短句来源
    It presents the grouting technology adoptod in the tunnel and underground engineering construction under some special geological conditions of saturated dynamic watered sandbed,the related grouting materials,mechinry matching grouting technology as well as the supporting system after grouting.
    主要研究了在饱和动态含水砂层特殊地质条件下的隧道及地下工程施工中采取注浆技术 ,浅埋暗挖法有关注浆材料、注浆机械配套、注浆工艺、以及注浆后的开挖支护等综合配套技术。
短句来源
    Corresponding methods and techniques should be used to facilitate lowering the caisson foundation to the designed altitude in special geological conditions, because it may meet all kinds of geological conditions in the course of lowering the open caisson foundation.
    桥梁沉井基础在下沉的过程中,会遇到各种不同的地质条件,在特殊地质条件下如使沉井能顺利地下沉到设计标高,需要采取相应的方法和措施。
短句来源
  special geological condition
    This paper presented a set of highway construction machine optimum coordinate scheme and mechanical construction technology based on analysis of wind blown sand features test in Takla Makan, aimed at the special geological condition and the structure form of desert highway.
    针对沙漠地区的特殊地质条件和沙漠公路的结构形式,在塔克拉玛干沙漠风积沙工程特性试验分析的基础上,提出了一整套公路施工机械的优选配套方案和机械施工工艺。
短句来源
    This article mainly introduces the grouting technique used in shallow bored tunnel and underground works under the special geological condition of saturated dynamic water - bearing sand, which includes grouting material, matching equipment of grouting machinery, grouting technology and its excavation and support ofter grouting.
    文章主要介绍了在饱和动态含水砂层特殊地质条件下的浅埋暗挖隧道及地下工程施工中采取的注浆技术,其中包括注浆材料、注浆机械配套、注浆工艺以及注浆后的开挖支护等综合配套技术。
短句来源
    The article researches on the construction technique of Xianancheng Tunnel in Pengyou Highway, thinks about the construction in special geographical position and special geological condition, and then puts forward suggestions on the design and construction of highway tunnel in special geological condition.
    通过对彭酉公路A合同段下南城隧道施工技术的研究,对特殊地理位置、特殊地质情况下的施工进行了思考,提出了一些特殊地质条件下公路隧道设计与施工的建议。
短句来源
    Finally carried on the analysis about the suitable condition and scope of the short net distance tunnel,proposed that should carry on synthesis alternative option with the other pattens tunnel before used under special geological condition.
    最后对小净距隧道的适用条件和范围进行了分析,提出在特殊地质条件下应与其它隧道型式进行综合比选后采用。
短句来源
  “特殊地质条件”译为未确定词的双语例句
    Treatments for Excavation Filling Pile in Special Conditions
    特殊地质条件下挖孔桩的处理方法
短句来源
    Numerical Study on the Stability of Longtan Long Tunnel under Problematic Geological Conditions
    特殊地质条件下龙潭隧道的围岩稳定性数值研究
短句来源
    Analyzes PHC pile damage occurred in soft ground with hard surface layer according to dynamic testing records and wave transferring theory, gives out the author's suggestion for pile driving resistance evaluation and pile design in this kind of ground condition.
    针对在上硬下软特殊地质条件下出现的PHC桩打桩过程中断桩情况,结合打桩动测数据和行波理论简析断桩原因,提出对在该类土条件下打桩阻力的计算取值和桩基设计的建议。
短句来源
    This paper presents a reinforcement measures for the Longmen tunnel based on the geological condition and various distresses found during the construction period and after completion of the engineering work, as well as the monitioring,analysis and assessment of the reinforcement before the tunnel open to traffic.
    针对龙门隧道的特殊地质条件、施工中和完工后出现的各种病害现象 ,分析病害产生的原因及性质 ,在隧道投入运营前分别采取相应的加固整治工程措施治理病害 ,并对加固整治后隧道的稳定性进行监测、分析和评价
短句来源
    The author talks about some problems common in man-made excavation pile and treatments for them on that the pile foundation of 2.8m diameter of Haoshancun Bridge at southern line of Ji-Qing Freeway takes the excavation pile.
    笔者就济青南线高速公路马莱段毫山村大桥直径2.8m的桩基础采用挖孔桩的方法成孔,谈谈在一些特殊地质条件下人工挖孔桩常见问题和处理方法。
短句来源
更多       
查询“特殊地质条件”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  special geological conditions
Because of the special geological conditions of the eighth zone in the Tahe oil field, we apply seismic data structure characteristics to hydrocarbon prediction for the Ordovician reservoir in this zone.
      
-The special geological conditions in the Xiji-Langfu area are the main reason for the anomalous high macroseismic intensity caused by the Tangshan, 1976 earthquake.
      


Most ores in Jin Shah dian Iron Mine are sandy and easily cave in influence of explosion vibration and in moist air. Metal Supports were used in mining entry of this mine. but most of them had already caved. Now spouting concrete sets are used in this mine. In special geologic of this mine, the ore is supported mainly by the strength of spouting concrete itself not by increasing the strength of ore. It becomes important whether spouting concrete has enough strength to support sandy ore succesfully. The strength...

Most ores in Jin Shah dian Iron Mine are sandy and easily cave in influence of explosion vibration and in moist air. Metal Supports were used in mining entry of this mine. but most of them had already caved. Now spouting concrete sets are used in this mine. In special geologic of this mine, the ore is supported mainly by the strength of spouting concrete itself not by increasing the strength of ore. It becomes important whether spouting concrete has enough strength to support sandy ore succesfully. The strength and deformation of triple center arch and half circular arch with spouting concrete are measured by loading force radically and vertically. The strength and deformation of spouting concrete are compared with that of spouting concrete with bamboo. The results show that spouting concrete arch with 4-5cm thickness has 32-52~T/m~2 strength and less than 3mm deformation; the strength of spouting concrete with bamboo is elevated greatly: it is suitable using spouting concrete sets in this mine; the drawing in scraper drift sprouting by spouting concrete with stee is more diffircult than that with bamboo. Suggestions for design and construction of spouting concrete sets are also given in this paper.

金山店铁矿的大部分矿体呈粉砂状,在爆破震动影响和潮湿空气中极易冒落。该矿采矿进路曾使用金属支架,但多数已经塌落,现改用喷射混凝土支护,在该矿的特殊地质条件下,这种支护主要靠喷层自身强度支掌矿石,而与矿石共向支护的作用则不显著。因此,薄喷层是否具有足够的承载能力,就成为能否在粉砂状矿体中成功地进行支护的关键。本试验是通过对喷射混凝土三心拱及半圆拱施加径向及纵向荷载来测定其承载能力与变形的,并对素喷射混凝土拱和配竹筋喷射混凝土拱进行了对比。试验结果表明,厚度为4—5cm的喷射混凝土拱具有32~52~T/m~2的承载能力,下沉量均小于3mm,配竹筋后可大大提高其承裁能力;在电耙道中,喷层内配竹筋可减少因配钢筋引起的放矿困难。在该矿位于粉砂状矿体中的采矿进路,采用喷射混凝土支护是适宜的。本文还对喷射混凝土支护设计及施工中的一些问题提出了建议。

This paper presented a set of highway construction machine optimum coordinate scheme and mechanical construction technology based on analysis of wind blown sand features test in Takla Makan, aimed at the special geological condition and the structure form of desert highway. The wind blown sand subgrade dry compaction technology has many advantages, for example, simple construction, high efficiency, easy to control its quality, etc., suitable for a large scale mechanical construction.

针对沙漠地区的特殊地质条件和沙漠公路的结构形式,在塔克拉玛干沙漠风积沙工程特性试验分析的基础上,提出了一整套公路施工机械的优选配套方案和机械施工工艺。特别是风积沙路基的干压工艺,具有施工非常简单,效率高,质量易于控制等优点,适于大规模机械化施工。

The Qiling Tunnel situated at the Qanzhou-longnan section of the Beijing-JiulongRailway line is an important engineering point controlling the time limit for the project.Asthe construction works prevented by the special geological conditions of the soft-rock sectionat the entrance of the Qiling Tunnel,this point has been called as an engineering point thegreatest in the world by the Ministry of Railways.The technical measures adopted and theconstruction characteristics are described and discussed in this paper....

The Qiling Tunnel situated at the Qanzhou-longnan section of the Beijing-JiulongRailway line is an important engineering point controlling the time limit for the project.Asthe construction works prevented by the special geological conditions of the soft-rock sectionat the entrance of the Qiling Tunnel,this point has been called as an engineering point thegreatest in the world by the Ministry of Railways.The technical measures adopted and theconstruction characteristics are described and discussed in this paper.

歧岭隧道位于京九线赣龙段,是控制工期的重点工程,因进口软岩地段的特殊地质条件施工受阻,被铁道部列为“天字第一号工点”。本文论述其施工的技术措施及工程特点。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关特殊地质条件的内容
在知识搜索中查有关特殊地质条件的内容
在数字搜索中查有关特殊地质条件的内容
在概念知识元中查有关特殊地质条件的内容
在学术趋势中查有关特殊地质条件的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社