助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   建设集团 在 工业经济 分类中 的翻译结果: 查询用时:0.012秒
图标索引 在分类学科中查询
所有学科
工业经济
企业经济
建筑科学与工程
石油天然气工业
更多类别查询

图标索引 历史查询
 

建设集团
相关语句
没有找到相关双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  construction group
In 24 rats all intestinal sutures were removed 30 min after anastomotic construction (group 1), while in the remaining animals (group 2) the sutures were left in place.
      
After adjusting the age distribution of the construction group to match the distribution of agriculture group, the mean HUI3 score of the former significantly decreased.
      
Filed by Dillon Construction Group for John >amp; Jennifer Rulli.
      
Sheared DNA derived from this new prep was shipped to GSC and tested in their shotgun library construction group.
      
The consortium of local construction group Doprastav and Austrian firm Vatech Voest succeeded in clinching the contract.
      


By combination the foundation of China Petroleum Engineering (Group) Corp. and practice of HSE (Health, Safety and Environment) management system, five points are summarized and present- ed in this paper for construction enterprises in the process of establishing and implementing HSE man- agement system.

HSE即健康(Health)、安全(Safety)、环境(Environment)的英文缩写。结合中国石油工程建设(集团)公司建立、实施HSE管理体系的实践,总结提出了工程建设企业在建立、实施HSE管理体系过程中应予以注意的五个要点。

Quality management of the construction products is a systematic and all-around managing process. This paper was developed on the basis of the actuality of the Qingdao Construction Group Corporation. The factors influencing the quality risk during the management process of the Group Corporation, such as lack of management awareness, poor maintain service, dependence on subcontractors, laggard equipment and techniques, frequent quality accident, were analysed in detail. Then, the measures to prevent and control...

Quality management of the construction products is a systematic and all-around managing process. This paper was developed on the basis of the actuality of the Qingdao Construction Group Corporation. The factors influencing the quality risk during the management process of the Group Corporation, such as lack of management awareness, poor maintain service, dependence on subcontractors, laggard equipment and techniques, frequent quality accident, were analysed in detail. Then, the measures to prevent and control project quality risk were advanced. Establishing specific quality goals, strengthening workers' technique and awareness, emphasizing process control, perfecting quality management system, insisting on afterA-completion service, implementing reputed strategy were bring forwarded one by one. Finally, analysis and prevention of the quality management risk on an overall basis to strengthen risk - avoiding capability of the construction corporation was emphasized.

建筑工程质量管理过程是一个全方位、全过程、多角度的全面质量管理过程。本文结合青岛建设集团公司现状,详细分析了集团公司项目管理过程中质量风险的影响因素,如质量管理意识不强、工程竣工回访保修服务差、过分依赖分包队伍、生产设施陈旧、工艺落后而且工程质量事故频繁发生。然后提出了应针对项目质量风险因素采取相应的控制与防范措施,如明确质量目标、以人为本和加强岗位技能训练、加强过程检验、建立健全质量管理制度、加强竣工服务、实施名牌战略。最后指出要从多角度、全方位分析、预测项目质量管理风险因素,采取有效的控制与防范措施,增强施工企业规避质量风险的能力。

In accordance with ISO 9001:2000, the customer′s satisfaction on project is measured during implementation of the products pipeline project in Pakistan, which is an international project carried out by China Petroleum Engineering Construction Corporation. In this paper the different measuring methods of customer′s satisfaction during different construction stages corresponding to the shifting sequence of key tasks are described in relative detail. In preparation stage, method of investigation table is used;...

In accordance with ISO 9001:2000, the customer′s satisfaction on project is measured during implementation of the products pipeline project in Pakistan, which is an international project carried out by China Petroleum Engineering Construction Corporation. In this paper the different measuring methods of customer′s satisfaction during different construction stages corresponding to the shifting sequence of key tasks are described in relative detail. In preparation stage, method of investigation table is used; in construction preparing stage, method of weekly information gathering meeting is adopted; and in construction stage, method of field construction information gathering is applied. The above mentioned methods can offer the references to customer′s satisfaction measurement for similar projects too.

在中国石油工程建设(集团)公司承揽的国际工程项目———巴基斯坦成品油管道项目的实施过程中,执行了ISO9001∶2000规定:测量工程项目的顾客满意度。文章就该项目施工中工作重点的变化顺序,较详细地介绍了在不同阶段对顾客满意度的测量方法,即在项目准备阶段,采取调查表法;在项目施工准备阶段,采用周会信息汇总法;在项目施工阶段,采取现场施工信息汇总法。该方法可为类似工程项目顾客满意度的测量工作提供借鉴。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关建设集团的内容
在知识搜索中查有关建设集团的内容
在数字搜索中查有关建设集团的内容
在概念知识元中查有关建设集团的内容
在学术趋势中查有关建设集团的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社