助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   建设集团 在 石油天然气工业 分类中 的翻译结果: 查询用时:0.367秒
图标索引 在分类学科中查询
所有学科
石油天然气工业
工业经济
企业经济
建筑科学与工程
更多类别查询

图标索引 历史查询
 

建设集团
相关语句
没有找到相关双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  construction group
In 24 rats all intestinal sutures were removed 30 min after anastomotic construction (group 1), while in the remaining animals (group 2) the sutures were left in place.
      
After adjusting the age distribution of the construction group to match the distribution of agriculture group, the mean HUI3 score of the former significantly decreased.
      
Filed by Dillon Construction Group for John >amp; Jennifer Rulli.
      
Sheared DNA derived from this new prep was shipped to GSC and tested in their shotgun library construction group.
      
The consortium of local construction group Doprastav and Austrian firm Vatech Voest succeeded in clinching the contract.
      


By combination the foundation of China Petroleum Engineering (Group) Corp. and practice of HSE (Health, Safety and Environment) management system, five points are summarized and present- ed in this paper for construction enterprises in the process of establishing and implementing HSE man- agement system.

HSE即健康(Health)、安全(Safety)、环境(Environment)的英文缩写。结合中国石油工程建设(集团)公司建立、实施HSE管理体系的实践,总结提出了工程建设企业在建立、实施HSE管理体系过程中应予以注意的五个要点。

In accordance with ISO 9001:2000, the customer′s satisfaction on project is measured during implementation of the products pipeline project in Pakistan, which is an international project carried out by China Petroleum Engineering Construction Corporation. In this paper the different measuring methods of customer′s satisfaction during different construction stages corresponding to the shifting sequence of key tasks are described in relative detail. In preparation stage, method of investigation table is used;...

In accordance with ISO 9001:2000, the customer′s satisfaction on project is measured during implementation of the products pipeline project in Pakistan, which is an international project carried out by China Petroleum Engineering Construction Corporation. In this paper the different measuring methods of customer′s satisfaction during different construction stages corresponding to the shifting sequence of key tasks are described in relative detail. In preparation stage, method of investigation table is used; in construction preparing stage, method of weekly information gathering meeting is adopted; and in construction stage, method of field construction information gathering is applied. The above mentioned methods can offer the references to customer′s satisfaction measurement for similar projects too.

在中国石油工程建设(集团)公司承揽的国际工程项目———巴基斯坦成品油管道项目的实施过程中,执行了ISO9001∶2000规定:测量工程项目的顾客满意度。文章就该项目施工中工作重点的变化顺序,较详细地介绍了在不同阶段对顾客满意度的测量方法,即在项目准备阶段,采取调查表法;在项目施工准备阶段,采用周会信息汇总法;在项目施工阶段,采取现场施工信息汇总法。该方法可为类似工程项目顾客满意度的测量工作提供借鉴。

For a products pipeline project in Pakistan contracted by China Petroleum Engineering Construction Corporation, a progressive internal checking mode is adopted in the construction work, and it enhances the quality control during the construction so as to guarantee the successful commission. The project has an excellent engineering quality of over 97% primary qualification rate and without any leakage happened at more than 50 thousand welding seams. The project was constructed in accordance with safety and environmental...

For a products pipeline project in Pakistan contracted by China Petroleum Engineering Construction Corporation, a progressive internal checking mode is adopted in the construction work, and it enhances the quality control during the construction so as to guarantee the successful commission. The project has an excellent engineering quality of over 97% primary qualification rate and without any leakage happened at more than 50 thousand welding seams. The project was constructed in accordance with safety and environmental protection demands, and achieved favorable economic and social benefits. This paper introduces the mode and features of progressive internal examination and verification of the products pipeline project in Pakistan.

中国石油工程建设(集团)公司承建的巴基斯坦成品油管道项目,在施工过程中采用了滚动式质量审核方式,加大了施工过程中的质量控制,从而保证了该项目投产一次成功,工程质量优良,5万多道焊口无一处泄漏,焊接一次合格率在97%以上,施工安全环保,创造了良好的经济效益和社会效益。文章介绍了巴基斯坦成品油管道项目滚动式质量审核的方式和特点,可为同类工程借鉴。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关建设集团的内容
在知识搜索中查有关建设集团的内容
在数字搜索中查有关建设集团的内容
在概念知识元中查有关建设集团的内容
在学术趋势中查有关建设集团的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社