Through application of Code for fire protection design of buildings GBJ16-87(version in 2001) and Code for fire protection design of tall buildings GB50045-95(version in 2001) in working,this paper summarizes and analyzes the design of fire compartment for buildings,and discusses the design of fire compartment for big space buildings and underground buildings and detail structure from view of practice.
This article introduces the basic requirement of roofing waterproofing grade,waterproofing substratum,construction technique and building material,discusses waterproofing design method of roofing project according to the feature of roofing detail structure,which to solve the problem of e=roofing waterproofing of housing project.
It discusses the application of SBS modified asphalt coiled material on the construction of underground water-proof in detail from the aspects of the characters of SBS water-proof coiled material,the construction condition,the points of construction technology and the requests of water-proof construction of detail structure,and should pay attention to the protection of finished product,to assure the integrity of water-proof layers.
The cause for deformation of roof construction layer and calculation methods for the amount of deformation were introduced, it was pointed out that key protection measures should be taken for the roof joint to prevent roof leakage economically and effectively, and detail construction and main points of construction technology for the key protection points were described
This paper,through analyzing the feature of structural damages due to earthquakes and the influence of specific structure on aseismatic performance,proposes the precautions and relevant construction measures to be applied in the detail construction design of bridges aiming at enhancing the aseismatic capability.
Based on the comparison between the Chinese and Japanese steel bridge development,this paper makes an introuduction about the detail construction and calculating way of steel bridge in Japan,which is by worty of our using for reference.
The article details waterproofing design for subway station structure constructed with different methods including open cut with slope, open cut with cladding and mine construction as well as waterproofing treatment for detail construction such as movement joint, construction joint and other joints.
Research results:By the practice of a new spatial structure system of latticed shell with bolt spherical joints and down-to-ground pipe truss,this paper provides some successful design experiences and special detail construction measures.
One of the limited factors in building design is climate conditions which will affect each aspects of building such as layout, exposed to the sun, the form of elevation, detailed structure, landscape, etc. What's more, climate condition is the crisis factor in building's energy-consumption control.
The article introduces the structure of the ZYP waterproofing coiled material roofing,FSG water\|proofing heated board,ZYP waterproofing coiled material and their constructional method,the detailed structure disposal of the base and roofing used in the secondary BOP project in the Qinshan nuclear power station.
On the basis of two examples of project, their characteristic, the range of the application, planning methods and detailed structure are briefly analysed in this paper.
This study revealed the formation and the detailed structure of water layers on HAP surfaces and suggested that the interfacial water played an important role in stabilizing the HAP particles in aqueous solutions.
The detailed structure of (CO2)i(H2O)10 clusters (0≤i≤11) is analyzed by the statistic geometry method based on the construction of the Voronoi polyhedra.
New data are reported on the detailed structure of shock-wave two-phase flow, and criteria are proposed to determine the conditions for the initiation of combustion, which is important for explaining the characteristic features of such flows.
Based on the two concepts, this paper discusses the detailed construction of CAD agents, LCED evaluation agents and knowledge maintenance agents and the system implementation.
The reclamation process included determining the final land use, collection of preconstruction environmental data, development of detailed construction plans, and implementation of the construction plans.