助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   护岸基础 的翻译结果: 查询用时:0.006秒
图标索引 在分类学科中查询
所有学科
水利水电工程
更多类别查询

图标索引 历史查询
 

护岸基础
相关语句
  “护岸基础”译为未确定词的双语例句
     Gugang PCCP Pipeline of YRDP's Connection Works is near to Fenhe Riv er course, therefore some necessary protective measures are needed to ensure its safe operation, also to make special scour protection design for the bank revet ment foundation at the curve bends of the river course.
     山西省万家寨引黄工程连接段古钢段PCCP距汾河河道较近,为保证PCCP的安全运行,需对其进行必要的防护,并需对河流转弯水流冲刷较严重处的护岸基础进行专门的防冲刷设计。
短句来源
  相似匹配句对
     The Theoretical Basis.
     理论基础
短句来源
     The Foundation of Insulation Grid Bipolar Transistor
     绝缘栅双极晶体管基础
短句来源
     The Construction of an Under ground Continuous Wall Foundation at the Bridge site of “Sangbugongji Bridge”
     桑布贡吉桥护岸地下连续墙基础施工
短句来源
     APPLICATION OF THE PILE-SUPPORTED STAND FOUNDATION IN THE BANK PROTECTION ENGINEERING OF THE URBAN REACH OF YUNAN DYKE
     桩承台基础在筠安堤城区段护岸中的应用
短句来源
查询“护岸基础”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Gugang PCCP Pipeline of YRDP's Connection Works is near to Fenhe Riv er course, therefore some necessary protective measures are needed to ensure its safe operation, also to make special scour protection design for the bank revet ment foundation at the curve bends of the river course. This paper briefly expou nds the general situation of the works, introduces three schemes for the design of scour protection foundation, and through technical and economical comparison, selects the reinforced concrete tank underground...

Gugang PCCP Pipeline of YRDP's Connection Works is near to Fenhe Riv er course, therefore some necessary protective measures are needed to ensure its safe operation, also to make special scour protection design for the bank revet ment foundation at the curve bends of the river course. This paper briefly expou nds the general situation of the works, introduces three schemes for the design of scour protection foundation, and through technical and economical comparison, selects the reinforced concrete tank underground continuous wall as the design scheme of the scour protection foundation of this PCCP protective works.

山西省万家寨引黄工程连接段古钢段PCCP距汾河河道较近,为保证PCCP的安全运行,需对其进行必要的防护,并需对河流转弯水流冲刷较严重处的护岸基础进行专门的防冲刷设计。简述了工程概况,并介绍了防冲刷基础设计的3种方案,经过技术经济比较,最终选择了钢筋混凝土槽式地下连续墙作为该段PCCP防护工程的防冲刷基础设计方案。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关护岸基础的内容
在知识搜索中查有关护岸基础的内容
在数字搜索中查有关护岸基础的内容
在概念知识元中查有关护岸基础的内容
在学术趋势中查有关护岸基础的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社