     THE CONSTRUCTION TECHNOLOGY OF NUGUKOU TRANS-SEA BRIDGE BASE AND ITS UNDERSTRUCTURE
     女姑口跨海桥基础及下部构造施工技术
短句来源
     The base and understructure of Nugukou trans-sea bridge was completed in the end of 1993. Some practical measures were taken during the constructlon, such as the con struction of off shore steel structure operation platform, the construction of the carrying platform conducted by using the method of combination of reinforced concrete with steel box and the method of broken-pile treatment in collapsed hole
     青岛环胶州湾公路女姑口跨海桥海上基础及下部构造工程于1993年底完成。 施工中采取了一些切合实际的做法,如搭设海上钢结构作业平台,承台施工采用钢筋混凝土与钢套箱相结合方法以及坍孔断桩处理等。
短句来源
  相似匹配句对
     The Bridge
    
短句来源
     bridge
    
短句来源
     THE CONSTRUCTION TECHNOLOGY OF NUGUKOU TRANS-SEA BRIDGE BASE AND ITS UNDERSTRUCTURE
     女姑口基础及下部构造施工技术
短句来源
     Design of Steel Box Girders of Channel Bridges of Hangzhou Bay Sea-Crossing Bridge
     杭州湾航道钢箱梁设计
短句来源
     Design of Nanmeng bridge of Xiangshan Sanmengkou over sea bridge
     象山县三门口南门设计
短句来源
查询“跨海桥”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The Gaoji Strait Bridge in Xiamen(Amoy)adopts a superstructure of continuous prestressed concrete box girders with equal spans of 45m each and the stepping formwork construction method. It uses a substructure of thin-walled rectangular piers and pile foundation.This bridge is the longest straitcrossing one at present in China.

厦门高集海峡大桥主桥上部为45m等跨等截面预应力混凝土连续箱梁,采用纵向滑模逐跨现浇混凝土施工;下部为薄壁矩形墩桩基础。该桥是目前我国最长的跨海桥

The base and understructure of Nugukou trans-sea bridge was completed in the end of 1993. Some practical measures were taken during the constructlon, such as the con struction of off shore steel structure operation platform, the construction of the carrying platform conducted by using the method of combination of reinforced concrete with steel box and the method of broken-pile treatment in collapsed hole

青岛环胶州湾公路女姑口跨海桥海上基础及下部构造工程于1993年底完成。施工中采取了一些切合实际的做法,如搭设海上钢结构作业平台,承台施工采用钢筋混凝土与钢套箱相结合方法以及坍孔断桩处理等。本文仅就桥的海上基础及下部构造施工做概略介绍。

The basic design procedure and method for the offshore steel platform are described in light of the Nügushan strait crossing bridge foundation construction

结合青岛女姑山跨海桥基工程实践,介绍海滨钢平台设计的基本程序与方法。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关跨海桥的内容
在知识搜索中查有关跨海桥的内容
在数字搜索中查有关跨海桥的内容
在概念知识元中查有关跨海桥的内容
在学术趋势中查有关跨海桥的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社