助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   一期整治工程 的翻译结果: 查询用时:0.012秒
图标索引 在分类学科中查询
所有学科
公路与水路运输
更多类别查询

图标索引 历史查询
 

一期整治工程
相关语句
  phase i regulation project
     Silt Source at the Outer channed of Shantou Port and A Summary of Phase I Regulation Project
     汕头港外航道泥沙来源及一期整治工程总结
短句来源
     It briefly introduces the source of silt at the outer waterway of Shantou Port and construction situation and regulation effect of Phase I regulation project.
     简要介绍汕头港外航道泥沙来源及一期整治工程的建设情况和整治效果。
短句来源
  “一期整治工程”译为未确定词的双语例句
     Analysis and control of local siltation during executing the 1st-phase regulation project of the Yangtze Estuary;
     长江口一期整治工程实施过程中局部地形冲淤的分析与控制;
短句来源
     Taking a case of Y4 main way bridge recommendation plan (primary design of treatment project I of Shanghai Dalu Line Channel), the design idea of self-anchored suspension bridge has been presented in details.
     以上海市大芦线航道一期整治工程初步设计中Y4主干路桥推荐方案为例,具体阐述了自锚式悬索桥设计的思路。
短句来源
  相似匹配句对
     URBAN DESIGN FOR WANGFUJING BUSINESS STREET RENOVATION Ⅰ & Ⅱ PHASE PROJECTS
     王府井商业街整治城市设计、二工程
短句来源
     Regulation Effect Analysis of Yangtze Estuary Deepwater Channel Regulation Phase I Project
     长江口深水航道治理工程整治效果分析
短句来源
     Analysis on the First Stage of Suzhou Creek Rehabilitation Project Based on Water Quality Moldel
     苏州河环境综合整治工程水质模型分析
短句来源
     THE FIRST—PHASE ENGINEERING DESIGN OF WIND—SAND CONTROL IN SHIQUANHE TOWN
     狮泉河镇风沙整治工程设计
短句来源
     The regulation effect of Yangtze Estuary Deepwater Channel Regulation Phase I Project is mainly expounded.
     主要论述长江口深水航道治理工程整治效果 ;
短句来源
查询“一期整治工程”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The river bed of the upper part of Sanxin shoal on the Songhuajing river are composed of a thin sand layer and gravel, and exposed bed rocks on its middle and downstream parts of the shoal. Based on the data of water level, velocity field and river bed deformation under the first stage regulating works, the sediment mathematical model of waterway was appiled to calibrate the roughness,and the bedload transportation etc. Then,the water flow structure and riverbed deformation were numerically simulated under the...

The river bed of the upper part of Sanxin shoal on the Songhuajing river are composed of a thin sand layer and gravel, and exposed bed rocks on its middle and downstream parts of the shoal. Based on the data of water level, velocity field and river bed deformation under the first stage regulating works, the sediment mathematical model of waterway was appiled to calibrate the roughness,and the bedload transportation etc. Then,the water flow structure and riverbed deformation were numerically simulated under the second stage regulating works. The calculated results are in close agreement with the experimental data from the physical model.

松花江三姓浅滩上段河床由沙质组成,但沙质覆盖层很薄,中下段底质坚硬由石质组成并有基岩裸露。本文以三姓浅滩航道整治工程为例,应用航道工程泥沙数学模型[1~2],由一期整治工程作用下的水面线、流场及河床变形资料率定模型中的糙率、推移质输移方程等,然后进行二期整治工程作用下的水流及河床变形模拟,并与实体模型试验资料进行了比较。

The paper mainly introduces the research mechanism and decision making procedure for prefeasibility study and monitoring of local siltation in the deepwater channel regulation project of the Yangtze Estuary;Analysis and control of local siltation during executing the 1st-phase regulation project of the Yangtze Estuary;Decision making process for dynamic pre-control of regulation effect,based on which,the river bed scouring-siltation-adjustment in executing...

The paper mainly introduces the research mechanism and decision making procedure for prefeasibility study and monitoring of local siltation in the deepwater channel regulation project of the Yangtze Estuary;Analysis and control of local siltation during executing the 1st-phase regulation project of the Yangtze Estuary;Decision making process for dynamic pre-control of regulation effect,based on which,the river bed scouring-siltation-adjustment in executing regulation engineering is most favorable for increasing the water depth of navigation channel.

主要论述长江口深水航道治理工程从事预研和跟踪监测局部冲淤的研究机制及决策程序; 长江口一期整治工程实施过程中局部地形冲淤的分析与控制; 动态预控治理效果的决策过程, 使实施整治工程时的河床冲淤调整向最有利航槽水深增加的方向发展。

It briefly introduces the source of silt at the outer waterway of Shantou Port and construction situation and regulation effect of Phase I regulation project.

简要介绍汕头港外航道泥沙来源及一期整治工程的建设情况和整治效果。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关一期整治工程的内容
在知识搜索中查有关一期整治工程的内容
在数字搜索中查有关一期整治工程的内容
在概念知识元中查有关一期整治工程的内容
在学术趋势中查有关一期整治工程的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社