框架柱
相关语句
  “框架柱”译为未确定词的双语例句
    Manufacture of the pillars and beams of Baogang No.2 blast furnace
    包钢2号高炉框架柱梁制造
短句来源
查询“框架柱”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Rational intercolumnation of integral framework is a important design parameter for small and medium sized nonlining ferromanganese blast furnace. In this paper,an empiric formula for calculating intercolumnation of integral framework and principle to determine datum mark for each frame platforms is introduced.Method and steps for calculating are presented.Good results were obtained in practice of integral frame application.

中小型无炉衬锰铁高炉整体框架合理柱距是重要的设计参数之一。文中介绍了计算整体框架柱距的经验式及确定框架各层平台标高的原则,提出整体框架设计计算方法与计算步骤。整体框架的应用实践表明,效果良好。

Some existed problems in the structural design of blast furnace are studied by calculation and comparison. The hinged design method is analysed for the connections of fundation and columns in the frames.A reasonable calculating diagram by using plane frames is presented, and a hinged method is also recommended for the design of column base. In addition, technical and economic analysis are carried out for using more steel column with concrete core in the frames of blas tfurnace in the future.

通过高炉炉体框架结构的计算比较,对高炉炉体框架结构设计中存在的问题进行了分析,提出了按平面构架计算时的炉体框架结构计算简图,推荐了炉体框架柱与基础铰接的设计方案,对高炉结构设计中采用钢管混凝土作为炉体框架柱,提出了肯定意见并进行了技术经济分析

Manufacturing of No.2 BF is introduced here. The CB is 25570mm High and is divided into two parts, the straight line degree is guaranteed by straight line assembly and welding; the requirement that the meeting place of connected ends of the suspending beams and the corresponding beams is less than 1mm is guaranteed by adopting mechanical and flame correction methods; solid is turned into combination of planes with 'the rolling' pre-assembly method so that the area within the four c9olumns is a square with a...

Manufacturing of No.2 BF is introduced here. The CB is 25570mm High and is divided into two parts, the straight line degree is guaranteed by straight line assembly and welding; the requirement that the meeting place of connected ends of the suspending beams and the corresponding beams is less than 1mm is guaranteed by adopting mechanical and flame correction methods; solid is turned into combination of planes with 'the rolling' pre-assembly method so that the area within the four c9olumns is a square with a maximum 5mm difference of diagonal lines; the columns are vertical to the beams and the CB is linked to the platform easily by high strength screws.

2号高炉框架柱、梁使用钢结构扭剪型高强螺栓副连接。总高 2 5 5 70mm ,采用两段制造 ,直线组装焊接方法 ,保证了直线不直度符合要求 ;采取机械、火焰矫正方法 ,保证悬挑梁与相应框架梁高强螺栓连接端面高度差≤1mm ;用“滚动”预装方法 ,把立体转化为平面组合 ;保证四根立柱间距为正方形 ,对角线差小于 5mm ;立柱与四根横梁所在平面垂直 ;框架和平台在工地用高强螺栓顺利把合

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关框架柱的内容
在知识搜索中查有关框架柱的内容
在数字搜索中查有关框架柱的内容
在概念知识元中查有关框架柱的内容
在学术趋势中查有关框架柱的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社