   高压隧洞 的翻译结果: 查询用时:0.03秒
图标索引 在分类学科中查询
所有学科
水利水电工程
电力工业
更多类别查询

图标索引 历史查询
 

高压隧洞
相关语句
  high pressure tunnel
     DISCUSSION OF FRACTURE MECHANICS AppLICATION IN RESTRICTED FISSURE DESIGN OF HIGH pRESSURE TUNNEL OF HYDRAULIC ENGINEERINGS
     断裂力学在水工高压隧洞限裂设计中的应用探讨
短句来源
     Based on the contact problem model of multilayer thick cylinder of elastic theory,this paper established the stress computation method of lining fracture model on high pressure tunnel of hydraulic engineering and put forword the relevent computation formula of stress exact solution.
     采用弹性理论多层厚壁圆筒接触问题模型 ,建立了水工高压隧洞衬砌开裂模型的应力计算方法 ,给出了相应的应力精确解计算公式 ;
短句来源
     Discussion on some problems in design of high pressure tunnel for hydro projects
     水工高压隧洞结构设计中若干问题的讨论
短句来源
     Research on the reinforcement in the high pressure tunnel lining
     高压隧洞衬砌设计配筋研究
短句来源
     In the long term operation of the Shimen arch dam,two major problems occurred:a)the abnormal seepage through the right abutment,which was caused by impermeability failure of the high pressure tunnel reinforced concrete lining and.
     论述了石门拱坝 2 8年长期运行中实际发生的两个重大问题 ,即第一右坝肩渗漏异常反映问题 ,由高压隧洞钢筋混凝土衬砌阻水失效引起 ;
短句来源
更多       
  high-pressure tunnel
     On the basis of using the successful experience of the first-stage project for reference and the actual measurement data, the second-stage project of the Guangzhou Pumped Storage Plant adopts the principles and methods of pervious lining tunnel to conduct the structural design of high-pressure tunnel for the second-stage project.
     广州抽水蓄能电站二期工程 ,在充分借鉴一期工程的成功经验和实测资料的基础上 ,采用透水衬砌隧洞的原理和方法 ,对二期工程高压隧洞进行结构设计。
短句来源
     Design of high-pressure tunnel of the Guangzhou Pumped Storage Plant (second stage)
     广蓄二期工程高压隧洞设计
短句来源
  high pressure tunnels
     STRESS ANALYSIS OF SURROUNDING ROCKS OF HYDRAULIC HIGH PRESSURE TUNNELS UNDER STEEP ROCK SLOPE
     倾斜坡体中水工高压隧洞围岩应力场特性分析
短句来源
     Behavior of Hydraulic High Pressure Tunnels
     水工高压隧洞性状分析
短句来源
     This paper presents the arrangement of drainage system for high pressure tunnels, high pressure bifurcations and high pressure diversion penstocks of stage I Project of Guangzhou Pumped Storage Station and the results after filling test.
     本文介绍广州抽水蓄能电站一期工程高压隧洞、高压岔管及高压引水钢支管的排水系统布置及其充水试验后的效果。
短句来源
  “高压隧洞”译为未确定词的双语例句
     Design of Tunnel with High Pressure Water based on Coupling of Seepage Field and Stress Field
     基于渗流场与应力场耦合的高压隧洞设计
短句来源
     The inner water pressure is applied to the lining block and surrounding rock as physical force,and the coupled analysis model of seepage field and stress field is formed.
     将内水压力以体力的形式作用于隧洞衬砌和围岩,建立了高压隧洞内水外渗渗流场与应力场的耦合数值分析的计算模型。
短句来源
     It is applied to the comparing research for the tunnel with high pressure water in Huizhou Pumped Storage Power Station,and a series of conclusions is drawn.
     将其应用于惠州抽水蓄能电站高压隧洞不同方案的对比计算研究,得出了一系列有意义的结论。
短句来源
     Design and stress Analysis of Tunnels under High Water Pressure
     高压隧洞的设计及应力分析
短句来源
     The calculation method can preferably reflect the actual stress and strain situation of hydraulic tunnel with high pressure with seepage from inner tunnel to outer tunnel.
     该计算方法较好的反映了水工高压隧洞的内水外渗后实际受力变形情况。
短句来源
更多       
查询“高压隧洞”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  high pressure tunnel
Geotechnical considerations in an unlined high pressure tunnel at Lower Kihansi in Tanzania
      
  high-pressure tunnel
The Lower Kihansi unlined high-pressure tunnel is the first of its kind to be constructed in Tanzania.
      
Calculation of the steel shell in a combined lining of a high-pressure tunnel
      
Investigation of the stressed state in high-pressure tunnel linings
      
The other two options were a deep high-pressure tunnel and the increasing of the existing tunnel section.
      


This paper presents the arrangement of drainage system for high pressure tunnels, high pressure bifurcations and high pressure diversion penstocks of stage I Project of Guangzhou Pumped Storage Station and the results after filling test.

本文介绍广州抽水蓄能电站一期工程高压隧洞、高压岔管及高压引水钢支管的排水系统布置及其充水试验后的效果。

Based on the design crieria and structural analysis method for large R.C. lined funnels under high water pressure, it is proposed that the fumel should be designed according to the design condition of unlined tunnel, and the internal pressure undertaken mainly by the surrounding rock. The function of R.C. lining is mainly to smooth the tunned and to prevent the surrounding rock from collapse. The design of the tunnel often depends on external water pressure. Increasing the lining thickness can enhance obviously...

Based on the design crieria and structural analysis method for large R.C. lined funnels under high water pressure, it is proposed that the fumel should be designed according to the design condition of unlined tunnel, and the internal pressure undertaken mainly by the surrounding rock. The function of R.C. lining is mainly to smooth the tunned and to prevent the surrounding rock from collapse. The design of the tunnel often depends on external water pressure. Increasing the lining thickness can enhance obviously its ability to bear the external pressure.

对高水头大直径钢筋混凝土衬砌压力隧洞的设计准则和结构分析方法进行讨论分析,提出高压隧洞应按不衬砌隧洞进行设计,内压主要由围岩承担,衬砌的主要作用是平整洞壁,防止围岩坍落;外压有可能是衬砌设计的控制情况,增加抗外压圈的厚度能显著提高衬砌抗外压的能力。

Inthispaper ,accordingtothepressuretunnelmonitoringresultsoftheGuangzhoupumpedstoragepowerplant (firstcon structionstage) ,twodifferentvalueanalysismethodsofboundaryelementandlimitedelementwereadoptedtoanalyzethetriaxial nonhomogeneousrockseepagefieldandtoworkouttheseepageforce .Then ,fortheconvenienceofcracklimitationcalculation ,the boundaryelementandlimitedelementmethodswereusedinthesolidmechanicsanalysistocalculatethereinforcedstressandtowork outthewidthofconcretecrack .ThismethodhasbeenusedinthesecondconstructionstageoftheGuangzhoupumpedstoragepower...

Inthispaper ,accordingtothepressuretunnelmonitoringresultsoftheGuangzhoupumpedstoragepowerplant (firstcon structionstage) ,twodifferentvalueanalysismethodsofboundaryelementandlimitedelementwereadoptedtoanalyzethetriaxial nonhomogeneousrockseepagefieldandtoworkouttheseepageforce .Then ,fortheconvenienceofcracklimitationcalculation ,the boundaryelementandlimitedelementmethodswereusedinthesolidmechanicsanalysistocalculatethereinforcedstressandtowork outthewidthofconcretecrack .ThismethodhasbeenusedinthesecondconstructionstageoftheGuangzhoupumpedstoragepower plantforthehighpressuretunneldesignandbroughtaboutadecreasedtunnelreinforcementconsumptionofover 10 0 0tonswiththe savedinvestmentofR .M .B 4 0 0 0 0 0 0 .

根据广州抽水蓄能电站一期工程的压力隧洞监测成果 ,采用边界元法与有限元法这两种不同的数值分析方法分析三维非均质各向异性的岩体渗流场 ,计算出渗透体积力。然后再分别用边界元及有限元法进行固体力学分析 ,计算出钢筋应力 ,从而推求出混凝土裂缝开展的宽度 ,以便进行限裂计算。此法已应用于广州抽水蓄能电站二期工程的高压隧洞设计 ,取得了减少隧洞配筋 10 0 0多t、节约投资 4 0 0万元人民币的经济效益。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关高压隧洞的内容
在知识搜索中查有关高压隧洞的内容
在数字搜索中查有关高压隧洞的内容
在概念知识元中查有关高压隧洞的内容
在学术趋势中查有关高压隧洞的内容
 
 