助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   井筒涌水 的翻译结果: 查询用时:0.302秒
图标索引 在分类学科中查询
所有学科
石油天然气工业
矿业工程
更多类别查询

图标索引 历史查询
 

井筒涌水
相关语句
  shaft water pouring
     According to the geological siluation of the bedrock water-bearing layer of the main inclined shaft of Qincheng Coalmine, people made the comparison and selection of treating scheme for the shaft water pouring by using various injecting and ponding schemes, and determined the pre - injecting construction technique at last.
     根据沁城井田主斜井过基岩含水层地质概况,比选了注浆堵水方案治理井筒涌水的方法,最后确定了预注浆施工技术方案。
短句来源
  shaft water inrush
     New Methods about Shaft Water Inrush Control of Laohutai Mine
     抚顺老虎台矿治理井筒涌水的新方法
  “井筒涌水”译为未确定词的双语例句
     CONTROLLING THE WATER INRUSH FROM LOOSE LAYERS IN SHAFT BY GROUTING FROM LAND SURFACE
     地面注浆封堵松散层段井筒涌水
短句来源
     PRINCIPLE AND APPLICATION OF QUAKING BLAST FOR ADDING TO WATER VOLUME OF SURGING IN WELL
     震动炮增加井筒涌水的原理和应用
短句来源
     The outburst of ground water from the loose layers with great thickness in the South ari shaft of Luling Coal Mine was over ten years.
     芦岭煤矿南风井巨厚松散层段井筒涌水,采用地面注浆堵水方法获得成功。
短句来源
     In order to minimize the gushing water in the shaft,a pre-grouting technology was used at working face to control underground gushing water,thus being able s moothly to complete the construction work of the rest 130m section of the shaft under more complicated hydrogeological conditions.
     在掘进过程中存在设备排水能力明显不能满足需要的状况 ,为了将井筒涌水降至最低限度 ,采用工作面预注浆技术防治地下涌水 ,较顺利地完成了剩余 130m水文地质条件较复杂地层井筒的施工。
短句来源
     According to the Special featnres of the shaft wall rocks and its watering:it is suggested to put shaft watering under control,with the advanced Slertyinpouring technigue,and thus to ensure the guality of the construction,to enhance the Stability of the Shaft.
     根据井筒围岩特征和涌水特点,采取先进的注浆技术,对井筒涌水进行有效控制,保证建井施工安全和工程质量,提高井筒稳定性。
短句来源
  相似匹配句对
     PRINCIPLE AND APPLICATION OF QUAKING BLAST FOR ADDING TO WATER VOLUME OF SURGING IN WELL
     震动炮增加井筒的原理和应用
短句来源
     New Methods about Shaft Water Inrush Control of Laohutai Mine
     抚顺老虎台矿治理井筒的新方法
     Water
    
短句来源
     They always connected water with their attitude.
    
短句来源
     CONTROLLING THE WATER INRUSH FROM LOOSE LAYERS IN SHAFT BY GROUTING FROM LAND SURFACE
     地面注浆封堵松散层段井筒
短句来源
查询“井筒涌水”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The outburst of ground water from the loose layers with great thickness in the South ari shaft of Luling Coal Mine was over ten years.with the method of grouting from land surface,the success of water plugging has come true.The layouts of drill holes,the option of grouting parameters and the technology of construction were introduced emphatically.

芦岭煤矿南风井巨厚松散层段井筒涌水,采用地面注浆堵水方法获得成功。本文着重介绍地面注浆堵水钻孔布置、注浆参数选择及工艺系统

A 1000m shaft was submerged by underground gushing water at Dongguashan Mine in Tongling and the depth of water came up to 800m.After som e drain measures such as dumping waste rock in deep water and sealed bottom by g routing were performed,the sinking of the shaft was resumed,but in the process o f sinking,the existing drainage capacity failed to meet the requirement obviousl y.In order to minimize the gushing water in the shaft,a pre-grouting technology was used at working face to control underground gushing...

A 1000m shaft was submerged by underground gushing water at Dongguashan Mine in Tongling and the depth of water came up to 800m.After som e drain measures such as dumping waste rock in deep water and sealed bottom by g routing were performed,the sinking of the shaft was resumed,but in the process o f sinking,the existing drainage capacity failed to meet the requirement obviousl y.In order to minimize the gushing water in the shaft,a pre-grouting technology was used at working face to control underground gushing water,thus being able s moothly to complete the construction work of the rest 130m section of the shaft under more complicated hydrogeological conditions.

铜陵冬瓜山千米竖井因突水淹没 ,水深达 80 0m。经采取深水下抛碴注浆封底排水措施后 ,恢复井筒掘进。在掘进过程中存在设备排水能力明显不能满足需要的状况 ,为了将井筒涌水降至最低限度 ,采用工作面预注浆技术防治地下涌水 ,较顺利地完成了剩余 130m水文地质条件较复杂地层井筒的施工。

Advanced working technique and mixed operation method is adopted in vertical shaft collar,mechanized sets of vertical shaft:big winch,big well-bucket hoist waste rock,big grab lnoader grab rock,largh section high (3.0 m) whole down,knife of metal hydraulic plate cut wall,drilling machine with six arm umbel drillshole.Plain face and bottom,weak shock,light blasting in deep nole technique,working way is tmpnved "mixed roll work in shifts" working and "thousand fen" piece constraction is practised,pre-injection...

Advanced working technique and mixed operation method is adopted in vertical shaft collar,mechanized sets of vertical shaft:big winch,big well-bucket hoist waste rock,big grab lnoader grab rock,largh section high (3.0 m) whole down,knife of metal hydraulic plate cut wall,drilling machine with six arm umbel drillshole.Plain face and bottom,weak shock,light blasting in deep nole technique,working way is tmpnved "mixed roll work in shifts" working and "thousand fen" piece constraction is practised,pre-injection and injection beside wall is practised in workface,water bursting of shaft collar is controlled;manayement of item method is implemented,and quick working is realized.

立井井筒采用国内目前最先进的施工技术和混合作业施工法 ,采用立井机械化配套 ,即采用大绞车、大吊桶提升出矸 ,大抓岩机抓岩 ,大段高 (3 0m)整体下行刃脚金属液压模板砌壁 ,6臂伞钻打眼。光面、光底、弱震、弱冲深孔光爆技术 ;改善作业方式 ,实行“混合滚班制”作业和“千分制”计件承包 ,提高正规循环率 ;实行工作面预注浆和壁后注浆 ,有效控制井筒涌水 ;实施项目法管理 ,实现快速施工

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关井筒涌水的内容
在知识搜索中查有关井筒涌水的内容
在数字搜索中查有关井筒涌水的内容
在概念知识元中查有关井筒涌水的内容
在学术趋势中查有关井筒涌水的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社