助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   锁口管法 的翻译结果: 查询用时:0.202秒
图标索引 在分类学科中查询
所有学科
建筑科学与工程
更多类别查询

图标索引 历史查询
 

锁口管法
相关语句
  fore shaft pipe method
     Drilling occlusion pile construction with fore shaft pipe method
     用锁口管法施工钻孔咬合桩
短句来源
     From constructional plan, constructional scheme of drilling occlusion piles, design of fore shaft pipe, selection of rigs, constructional technology and matters needing attention in construction the writer discusses that the fore shaft pipe method can avoid the above shortages, proves that high quality building enclosure of drilling occlusion piles can be finished rapidly with this method.
     通过钻孔咬合桩的施工计划、施工方案以及锁口管设计、钻机选择、施工工艺、施工中的注意事项几方面论述了锁口管法可以避免以上缺点 ,证明应用此法可快速、优质地完成钻孔咬合桩墙围护结构
短句来源
  相似匹配句对
     Drilling occlusion pile construction with fore shaft pipe method
     用施工钻孔咬合桩
短句来源
     Hydraulic Tube Pointer
     端缩液压机
短句来源
     Looped Flow Methods in the Calculation of Pipe Networks
     网平差环流量
短句来源
     Study on inserting stomach tube for intoxication gastrolavage with mouthful of water
     含液体置胃用于中毒洗胃的研究
短句来源
     (2) Uchida's ligature;
     Uchida组;
短句来源
查询“锁口管法”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The partial plain concrete of building enclosure of drilling occlusion piles need to be removed in construction, it causes waste of materials, brings inconvenience for construction. In view of these shortages, the writer introduces fore shaft pipe method. From constructional plan, constructional scheme of drilling occlusion piles, design of fore shaft pipe, selection of rigs, constructional technology and matters needing attention in construction the writer discusses that the fore shaft pipe method can avoid...

The partial plain concrete of building enclosure of drilling occlusion piles need to be removed in construction, it causes waste of materials, brings inconvenience for construction. In view of these shortages, the writer introduces fore shaft pipe method. From constructional plan, constructional scheme of drilling occlusion piles, design of fore shaft pipe, selection of rigs, constructional technology and matters needing attention in construction the writer discusses that the fore shaft pipe method can avoid the above shortages, proves that high quality building enclosure of drilling occlusion piles can be finished rapidly with this method.

针对钻孔咬合桩围护结构在施工中需钻掉部分素混凝土 ,造成材料多耗且为施工带来不便的缺点 ,介绍了锁口管法。通过钻孔咬合桩的施工计划、施工方案以及锁口管设计、钻机选择、施工工艺、施工中的注意事项几方面论述了锁口管法可以避免以上缺点 ,证明应用此法可快速、优质地完成钻孔咬合桩墙围护结构

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关锁口管法的内容
在知识搜索中查有关锁口管法的内容
在数字搜索中查有关锁口管法的内容
在概念知识元中查有关锁口管法的内容
在学术趋势中查有关锁口管法的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社