助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   建设集团 在 建筑科学与工程 分类中 的翻译结果: 查询用时:0.37秒
图标索引 在分类学科中查询
所有学科
建筑科学与工程
工业经济
企业经济
石油天然气工业
更多类别查询

图标索引 历史查询
 

建设集团
相关语句
没有找到相关双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  construction group
In 24 rats all intestinal sutures were removed 30 min after anastomotic construction (group 1), while in the remaining animals (group 2) the sutures were left in place.
      
After adjusting the age distribution of the construction group to match the distribution of agriculture group, the mean HUI3 score of the former significantly decreased.
      
Filed by Dillon Construction Group for John >amp; Jennifer Rulli.
      
Sheared DNA derived from this new prep was shipped to GSC and tested in their shotgun library construction group.
      
The consortium of local construction group Doprastav and Austrian firm Vatech Voest succeeded in clinching the contract.
      


The foundation of Guohua Hotel in Xining by Ningxia Chengcheng Const ruction (Group) Corporation, Ltd, was based on the round gravel layer. The round gravel layer has a higher drop and there is enough underground water for suppor ting pressure. While the project was going on, the foundation in lower area was dealt with by means of shaking and crushing in order to balance the pressure of the gravel layer. At the same time, the level of the underground water was lower ed by digging large-mouth-shaped well....

The foundation of Guohua Hotel in Xining by Ningxia Chengcheng Const ruction (Group) Corporation, Ltd, was based on the round gravel layer. The round gravel layer has a higher drop and there is enough underground water for suppor ting pressure. While the project was going on, the foundation in lower area was dealt with by means of shaking and crushing in order to balance the pressure of the gravel layer. At the same time, the level of the underground water was lower ed by digging large-mouth-shaped well. Thus the project could be performed bet ter below the underground water level. Both of the two methods had a good and sa tisfying effect.

宁夏成城建设(集团)有限公司,承建的西宁市国华宾馆基础坐落在圆砾石层地基上,而此圆砾石层顶的埋深高差较大,且含有较为丰富的承压地下水.为此,施工时对低洼区用人工级配沙石换土法作了振碾地基处理,以取得该圆砾石层的承载力基本一致.同时,为了创造一个在地下水位下施工的良好作业环境,又用大口井法来降低地下水位.这两项施工方法,都取得较满意的效果.

By the second exploiting of the Delphi module,the authors studied attributes,means and events of gate's modules,realized communication in industrial computer board-card,simulated the burden process of concrete batching plant for Qingdao Xinxing Ltd.Co.,and designed the hardware circuit of linking up simulation system and control system for the test.

应用Delphi组件开发技术进行二次开发,研究门组件的属性、方法和事件,实现了工控机输入输出板卡的通讯,仿真模拟了青岛新型机械建设集团有限公司混凝土搅拌站配料的整个过程,设计了仿真系统与控制系统连接的硬件电路,并通过控制系统与仿真系统的连接达到了对其调试的目的.

The enterprise reform has always been the sensitive topic catching the attention of every deputy and member. What difficulties are there with regard to enterprise reform? How should they be reformed? How can the benefit be maximized? As an enterprise with a long history, Hebei Construction Group constantly expands its management scale and has created achievements one by one under the leadership of Li Baoyuan, Board Chairman of the Group.

企业改革历来是每个代表、委员关注的敏感话题。企业改革到底有什么困难,应该怎样改,如何实现效益最大化?河北建设集团作为一个老牌企业,在董事长李宝元的带领下,不断扩大经营规模,创造了一个又一个佳绩。李宝元代表说,国企改革重在抓机遇。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关建设集团的内容
在知识搜索中查有关建设集团的内容
在数字搜索中查有关建设集团的内容
在概念知识元中查有关建设集团的内容
在学术趋势中查有关建设集团的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社