助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   自动切负荷装置 的翻译结果: 查询用时:0.174秒
图标索引 在分类学科中查询
所有学科
电力工业
更多类别查询

图标索引 历史查询
 

自动切负荷装置
相关语句
  automatic load tripping device
     Feasibility Analysis on Installation of Low Voltage and Over Current Automatic Load Tripping Device in Southen Zhejiang Power Grid
     台州南部电网装设低压、过流自动切负荷装置可行性分析
短句来源
  相似匹配句对
     An Automatic Device for Determining Eyesight
     自动视力测定装置
短句来源
     Research on Techniques of Automatic Switching for Power Capacitor Installtion
     自动电容器装置技术的研究
短句来源
     STUDY ON REACTIVE POWER COMPENSATE BEING APPLIED TO AUTO PUT IN-TAKE OUT DEVICE
     无功补偿自动装置的研究
短句来源
     Feasibility Analysis on Installation of Low Voltage and Over Current Automatic Load Tripping Device in Southen Zhejiang Power Grid
     台州南部电网装设低压、过流自动负荷装置可行性分析
短句来源
     The Device with a Reactive Power Compensation Automatic on/off Switch
     采用无功补偿自动装置的研究
短句来源
查询“自动切负荷装置”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The near future countermeasure for insuring of power supply safety in Southern Zhejiang power grid during the failure condition of 2nd section bus of Taizhou Power Plant is studied and the feasibity analysis on power supply safety measure after installation of automatic load tripping device is carried out. The result checking calculations under vavious conditions: idling of single bus differential protection and bus idling of 2nd section bus, and during maintenance priod of Zewen 2365 transmission line. The...

The near future countermeasure for insuring of power supply safety in Southern Zhejiang power grid during the failure condition of 2nd section bus of Taizhou Power Plant is studied and the feasibity analysis on power supply safety measure after installation of automatic load tripping device is carried out. The result checking calculations under vavious conditions: idling of single bus differential protection and bus idling of 2nd section bus, and during maintenance priod of Zewen 2365 transmission line. The calculations showed that the installation of automatic load tripping device is justified.

研究了台州电厂 段母线故障时确保台州南部电网安全供电的近期对策 ,对在台南电网装设自动切负荷装置的安全供电措施进行了可行性分析 ,并在台州电厂 段母线单母差动、母差停用方式及泽温 2 3 65线检修方式下进行效果校核计算 ,结果表明 ,在台南电网增装自动切负荷装置的方案切实可行

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关自动切负荷装置的内容
在知识搜索中查有关自动切负荷装置的内容
在数字搜索中查有关自动切负荷装置的内容
在概念知识元中查有关自动切负荷装置的内容
在学术趋势中查有关自动切负荷装置的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社