助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   项目编码 的翻译结果: 查询用时:0.033秒
图标索引 在分类学科中查询
所有学科
高等教育
建筑科学与工程
更多类别查询

图标索引 历史查询
 

项目编码
相关语句
  item coding
     Concrete measure and plan were presented for setup structure and item coding of construction quota;
     本文对企业定额的设置结构、项目编码给出了具体的措施和方案;
短句来源
     The non- sign installation branch part of project is measured the detailed account and is reckond the regulation and draws up in accordance unitary in 《 Code of valuation with bill quantity of construction works 》 annex item coding , item name and measure (unit) and project gauge
     非标设备分部分项工程量清单按照《建设工程工程量清单计价规范》附录中统一的项目编码、项目名称、计量单位和工程量计算规则进行编制
短句来源
  “项目编码”译为未确定词的双语例句
     Through analyzing the connotation of project management and comparing softwares at home and abroad, this paper expounds the necessity of developing modern integrated management information system of projects in our country, and reveals an approach to the design and development of PIMIS.
     通过对项目管理信息系统涵义的分析及国内外工程管理软件的比较,阐述了开发具有新内涵的我国工程项目集成管理信息系统(PIMIS)的必要性,并对PIMIS设计开发进行了探讨,其设计思路为:以项目编码系统为纽带,对项目的计划、进度与费用、物质材料、质量控制、合同管理高度集成,数据具有唯一性、完整性和共享性。
短句来源
     How to Set up the Code of University Department and the Funded Project's Number
     如何设置高校部门代码和经费项目编码
短句来源
     Main aspects of the work I did within the period are listed as follows:1. The implementation of the PTG GUI CSCI: all development processes, including functionality allocation, feasibility analysis, software design and deployment coding, unit test, integration test and documenting, are finished based on the related standards and software development flow of Thales ATM.
     这期间,本人主要做了以下几个方面的工作:l)整个PTG GUI部件的开发实现:从PTG GUI的功能界定,可行性分析,软件需求,软件设计、规划与布局,整个项目编码,单元测试,集成测试以及所有文档编写工作,全部按Thales ATM公司相关标准以及软件开发流程完成。
短句来源
     The development of Capital City Geological Information Management and Service System is a national land resources survey program of which is demanded by Chinese Bureau. The fifth subtopic of the “Beijing Municipal Multi-parameter Geological Investigate” program (Program Code: 1210000012102), it is based on GIS research, use the technology of 3D Visualization of Geologic Volume, By using COMGIS as a controller in the application program developed by the user, a seamless integration of application program and geographic information system is achieved.
     首都城市地质信息管理与服务系统的开发是中国地质调查局下达的一项国土资源综合调查项目――“北京市多参数立体地质调查”项目(项目编码:1210000012102)的第五子课题,结合数字北京的需要,结合GIS领域的应用研究现状,采用三维地质体可视化技术,把地理信息系统组件作为控件在用户开发的应用程序中使用,从而实现了应用程序与地理信息系统之间的无缝集成;
短句来源
     Pricing by detailed work list must be adopted in the bidding of stateowned large and middle scale construction projects,and the item names,measuring units,computation rules and item codes must conform to national standard to promote the development of the construction market.
     国有大中型建设项目在招标投标中必须实行工程量清单计价,同时工程量清单中的项目名称、计量单位、计算规则和项目编码必须按照国家标准《建设工程工程量清单计价规范》的要求实行四统一,以此促进建筑市场向前发展。
短句来源
更多       
  相似匹配句对
     Project Database
     项目
短句来源
     PROJECT
     项目
短句来源
     determine project organization decompose structure and its number;
     确定项目组织分解结构和编码
短句来源
     Project structure breakdown and its coding are the fundamental work of project management.
     工程项目结构分解及其编码项目管理的基础工作 .
短句来源
     texture coding;
     纹理编码 ;
短句来源
查询“项目编码”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  project number
The model is run in AMIP2 (Atmospheric Model Intercomparison Project number 2) mode at four resolutions ranging from N48 (2.5° × 3.75°) to N144 (0.833° × 1.25°).
      
An experimental study of college instruction using broadcast television: Project number one
      
Besides, it also asks the project number of the project.
      
It was identified as a priority by the Population Screening Panel and funded as project number 93/32/03.
      
It was identified as a priority by the Primary and Community Care Panel and funded as project number 94/22/24.
      
更多          
  item code
As of December 2002, BC-MSP did not have any specific fee item code for vertebroplasty.
      
Each pair shall be ascendingly ordered as determined only by the value of field WIC Item Code within each pair.
      
In section 6 retrieval of individual constituent codes from the composite item code is considered.
      
The data that can be stored in the tag can range from a simple item code to a complete manufacturing or distribution audit trail.
      
  item coding
This structure also allows for updating content without a test plan change and facilitates reliable item coding.
      


This paper presents a series of microcomputer programs for network planning to the user,with the purpose of developing the microcomputer application and popularizing the usage of network planning in construction management. The functions of the programs are to calculate the time parameters,to find out the critical path of network planning,to optimize the planning and to output a bar-network diagram. The diagram is provided with the characteristics of both bar chart and network chart. In this article,we compile...

This paper presents a series of microcomputer programs for network planning to the user,with the purpose of developing the microcomputer application and popularizing the usage of network planning in construction management. The functions of the programs are to calculate the time parameters,to find out the critical path of network planning,to optimize the planning and to output a bar-network diagram. The diagram is provided with the characteristics of both bar chart and network chart. In this article,we compile two sets of programs,one for activity on branch network used extensively in China,and the other for activity on branch network used extensively in China,and the other for activity on node network. The microcomputer will perform the mathematical calculations only with the logical activity codes,i.e. the activity code and it's succeeding activities codes as imput data, and it is not necessary to draw the network graph prior to computation. If any adjustment to the planning is needed,the program will carry it out against time. Therefore, these programs are convenient and reliable in practical application.

本文提供了一系列网络计划技术的微机应用程序,目的是推广网络计划技术和微机在施工管理工作中的应用。程序的功能有:计算时间参数;找出计划的关键路线;进行各种优化计算;最后给出既具有横道图特点也具有网络图特点的横道网络图。文中编制了两套程序,一套可用于在我国广泛使用的双代号法,另一套用于单代号法。使用本程序时,只要输入工作项目的逻辑关系编码,即计划项目编码及其后续项目编码,不一定要先绘制网络图,就可以在微机上进行计算。如果计划需要调整,应用本程序可以迅速得出修改后的计划。因此,本程序在实际应用中方便而可靠。

Through analyzing the connotation of project management and comparing softwares at home and abroad, this paper expounds the necessity of developing modern integrated management information system of projects in our country, and reveals an approach to the design and development of PIMIS.

通过对项目管理信息系统涵义的分析及国内外工程管理软件的比较,阐述了开发具有新内涵的我国工程项目集成管理信息系统(PIMIS)的必要性,并对PIMIS设计开发进行了探讨,其设计思路为:以项目编码系统为纽带,对项目的计划、进度与费用、物质材料、质量控制、合同管理高度集成,数据具有唯一性、完整性和共享性。

P3 software is good for project management. It is well known in engineering and construction industries and regarded as the criterion of project management software. This paper introduces in detail the application of P3 software in the formulation of project schedule and project management as well, such as forming project groups, setting up project codes, establishing logical relations, determining key route, and examining process schedule. In the process of implementing process schedule, the whole procedure...

P3 software is good for project management. It is well known in engineering and construction industries and regarded as the criterion of project management software. This paper introduces in detail the application of P3 software in the formulation of project schedule and project management as well, such as forming project groups, setting up project codes, establishing logical relations, determining key route, and examining process schedule. In the process of implementing process schedule, the whole procedure monitoring, information collection, dynamic project management and process schedule adjustment and optimization timely are required.

PrimaveraProjectPlanner(P3)软件是一款优秀的项目管理软件,在国内外工程界享有盛誉,被视为项目管理软件的标准。运用P3软件编制工程项目进度计划,主要有以下几个方面的内容:建立工程组;设置项目编码;建立逻辑关系;确定关键线路;进度计划审核。在进度计划执行过程中,要全过程跟踪,收集信息,对工程实施动态管理,及时对进度计划进行调整和优化。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关项目编码的内容
在知识搜索中查有关项目编码的内容
在数字搜索中查有关项目编码的内容
在概念知识元中查有关项目编码的内容
在学术趋势中查有关项目编码的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社