助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   矿井崩塌 的翻译结果: 查询用时:0.098秒
图标索引 在分类学科中查询
所有学科
地质学
更多类别查询

图标索引 历史查询
 

矿井崩塌
相关语句
  mine collapse
     ANALYSIS OF THE RESPONSE OF WATER LEVEL IN WELL LU-15 TO THE PROCESS OF MINE COLLAPSE
     鲁15井水位对矿井崩塌过程的响应分析
短句来源
     Evident is the response of water level in the well Lu-15 to the process of mine collapse.
     鲁15井水位对矿井崩塌过程有明显的反映。
短句来源
  相似匹配句对
     ANALYSIS OF THE RESPONSE OF WATER LEVEL IN WELL LU-15 TO THE PROCESS OF MINE COLLAPSE
     鲁15井水位对矿井崩塌过程的响应分析
短句来源
     Evident is the response of water level in the well Lu-15 to the process of mine collapse.
     鲁15井水位对矿井崩塌过程有明显的反映。
短句来源
     Mine Ventilating Fans Work in Parallel
     矿井通风机的并联工作
短句来源
     TX New Technology for Mine Reconstruction and Rebuilding
     矿井改扩建技术
短句来源
     RESEARCH ON THE COLLAPSE AND FALLING STONE
     崩塌落石研究
查询“矿井崩塌”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  mine collapse
Two case histories of mine collapse at Bury St Edmunds, Suffolk and Grays, Essex are described.
      
Loss of support from mine collapse has created large vertical subsidence fractures along the naturally occurring joints within the brittle sandstone overburden.
      
The consideration and combination of several seismological principles made possible the construction of a model of the mine collapse.
      
Moment Tensor Inversion of Regional Phases: Application to a Mine Collapse
      
In this paper we present an application to a seismic event induced by a mine collapse which occurred near the town of Halle in Germany.
      
更多          


Evident is the response of water level in the well Lu-15 to the process of mine collapse. Tentative analysis shows that using some precursory phenomena before a bigger mine collapse, a prediction of earthquake for the bigger mine collapse will can be made. For instance, the active time of less collapse before the bigger collapse will increase; the average change of water level in the well in each active period, the duration time ine ach active period and each calm period will all change before the bigger collapse:...

Evident is the response of water level in the well Lu-15 to the process of mine collapse. Tentative analysis shows that using some precursory phenomena before a bigger mine collapse, a prediction of earthquake for the bigger mine collapse will can be made. For instance, the active time of less collapse before the bigger collapse will increase; the average change of water level in the well in each active period, the duration time ine ach active period and each calm period will all change before the bigger collapse: the abnormalities in the ∑N-t and No-△t curves will all appear 28 days before the bigger collapse.

鲁15井水位对矿井崩塌过程有明显的反映。经初步分析表明,利用矿井大崩塌前的基些前兆现象可对较大矿井崩塌进行预报,如:大崩塌前小的崩塌活动次数加密;大崩塌前各活动期平均井水位变化、各活动期持续的时间和各平静期持续的时间都有变化;∑N-t和No-△t曲线都在大崩塌前28天出现异常。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关矿井崩塌的内容
在知识搜索中查有关矿井崩塌的内容
在数字搜索中查有关矿井崩塌的内容
在概念知识元中查有关矿井崩塌的内容
在学术趋势中查有关矿井崩塌的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社