浇筑强度     
相关语句
  cost intensity
     The paper determines the maximum optimization cast intensity of roller compacted concrete in Jiangya dam project by multipurpose blur comprehensive judgment technology and arrangement analysis method, gives a convenient, rapid, scientific decision method for determining the maximum cost intensity of roller compacted concrete under the circumstance of comprehensive consideration of project time and installation investment restriction.
     本文采用多目标模糊综合评判技术及层次分析方法确定江垭大坝优化的碾压混凝土最高浇筑强度,综合考虑了工程有效工期及设备投资的约束,为预测碾压混凝土最高浇筑强度提供了一种方便、快捷、科学合理的决策方法。
短句来源
  placing intensity
     lt is not easy to cause separation of aggregates during conveying low vlscosity concrete,so ROTEC can be considered as a kind of high placing intensity,easy for manipulating,new type equipments.
     用于输送VC值较小的混凝土时不易产生分离,不失为一种浇筑强度高、运用灵活的新型设备。
短句来源
     The dam construction is characterized by short construction period, high placing intensity and required continuous year-around construction. In order to ensure the quality and construction progress, the advanced construction equipment and workmanship must be used.
     大坝施工工期紧,浇筑强度高,要求全年连续施工,为确保工程质量和施工进度,必须采用先进的设备和工艺作保证。
短句来源
  placement intensity
     , with the maximum concrete placement area of 19012m2, the maximum concrete placement intensity of 47.6×104m3 per month, and 21066m3 per day.
     通过科技攻关,精心施工,创造了碾压混凝土浇筑多项世界纪录,最大仓面面积达到19012m2,最大月浇筑强度达47.6万m3,最大日浇筑强度达21066m3等。
短句来源
     In the year 1999, the focal points of the Three Gorges Project construction were turned from earth-rock excavation into larg-scale concrete placement. Builders faced a serious situation of high concrete placement intensity, urgent schedule, strict requirements for temperature control design, concrete placement in restrained zones of foundation in hot seasons, delayed deployment of construction equipment.
     1999年,为三峡工程二期施工阶段由开挖为主转入混凝土浇筑高峰期的关键一年,面临混凝土浇筑强度 高、进度紧、温控设计要求严、高温季节浇筑基础约束区混凝土和施工设备投产晚的严峻局面。
短句来源
     The concrete placement intensity from May to October is generally 480 m\+3/h. In order to guarantee concrete construction quality in high temperature season, in the installation process of cooling system, the supervisors made out strict quality control plan and defined quality control points, strengthened quality control in the whole installation process and carried out control in every construction link in the light of cooling system installation.
     5~ 1 0月混凝土浇筑强度一般为 480m3 h ,为确保高温季节混凝土施工质量 ,在制冷系统安装过程中 ,监理人员编制严格质量控制计划、明确质量控制点 ; 加强对安装全过程质量控制 ,针对制冷系统安装的施工特点 ,做到层层把关。
短句来源
     In order to ensure that the right dam of the Three Gorges Project will be built to the elevation of 185 m before June,2006,researches on 3-m lift concrete construction technology for the Stage-3 Three Gorges Project and on measures to be taken for applying this technology were conducted in temperature control,placement intensity and construction quality of mass concrete. This paper presents in detail the research results and their successful application in the Stage-3 Three Gorges Project.
     为确保三峡工程右岸大坝在2006年6月前全线达到坝顶高程185 m,从大体积混凝土的温度控制、浇筑强度和质量等方面对三峡三期工程采用3 m升层的混凝土施工技术和实施措施进行了研究,详细介绍了研究成果及其在三峡三期工程中的成功应用。
短句来源
  “浇筑强度”译为未确定词的双语例句
     The relevant concrete production system, workmanship of concrete placing and anti-cracking measures are described.
     但由于浇筑强度高和温控标准严 ,混凝土生产系统 (人工砂石系统、混凝土拌和系统、制冷系统 )、混凝土浇筑工艺以及混凝土温控和防裂措施都必须与这种浇筑方式相适应。
短句来源
     Analysis on the matching modulus and pouring strength of the concrete construction system for Ertan Hydropower Station
     二滩工程混凝土施工系统匹配模数与浇筑强度分析
短句来源
     The casting intensity by ordinary vertical concrete transport is low and the disturbance is large.
     普通的混凝土垂直运输方式浇筑强度低,受干扰大。
短句来源
     The intensity of concrete aggregates production changes with that of concrete placement during construction of a concrete dam.
     混凝土坝施工过程混凝土浇筑强度变化,其骨料生产强度也应随之。
短句来源
     Given the characteristics of large work load,long peak hours of pouring work(about ten months),and high intensity of pouring work(the maximum annual pouring intensity is 3,400,000m~3),the scales and productivities of artificial aggregate processing system,concrete production system,as well as vertical and horizontal concrete conveyance system related to dam pouring take the lead in a number of hydropower projects under construction.
     因工程混凝土总量大,浇筑高峰时间长(约10个月),浇筑强度高(最高年浇筑强度为340万m3混凝土)的特点,与大坝混凝土浇筑相关的人工砂石料系统、混凝土生产系统、混凝土垂直和水平运输系统的规模和生产能力都居在建水电工程的前列。
短句来源
更多       
查询“浇筑强度”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  cost intensity
Energy cost intensity is the annual cost of energy used per square foot.
      
In general, as energy cost intensity increases, energy-efficient design strategies become more cost-effective.
      
Laboratories have a high energy cost intensity that can be used to justify more efficient, energy-saving systems.
      
The lower cost intensity is mainly because less space conditioning is needed than in most other buildings.
      
Warehouses have overall lower illumination requirements as well as lower cost intensity than other building types.
      


Study is further carried out on construction schemes of partial dam body of Three Gorges Project to adopt RCC during technical design stage.Analysis and comparisons show that with adopting RCC,the total construction time taken may be 3 months shorter than preliminary design stage,and the time of concrete placing to the top of the dam may be 4 months ahead of schedule. However,the annual peak intensity of concrete placement would increase from 4.1 million m3 of conventional concrete to present 4. 83 million m3,and...

Study is further carried out on construction schemes of partial dam body of Three Gorges Project to adopt RCC during technical design stage.Analysis and comparisons show that with adopting RCC,the total construction time taken may be 3 months shorter than preliminary design stage,and the time of concrete placing to the top of the dam may be 4 months ahead of schedule. However,the annual peak intensity of concrete placement would increase from 4.1 million m3 of conventional concrete to present 4. 83 million m3,and monthly peak intensity from 460 thousand m3 to 539 thousand m3. The occurrence time of peak intensity will be ahead of the original target date. The construction of C'Oncrete will become more unbalanced.For adopting RCC in construction of partial Three Gorges dam body,four RCC placement schemes are studied preliminarily, of which two schemes ate recommended:the one is that the dam body below elevation of 120 m will be placed by using U. S.Rotec tower crane infullset,above elevation of 120 m using high-framed portal cranes;the another is that the dam body below elevation of 53m will be placed by using heavy creter cranes(or dump trucks directly to the placing area),above elevation of 53 m using heavy tower cranes.For cautiousness,it is suggested that the key equipments of above two schemes,i. e.specific tower crane,and heavy creter crane 4 must be productively used in first-stage works before they will be used in concrete placement of Three Gorges dam' With partial dam body to adopt RCC,because of increment of concrete placement intensity,the capacity of mixer plant must be also increased,while the capacity of cooling plant is still equivalent to one of conventional concrete scheme.

三峡工程技术设计阶段进一步研究了三峡大坝部分采用RCC碾压混凝土的方案,经分析比较,工期可较初设推荐方案缩短3个月和提前4个月将坝体浇筑至坝顶。但枢纽最高年混凝土浇筑强度将由常态混凝土方案的410万立方米增大到483万立方米,最高月强度由46万立方米增大到53.9万立方米,且高峰提前,施工不均匀性增大。部分采用碾压混凝土方案的施工,初步研究了4个浇筑方案,推荐高程120米以下用美国洛泰克塔带机成套设备、高程120米以上用高架门机浇筑的方案和高程53米以下用大型塔机吊皮带机(或自卸汽车直接入仓)、53米以上用大型塔机浇筑两个方案。为慎重起见,建议上述两个方案的关键设备,即专用塔带机和大型塔机用于三峡大坝浇筑混凝土之前,必须先在一期工程先进行生产性使用。由于强度的增加,大坝部分采用碾压混凝土后,拌和楼配置的容量需增大,冷冻容量则仍与常态混凝土方案相当。

The total concrete work of the Three Gorges Project will amount 27, 000,000 m3. In order to guarantee high con struction quality,the advanced construction equipments in the world should be used. For accumulating experience from the con struction of the concrete longitudinal cofferdam,China Changjiang Three Gorges Project Development Corporation imported a set of concrete transport equipments from ROTEC company, U. S. A. These equipments include the following: tower - belt crane, tyre-mounted tower crane,screw...

The total concrete work of the Three Gorges Project will amount 27, 000,000 m3. In order to guarantee high con struction quality,the advanced construction equipments in the world should be used. For accumulating experience from the con struction of the concrete longitudinal cofferdam,China Changjiang Three Gorges Project Development Corporation imported a set of concrete transport equipments from ROTEC company, U. S. A. These equipments include the following: tower - belt crane, tyre-mounted tower crane,screw conveyer bucket and concrete transport car. This set of equipments can convey materi al simultaneously from three sources. The theoretical conveying capacity is 253. 62 m3/h,but for some reasons,the actul convey ing capacity achieved only 185. 79 m3/h. lt is not easy to cause separation of aggregates during conveying low vlscosity concrete,so ROTEC can be considered as a kind of high placing intensity,easy for manipulating,new type equipments.

三峡工程主体混凝土总量约2700万m3。为确保一流的工程质量,引进和应用国际上先进的混凝土施工技术和设备是十分重要的。考虑到混凝土纵向围堰施工将为大坝摸索施工经验,三峡总公司于1995年由美国罗泰克公司引进了成套混凝土输送设备,包括:塔带机、胎带机、螺旋给料斗和混凝土运输车。该设备可从三方面同时供料,理论输送能力253.62m3/h,但由于多种原因,实际输送能力仅185.79m3/h。用于输送VC值较小的混凝土时不易产生分离,不失为一种浇筑强度高、运用灵活的新型设备。

As a half-structured problem, the transport plan selecting for roller-compactedconcrete construction is influenced by. many factors, such as project scale, concreting strength,topographic condition, locating condition, construction diversion, construction scheme , and soon, and can not be fully described with the structured methods. So it is necessary to adopt thernethods based on experience and unsystematic knowledge to help solve this problem. Because ex-pert system has the characteristics of combination of...

As a half-structured problem, the transport plan selecting for roller-compactedconcrete construction is influenced by. many factors, such as project scale, concreting strength,topographic condition, locating condition, construction diversion, construction scheme , and soon, and can not be fully described with the structured methods. So it is necessary to adopt thernethods based on experience and unsystematic knowledge to help solve this problem. Because ex-pert system has the characteristics of combination of knowledge and judgement and has the abilityto process and analyses irregular data, it can be widely applied in the field of decision making ofconstruction schemes. in this paper, a knowledge-based expert system for the transport plan se-lection of roller-compacted concrete construction (RCPSES) has been developed by authors. TheRCPSES includes case base, knowledge base, reasoning machine , explaining system and dynamicdata base. Meanwhile, a re1evant software for the transport plan selecting of roller-compactedcorcrete construction has been developed by authors. And it has passed the unit test, integral testand system test- According to the information of projects to be constructed, the expert system isable to give a feasible and reasonable transport plan of construction. The validity has been veri-fied in practice.

碾压混凝土施工运输方案的选择受工程规模、浇筑强度、地形条件、布置条件、施工导流以及施工进度等众多因素的影响,是一个半结构化的问题,不能完全用结构化方法来描述.解决这类问题要借助于经验的、尚未形成科学体系的知识.专家系统具有知识与判断相结合,不规则数据的处理与分析等特征,在施工方案决策领域具有广阔的应用前景。笔者建构了碾压混凝土施工运输方案选择的专家系统RCPSES,包括案例库、知识库、推理机、解释系统和动态数据库。同时,开发了碾压混凝土施工运输方案选择专家系统的计算机软件,并对该软件进行了单元测试、整体测试和系统测试.根据拟建工程的实际资料数据,可以推理得到合理可行的施工运输方案,该系统在工程实际应用中得到了验证.

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关浇筑强度的内容
在知识搜索中查有关浇筑强度的内容
在数字搜索中查有关浇筑强度的内容
在概念知识元中查有关浇筑强度的内容
在学术趋势中查有关浇筑强度的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社