索赔计算
相关语句
  claim calculation
     Through the analysis of several cost claim cases during the construction of Xiaolangdi water project, the authurs studied the contract basis of cost claim calculation, cost composition and specific calculation methods, and expressed some views dealing with the problems concerned cost claim.
     本文通过对小浪底工程发生的几项具体费用索赔事件的分析,探讨了费 用索赔计算的合同基础、费用组成及具体的计算方法,并就费用索赔的处理提出 了一定见解。
短句来源
  “索赔计算”译为未确定词的双语例句
     Application of learning curve method in calculating the claim for extension of time
     熟练曲线法在工期索赔计算中的应用
短句来源
     Calculation Methods of Claim Under Many Events Disturbance
     多事件干扰下的索赔计算方法
短句来源
     Analysis of Common Problems in the Calculation of Claims for Highway Construction Cost
     公路工程费用索赔计算常见问题分析
短句来源
     Basic Principles and Methods for Calculations of Cost Claims in Construction
     浅谈施工中费用索赔计算的基本原则和方法
短句来源
     Calculating Method of Construction Delay Cost Claim in China
     我国工程延误费用索赔计算方法的研究
短句来源
更多       
  相似匹配句对
     We also give a new correction factor to simplify the calculation of the Unstatistic.
     的计算
短句来源
     Claims Settlement and Calculations in Engineering
     工程索赔的处理与计算
短句来源
     Simple Analysis of Construction Claim and Cost Calculation
     浅析施工索赔与费用计算
短句来源
     Computational atmospheric acoustics
     计算大气声学
短句来源
     Research on construction claim
     浅析施工索赔
短句来源
查询“索赔计算”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


This paper studies the claim projections when the engineering is delayed.The mathods about calculating claim costs and distributing management expenses are raised. An example of how to calculat claim costs is given in the paper.

研究了工程延期情况下费用索赔的形成条件,项目构成和处理;提出了费用索赔的计算方法和管理费的分摊方法,给出了计算实例.

Based on the stability of construction items and ratios in China, absorbing the method in international projects which is fit for Chinese practice,the paper simplifies complicated conditions and analyzes the relationship between delay time and cost items and offers a calculation method for delay cost claims, so the problems can be resolved quickly.

立足我国工程费用项目构成的稳定性和费率的规定性,适当借鉴国际工程中较成熟的经验,简化延误索赔的复杂情况,在费用项目时间相关分析的基础上,提出了有普遍意义的计算模型,以迅速解决延误费用索赔计算的问题.在具体应用时,对模型进行适当修正,从而合理解决工程实践问题.

During treatment of a delayed schedule,specific deliberation of calculation on claim for extension of time should be paid attention to the following tasks:because the critical path of a network might be changed from time to time and the appropriate utilization of float should be carefully considered in the actual schedule,therefore,the claim for extension of time can not be calculated only by the network,but the actual period where the cause of a delayed schedule is set should be considered,and should be calculated...

During treatment of a delayed schedule,specific deliberation of calculation on claim for extension of time should be paid attention to the following tasks:because the critical path of a network might be changed from time to time and the appropriate utilization of float should be carefully considered in the actual schedule,therefore,the claim for extension of time can not be calculated only by the network,but the actual period where the cause of a delayed schedule is set should be considered,and should be calculated on the basis of the actual schedule which is approved by the supervising Engineer.

在工期延误处理时,工期索赔计算应特别注意:由于网络的关键线路可能发生变化,且实际进度计划要考虑时差的合理利用,因此工期索赔不能仅按网络图计算,而要考虑工期延误原因的实际发生时间,按经监理工程师批准的实际进度计划计算。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关索赔计算的内容
在知识搜索中查有关索赔计算的内容
在数字搜索中查有关索赔计算的内容
在概念知识元中查有关索赔计算的内容
在学术趋势中查有关索赔计算的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社