助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   装配作业时间 的翻译结果: 查询用时:0.543秒
图标索引 在分类学科中查询
所有学科
机械工业
更多类别查询

图标索引 历史查询
 

装配作业时间
相关语句
  assembly time
     Research on the Assembly Time of Garden Pump
     园艺泵装配作业时间研究
短句来源
     Study on Assembly Time for Micro Electric Pump Based on Modern IE
     基于现代IE的微型电泵装配作业时间研究
     The method of assembly time calculation is discussed. A evaluation method of assembly sequences with considering of production schedule is proposed. An example of assembly process planning for cylindrical spur gearbox is given.
     为此,提出了装配层状关系模型,采用割集法和与/或图产生可行装配顺序,讨论了装配作业时间的计算方法,提出了从装配生产调度的角度来评价装配顺序的方法,给出了二级圆柱齿轮减速器装配工艺规划的应用实例。
短句来源
     Take the assembly of garden pump in a corporation of Taizhou in Zhejiang as example,analyses its structure and assembly process,the standardized assembly time of garden pump is discussed by means of industrial engineering(IE) technology and mathematical statistics method.
     以浙江台州某水泵企业的园艺泵装配为例,分析了园艺泵结构和装配工艺流程,应用工业工程技术、工作研究的理论和数理统计的方法对园艺泵的标准装配作业时间进行了研究。
短句来源
     The method of determining the standardized assembly time of micro electric pump is put forward by means of industrial engineering (IE) technology, work study method and mathematical statistics theory.
     利用现代IE技术、工作研究的方法和数理统计的理论,提出了微型电泵的标准装配作业时间确定的方法。
  “装配作业时间”译为未确定词的双语例句
     The calculation of the operating time based on the predetermined time standards is discussed. A evaluation method of assembly sequences with considering production schedule is proposed. An example of assembly sequences evaluation for cylindrical spur gearbox is given.
     主要研究各种可行装配顺序的评价方法.提出了装配层状关系模型,讨论了装配作业时间的计算方法,提出了从装配生产调度的角度来评价装配顺序的方法,给出了这种装配顺序评价方法的应用实例
短句来源
  相似匹配句对
     Research on the Assembly Time of Garden Pump
     园艺泵装配作业时间研究
短句来源
     the analysis of working time and the ESIAO ways.
     作业时间分析法;
短句来源
     the working time analysis;
     作业时间分析;
短句来源
     Improvement of Assembly Operation
     装配作业的改善
短句来源
     Time is...
     时间
短句来源
查询“装配作业时间”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  assembly time
It has been shown that at a small cluster concentration of about 1014 cm-3 the assembly time drops severalfold.
      
Also given are generalized results of the effect on the assembly time of the multiplicity of paths of fullerene assembly from two-ring clusters.
      
In the scheme, the limits of burst length and assembly time are both set according to certain qualifications.
      
Then, the components of burst and packet delay are concluded, and the equations that limits of burst length and assembly time should satisfy to stabilize the burst edge delay under different buffer offered loads are educed.
      
The SDS-modified SPI adhesives were applied to fiberboard, and effects of SDS concentration, press conditions, and assembly time on bond strength were investigated.
      
更多          


The purpose of this research is to objectively evaluate the differences among the feasible assembly sequences. For this purpose an assembly hierarchy relational model is proposed. The calculation of the operating time based on the predetermined time standards is discussed. A evaluation method of assembly sequences with considering production schedule is proposed. An example of assembly sequences evaluation for cylindrical spur gearbox is given.

主要研究各种可行装配顺序的评价方法.提出了装配层状关系模型,讨论了装配作业时间的计算方法,提出了从装配生产调度的角度来评价装配顺序的方法,给出了这种装配顺序评价方法的应用实例

Assembly process generation and evaluation is very important and complex.For this purpose an assembly hierarchy relational model is proposed.The feasible assembly sequences are generated by using cutset and and/or graph.The method of assembly time calculation is discussed.A evaluation method of assembly sequences with considering of production schedule is proposed.An example of assembly process planning for cylindrical spur gearbox is given.

装配工艺的生成和评价是一个重要而复杂的问题。为此,提出了装配层状关系模型,采用割集法和与/或图产生可行装配顺序,讨论了装配作业时间的计算方法,提出了从装配生产调度的角度来评价装配顺序的方法,给出了二级圆柱齿轮减速器装配工艺规划的应用实例。

Take the assembly of garden pump in a corporation of Taizhou in Zhejiang as example,analyses its structure and assembly process,the standardized assembly time of garden pump is discussed by means of industrial engineering(IE) technology and mathematical statistics method.It can provide a credible reference for micropump’s time-making,offer a standard for the setting-up of corporation’s database and the measurement of the work efficient.The standardized work time is also a foundation for designing and improving...

Take the assembly of garden pump in a corporation of Taizhou in Zhejiang as example,analyses its structure and assembly process,the standardized assembly time of garden pump is discussed by means of industrial engineering(IE) technology and mathematical statistics method.It can provide a credible reference for micropump’s time-making,offer a standard for the setting-up of corporation’s database and the measurement of the work efficient.The standardized work time is also a foundation for designing and improving manufacturing system reasonably.All these can provide a scientific guidance for a corporation to enhance its production administration and increase its productivity.

以浙江台州某水泵企业的园艺泵装配为例,分析了园艺泵结构和装配工艺流程,应用工业工程技术、工作研究的理论和数理统计的方法对园艺泵的标准装配作业时间进行了研究。该方法可为微型电泵作业时间的定制、企业数据库的建立、工作效率的衡量和评价提供参考,为正确设计和改进作业系统提供依据。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关装配作业时间的内容
在知识搜索中查有关装配作业时间的内容
在数字搜索中查有关装配作业时间的内容
在概念知识元中查有关装配作业时间的内容
在学术趋势中查有关装配作业时间的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社