助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   作业时间测定 的翻译结果: 查询用时:0.212秒
图标索引 在分类学科中查询
所有学科
数学
更多类别查询

图标索引 历史查询
 

作业时间测定
相关语句
  operation time measurement
     Operation time measurement is one of the important ways to give standard operation time.
     作业时间测定是制定标准作业时间的重要途径之一。
短句来源
  “作业时间测定”译为未确定词的双语例句
     Research on Determination of Shipyard Sling Operation Time
     船厂起重作业时间测定与分析
短句来源
     At last, by integrating with the application for In-Station Process Control in CAF, the waste types in manufacturing process, how to prevent and eliminate waste and continuous improvement method are illustrated, such as quality process system, error proofing, quick changeover, visual technology etc. The work time measurement, work analysis, work balance skills and designs the standard method system about work-study in CAF are also studied.
     最后,结合工位过程控制技术在CAF 公司的具体应用,阐明了制造过程中浪费的几种类型,并说明了预防、消除浪费以及持续改善的方法,如品质程序系统、防错、快速转换等,并重点研究了在生产现场进行科学的作业时间测定以及工作分析、工作平衡的方法与技巧,在CAF 公司建立了一套标准的工作研究的方法系统。
短句来源
     This paper puts forward a method of studying the reliability of the measured operation times,aiming to provide a basis for specifying the standard operation time.
     针对作业时间测定得到的数据的可信度问题,提出了一种分析方法,从而保证了通过作业时间测定得到的数据的可靠性。
短句来源
     It is verified that the method can play an important role in time measurement for sling process.
     该方法对于起重作业时间测定具有很大的实用意义。
短句来源
  相似匹配句对
     Research on Determination of Shipyard Sling Operation Time
     船厂起重作业时间测定与分析
短句来源
     Standardize operation.
     作业规范化 ;
短句来源
     Doing Homework
     做作业
短句来源
     Operation time measurement is one of the important ways to give standard operation time.
     作业时间测定是制定标准作业时间的重要途径之一。
短句来源
     The measurement of growth curve and generation time of lactohacillus
     乳杆菌的生长曲线和世代时间测定
短句来源
查询“作业时间测定”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Operation time measurement is one of the important ways to give standard operation time.This paper puts forward a method of studying the reliability of the measured operation times,aiming to provide a basis for specifying the standard operation time.

作业时间测定是制定标准作业时间的重要途径之一。针对作业时间测定得到的数据的可信度问题,提出了一种分析方法,从而保证了通过作业时间测定得到的数据的可靠性。

In this paper,the Predetermined Time System(PTS) is used to attain standard operation motions from sling process combining with the time determining method by stopwatch.The standard operation motions are divided into two types including constant operation and functional operation.As for the first type,statistics method is used to get mean and standard deviation.About the second type,the functional relationship between operation time and the two coordinate distances is developed by means of regression methods.The...

In this paper,the Predetermined Time System(PTS) is used to attain standard operation motions from sling process combining with the time determining method by stopwatch.The standard operation motions are divided into two types including constant operation and functional operation.As for the first type,statistics method is used to get mean and standard deviation.About the second type,the functional relationship between operation time and the two coordinate distances is developed by means of regression methods.The difference between calculated results and spot value is very little through actual experiment.It is verified that the method can play an important role in time measurement for sling process.

借鉴PTS的思想,结合秒表时间研究的方法,从起重作业中提取标准作业动作,将其分为函数型和常值型两类。对于常值型动作的作业时间,用统计方法得到它们的均值和方差。函数型动作的作业时间与起重机类型和作业距离有关,用统计回归分析方法,拟合得到了起重机作业时间与两个坐标距离的关系算式。经实测验证,用所得公式计算得到的作业时间与实测时间相差很小。该方法对于起重作业时间测定具有很大的实用意义。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关作业时间测定的内容
在知识搜索中查有关作业时间测定的内容
在数字搜索中查有关作业时间测定的内容
在概念知识元中查有关作业时间测定的内容
在学术趋势中查有关作业时间测定的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社