助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   管理施工 的翻译结果: 查询用时:0.045秒
图标索引 在分类学科中查询
所有学科
公路与水路运输
建筑科学与工程
工业经济
更多类别查询

图标索引 历史查询
 

管理施工
相关语句
  manage construction
    How to manage construction spot visa
    怎样管理施工现场签证
短句来源
    Study on Model in Which Project Clients Manage Construction Process
    项目业主自行管理施工过程的模式研究
短句来源
  “管理施工”译为未确定词的双语例句
    According to the features of construction enterprises,from optimization of construction scheme,dynamic management of construction schedule,standardization management of construction quality,safety management and other aspects factors influencing project cost are discussed in order to increase economic benefits for construction enterprises.
    结合建筑施工企业的特点,从施工方案的优化,施工进度的动态管理,施工质量的标准化管理,施工安全管理,物资采购、供应、管理等方面对影响施工项目成本的因素进行了阐述,从而大大提高施工企业的经济效益。
短句来源
    In this paper,the construction and management of the roller compacted concrete dam of Fenhe Reservoir Ⅱ are introduced from the following five aspects: construction scheme, construction technique, design and application of the mix proportion of concrete, control of quality and progress,and construction management.
    本文从下列几个方面介绍了汾河二库碾压混凝土大坝的施工与管理 :施工方案、施工工艺、混凝土配合比的设计与应用 ,质量与进度控制以及施工管理
短句来源
    In the course of present construction,it is mainly depending on the experience to carrying on the construction management with a less and untimely exchange of construction information,thus resulted in high production cost and big waste.
    在目前的施工过程中,主要依靠经验进行施工管理,施工信息交换量少且不及时,使得生产成本高、浪费大。
短句来源
    Administation of the expense of constructting scene visa
    怎样管理施工现场签证
短句来源
    On Designers' Contract Administration on Behalf of Employer
    谈设计单位代表业主管理施工合同
短句来源
更多       
查询“管理施工”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  management and construction
As such, both management and construction rules are specified in an uniform manner.
      
Furthermore, procurement management and construction supervision remains weak in some districts.
      
It also covers areas of Plant Management and Construction equipment cost analysis Personnel management.
      


Illustrates the implication, the central idea and the chief method of TPM (Total Productive Maintenance). Based on the practical examples of using TPM in construction equipment management in Tai- Lai first class highway construction, explain the application of TPM in construction machinery management.

简要介绍TPM(全面生产维修活动)的含义、中心思想及主要方法,具体以泰莱一级公路施工中采用TPM法管理施工设备为实例,说明TPM法在施工机械管理中的运用。

he dynamic management system of construction progress for Macao International Airport project mainly consists of the following parts:schedule management,construction progress control, facilities management,project cost computation and economic analysis. The construction progress control is considered as the core of the system. During its application to the construction site,the system successfully worked out the solution to the problem of data access and protection with the help of appropriate development tools...

he dynamic management system of construction progress for Macao International Airport project mainly consists of the following parts:schedule management,construction progress control, facilities management,project cost computation and economic analysis. The construction progress control is considered as the core of the system. During its application to the construction site,the system successfully worked out the solution to the problem of data access and protection with the help of appropriate development tools and means, while data were centralized.The system has generated great economic benefit and has been highly appreciated by the user.

澳门国际机场工程计算机施工进度动态管理信息系统,是由计划管理、施工进度控制、设备管理、工程费用计算和经济分析等几个部分组成。系统是以施工进度控制为核心,系统在现场开发和应用中,由于采用了合适的开发工具和方法,成功地解决了以数据为中心的数据的存取和保护的问题。系统已取得巨大的经济效益,并获得了用户的好评。

The civil works (CW) contractor shall be responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions...

The civil works (CW) contractor shall be responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail.

指出核电站土建承包商必须根据质量保证大纲的要求,对内部分包商进行管理。管理内容包括建立严密的组织机构;开展质量保证管理、文件管理、材料管理、施工进度管理、检查和试验管理、对不符合项的管理、纠正措施以及施工档案记录等工作。详述了管理活动中,业主、土建承包商和分包商各自的职责以及管理程序。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关管理施工的内容
在知识搜索中查有关管理施工的内容
在数字搜索中查有关管理施工的内容
在概念知识元中查有关管理施工的内容
在学术趋势中查有关管理施工的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社