助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   测度模型 在 矿业工程 分类中 的翻译结果: 查询用时:0.023秒
图标索引 在分类学科中查询
所有学科
矿业工程
宏观经济管理与可持续发展
数学
企业经济
经济理论及经济思想史
教育理论与教育管理
旅游
资源科学
工业经济
更多类别查询

图标索引 历史查询
 

测度模型
相关语句
  measure model
    Application of unascertained measure model in mining enterprises economic benefit evaluation
    煤炭企业经济效益评价的未确知测度模型
短句来源
    The Unascertained Measure Model and Application for Preliminary Evaluation of Coal Mine Safety
    煤矿安全预评价的未确知测度模型及应用
短句来源
    The index system of preliminary evaluation for coal mine is built on the basis of unascertained math theory, and the rules of incredible recognition and score are given at the same time in this paper. In addition, the unascertained measure model is established and quantitative analysis of every safety index is done.
    本文根据未确知数学理论,建立了预评价指标体系、置信度识别准则及评分准则,构造了矿井安全预评价未确知测度模型,并对矿井的各个安全指标进行了定量分析。
短句来源
    The paper defines intensive exploitation of mineral resources and approaches to it,proposes the fundamental index system of evaluating intensive exploitation of mineral resources,and discusses the way to set up measure model of intensive exploitation of mineral resources.
    明确了矿产资源集约化开发利用的定义及其实现途径,提出了其集约化评价的基本指标 体系,在此基础上探讨了矿产资源集约化开发利用测度模型的建立方法。
短句来源
    A result of safety evaluation was educed according to the rules of credible recognition after a index system in colliery ventilation safety evaluation was established. An unascertained measure model was constructed and the unascertained measure values of all evaluation indexes were calculated. This method can solve a lot of unascertained problems in ventilation system evaluation,and also can analyze the ventilation system quantitatively.
    运用未确知测度理论建立矿井通风系统安全评价指标体系,构造了未确知测度模型,计算了各评价指标的未确知测度值.根据置信度识别准则进行等级判定,得出了评价结果.该评价方法能解决矿井通风评价中诸多因素不确定性问题,还能对其进行定量分析.实例表明,用未确知测度评价模型对矿井通风安全进行评价,其计算结果与实际运行情况很吻合.
短句来源
  “测度模型”译为未确定词的双语例句
    The Application of Unascertained Model on the Quality Control in the Ore-blending
    未确知测度模型在矿石质量控制过程中的应用
短句来源
    Established index system of coal mine safety appraisal, based on integrated consideration about the influencing factors of coal mine safety appraisal. It used the rough set to make property reduction,then distilled the core influencing factors. Then using information entropy confirm objective index weight,and employing the unascertained theory elicited the synthesizes appraisal of coal mine safety,which enhanced the object and accuracy of appraisal.
    在综合考虑影响煤矿安全评价因素的基础上,建立了煤矿安全评价指标体系,应用粗集理论进行属性约简,提取核心影响因素,并用信息熵确定指标客观性权重,然后建立未确知测度模型对煤矿安全进行综合评价,提高了评价结果的客观性和准确性.
短句来源
查询“测度模型”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  measure model
In this paper we deal with the measure model with independently distributed errors.
      
A method is developed on the basis of the fundamental measure model of the density functional theory for calculating solvation of hydrophobic particles.
      
Measured pressure distributions can now be properly interpreted in terms of observed detailed flow patterns, without having to undertake complementary wind tunnel experiments to measure model loading.
      
Nonlinear error in measure model is adopted in the camera calibration; the interactive correlation matching is used under constraint of epipolar line and edge of tree detected by Canny operator.
      
In this way, only the oxygen, neon and iron abundances of Pottasch (1967), combined with either an isothermal or exponential temperature-emission measure model are consistent with both sets of data.
      
更多          


Fuzzy mathematics theory is here used to analyse fissured rock stability, a practical fuzzy inferring model is established aceording to fuzzy inferring principle, its numerical mithod is also given. The model can be easily used to analyse mine slope stability.

用模糊数学(FuzzyMathmatics)理论分析裂隙岩质边坡稳定性问题,根据模糊测度原理,针对实际边坡工作问题,建立了具有实际工程意义的模糊测度模型,并给出了具体的数值方法,使该模型可以更方便地用于分析矿山边坡稳定问题。

The unascertained measuring model used to select mine designing projects is given Based on unascertained measuring space, this model is rigorous According to the array character of evaluation space, the marking identification criterions is set up, and the projects is arrangeel in order.

对矿井的不同设计建立了选优决策的未确知测度模型.在未确知测度空间基础上,根据评价空间的有序性建立评分准则,并对矿井设计方案优劣排序.

The natural disasters in coal mine involves many unascertained factors which may bring a lot of troubles to the preliminary evaluation of coal mine safety. The index system for preliminary evaluation of coal mine is built on the basis of unascertained mathematical theory and the identification and evaluation criterion for confidence degree and score are given at the same time in this paper. In addition, the unascertained measure model for preliminary evaluation is set up and quantitative analysis of every safety...

The natural disasters in coal mine involves many unascertained factors which may bring a lot of troubles to the preliminary evaluation of coal mine safety. The index system for preliminary evaluation of coal mine is built on the basis of unascertained mathematical theory and the identification and evaluation criterion for confidence degree and score are given at the same time in this paper. In addition, the unascertained measure model for preliminary evaluation is set up and quantitative analysis of every safety index is made. The comprehensive evaluation on the natural disasters occurred in Huangling No.2 Mine showed that the results of preliminary evaluation accord with the fact, this thus opening up a new way for the preliminary evaluation of coal mine safety.

根据未确知数学理论,建立了预评价指标体系、置信度识别准则及评分准则,构造了矿井安全预评价未确知测度模型,并对矿井的各个安全指标进行定量分析。通过对黄陵二号井的自然灾害状况进行了综合评价,评定结果与实际耦合较好,为煤矿建设项目的安全预评价开辟了一条新途径。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关测度模型的内容
在知识搜索中查有关测度模型的内容
在数字搜索中查有关测度模型的内容
在概念知识元中查有关测度模型的内容
在学术趋势中查有关测度模型的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社