助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   地层区间 的翻译结果: 查询用时:0.01秒
图标索引 在分类学科中查询
所有学科
石油天然气工业
更多类别查询

图标索引 历史查询
 

地层区间
相关语句
  “地层区间”译为未确定词的双语例句
     Nanjing Subway Soft Flow to Mould Layer Interval Tunnel Construction Technical Research
     南京地铁软流塑地层区间隧道施工技术研究
短句来源
     An introduction is given to construction method and technical measures used for Shenzhen Metro. Technical difficulties such as weak ground and water abundance were overcome by means of advance water discharge and dewatering.
     介绍深圳地铁科学馆—华强北区间隧道施工方法及采取的措施 ,成功地解决了浅埋暗挖软弱地层区间隧道施工技术难题 ,所采用的超前引排地下水以及隧道内降水措施 ,克服了富水软弱地层施工技术难题
短句来源
  相似匹配句对
     STRATUM
     地层
短句来源
     interval models, which use the interval variables to represent uncertainties and get interval analysis to solve them.
     区间模型。
短句来源
     Fuzzy Intervals
     Fuzzy区间
短句来源
     Stratigraphic studies have confirmed that there exist transitional relationships between various regions (or areas).
     地层研究证实各区间都存在过渡状态。
短句来源
     Analysis on stratum conditions of a certain subway section in Beijing and its construction measures
     北京某地铁区间地层状况分析及施工措施
短句来源
查询“地层区间”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  formation interval
On the jet formation interval the region of flow with strong discontinuities (shocks) is replaced by a surface of discontinuity.
      
Therefore, for pure liquids the relationship between the mass of drops formed under dynamic conditions,Gt, and their formation interval,t, was determined.
      
Attributes computed over the San Andres Formation interval indicated the northsouth direction as preferred for the CO2 flow.
      


An introduction is given to construction method and technical measures used for Shenzhen Metro. Technical difficulties such as weak ground and water abundance were overcome by means of advance water discharge and dewatering.

介绍深圳地铁科学馆—华强北区间隧道施工方法及采取的措施 ,成功地解决了浅埋暗挖软弱地层区间隧道施工技术难题 ,所采用的超前引排地下水以及隧道内降水措施 ,克服了富水软弱地层施工技术难题

By numerical calculation,the paper discusses the ground surface settlement and the surrounding rock mass displacement of the double-tube subway tunnel in soft-flow muddy stratum of the building region between the Zhu and Gu Districts in Nanjing, in the process of underground construction. Finally, the results of calculation and the site measurement are compared and analyzed.

对南京地铁珠~鼓区间建筑楼群下软~流塑地层区间隧道施工动态进行了动态模拟计算,论述了双 孔浅埋隧道施工地表、地层沉降规律,并与实测结果进行了对比分析。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关地层区间的内容
在知识搜索中查有关地层区间的内容
在数字搜索中查有关地层区间的内容
在概念知识元中查有关地层区间的内容
在学术趋势中查有关地层区间的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社