助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   标准作业时间 的翻译结果: 查询用时:0.016秒
图标索引 在分类学科中查询
所有学科
机械工业
数学
计算机软件及计算机应用
更多类别查询

图标索引 历史查询
 

标准作业时间
相关语句
  standard work time
     Assembly Line Planning Based on Standard Work Time and Simulation
     基于标准作业时间和仿真的装配线规划
短句来源
     Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed.
     在分析装配线规划内容的基础之上,提出了基于标准作业时间及系统仿真的装配线规划方法并开发了相应的原型系统。
短句来源
  standard operation time
     Operation time measurement is one of the important ways to give standard operation time.
     作业时间测定是制定标准作业时间的重要途径之一。
短句来源
  “标准作业时间”译为未确定词的双语例句
     Take the assembly of micro electric pump in a corporation in Zhejiang as example, the standardized time is presented based on the analyses of its structure and assembly process.
     并以某企业的微型电泵装配为例,在分析其结构和装配工艺流程的基础上,得出其装配的标准作业时间
     This standardized time can provide a foundation for partitioning work stations and balancing assembly line, and have significant meaning for improving productivity, reducing cost and enhancing the corporation's capability of programming the manufacture system themselves.
     该标准作业时间是装配流水线工位划分和装配线体的平衡的基础,对提高生产率、降低成本和提高企业自主规划生产系统的能力具有重要意义。
  相似匹配句对
     the analysis of working time and the ESIAO ways.
     作业时间分析法;
短句来源
     The Standard Time Decoder
     标准时间译码器
短句来源
     the working time analysis;
     作业时间分析;
短句来源
     Assembly Line Planning Based on Standard Work Time and Simulation
     基于标准作业时间和仿真的装配线规划
短句来源
     Operation time measurement is one of the important ways to give standard operation time.
     作业时间测定是制定标准作业时间的重要途径之一。
短句来源
查询“标准作业时间”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed. The rational and balanced assembly workplaces can be constructed through establishing assembly operational tree and defining operational constraints, meanwhile forming an assembly worksheet. With this worksheet as input, assembly line simulation model can be established to provide an environment for optimization of...

Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed. The rational and balanced assembly workplaces can be constructed through establishing assembly operational tree and defining operational constraints, meanwhile forming an assembly worksheet. With this worksheet as input, assembly line simulation model can be established to provide an environment for optimization of material han-dling parameter in layout planning. The above research provides an environment for enterprises to set up assem-bly line with rational work time and improve the capability of manufacturing system planning.

在分析装配线规划内容的基础之上,提出了基于标准作业时间及系统仿真的装配线规划方法并开发了相应的原型系统。通过建立装配操作树、定义装配操作约束,规划合理平衡的装配工位,同时生成装配作业表。以此作业表为输入,建立装配线的仿真模型,为装配线系统布置中物流参数等优化提供环境。通过这些工作,为企业制定工时定额合理的装配线、提高自主规划生产系统的能力提供途径。

Operation time measurement is one of the important ways to give standard operation time.This paper puts forward a method of studying the reliability of the measured operation times,aiming to provide a basis for specifying the standard operation time.

作业时间测定是制定标准作业时间的重要途径之一。针对作业时间测定得到的数据的可信度问题,提出了一种分析方法,从而保证了通过作业时间测定得到的数据的可靠性。

>=The method of determining the standardized assembly time of micro electric pump is put forward by means of industrial engineering (IE) technology, work study method and mathematical statistics theory. Take the assembly of micro electric pump in a corporation in Zhejiang as example, the standardized time is presented based on the analyses of its structure and assembly process. This standardized time can provide a foundation for partitioning work stations and balancing assembly line, and have significant meaning...

>=The method of determining the standardized assembly time of micro electric pump is put forward by means of industrial engineering (IE) technology, work study method and mathematical statistics theory. Take the assembly of micro electric pump in a corporation in Zhejiang as example, the standardized time is presented based on the analyses of its structure and assembly process. This standardized time can provide a foundation for partitioning work stations and balancing assembly line, and have significant meaning for improving productivity, reducing cost and enhancing the corporation's capability of programming the manufacture system themselves. This result can also be instructive for the corporation which have the similar capacity.

利用现代IE技术、工作研究的方法和数理统计的理论,提出了微型电泵的标准装配作业时间确定的方法。并以某企业的微型电泵装配为例,在分析其结构和装配工艺流程的基础上,得出其装配的标准作业时间。该标准作业时间是装配流水线工位划分和装配线体的平衡的基础,对提高生产率、降低成本和提高企业自主规划生产系统的能力具有重要意义。该研究也可作为微型电泵标准装配作业时间定制的一个实际可行的参考。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关标准作业时间的内容
在知识搜索中查有关标准作业时间的内容
在数字搜索中查有关标准作业时间的内容
在概念知识元中查有关标准作业时间的内容
在学术趋势中查有关标准作业时间的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社