助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   项目整体 的翻译结果: 查询用时:0.268秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

项目整体
相关语句
  integral project
     And based upon that the measures of effective control to the whole objective system are discussed, an effective control system model established by way of Layer Analysis, significance and precedence of objectives and sub-objectives in different time spots within the project process analyzed, and advantages and disadvantages of substitute schemes of the project to the integral project objective judged.
     在这个基础上探讨项目整个目标系统有效控制的方法,利用层次分析法建立有效控制系统模型,分析项目实施过程中不同时点各个目标(子目标)的重要性和优先性,判断项目各替代方案对项目整体目标的优劣性。
短句来源
     The main processes of risk estimate consist of data collection, risk model building,risk occurring probability and result estimate and integral project risk appraisal.
     风险估计的主要步骤为:收集资料,建立风险模型,估计风险发生的概率与后果,项目整体风险评价。
短句来源
  “项目整体”译为未确定词的双语例句
     IT project management contains nine fields of knowledge: the management of project scale, the management of item, the management of cost, the management of quality, the management of risk, the management of stuff, the management of purchasing, the management of communication, and the macro management of item.
     项目管理包含项目范围管理、时间管理、费用管理、质量管理、风险管理、人员管理、采购管理、沟通管理、项目整体管理等九大知识领域和项目启动过程、项目计划过程、项目执行过程、项目监控过程、项目收尾过程等五大项目过程。
短句来源
     The quality of engineering design would directly affect the final quality and the project investing purpose of the chemical engineering projects .
     在化工建设项目质量形成的影响因素中,工程设计质量的好坏直接影响到化工建设项目整体质量的优劣和工程建设投资效果。
短句来源
     And in China, the client’s requirement identifying has not introduced into construction management as a method to improve the performance of whole project.
     而我国的建筑业还未将项目业主需求识别的管理思想,作为一种可以提高项目各方效益以及项目整体绩效的方法引入到建设项目中。
短句来源
     The article takes LD10-1/5-2/4-2 project as an example, summarizes management characteristics of LD oil field development project from organize management, schedule control, cost control and quality control etc. , and discusses how to search better mode & method of projects management.
     本文以旅大10-1/5-2/4-2油田群开发工程项目为例,主要从组织管理、成本控制、进度控制、质量控制等几个方面总结了旅大油田群建设工程项目管理特色,探讨了如何科学合理的处理成本、进度和质量三大主要控制目标之间的关系使项目整体效益最大化,旨在与同行共享,共同探讨更好的项目管理模式或方法。
     Therefore, Activity Compound Criticality Index (ACCI) is presented as a compound index of ACP and ACI, and on the basis of ACCI, Project Compound Criticality Index (PCCI), a new index that reflects the criticality (risk) of a whole
     鉴于各自利弊,提出一个 ACP 与 ACI 的整合指标——工序复合关键指标(Activity Compound Criticality Index,ACCI),并进一步提出了一个表征(子)项目整体“关键” (风险)水平的新指标项目——复合关键指标(Project Compound Criticality Index, PCCI)。
短句来源
更多       
  相似匹配句对
     Project Database
     项目
短句来源
     PROJECT
     项目
短句来源
     Researching on Total Marketing of Project
     项目整体营销研究
短句来源
     Study on Whole Life Process Evaluation of R&D Project
     R&D项目评估整体模型研究
短句来源
     On Entirety Enterprise Planning
     整体企划
查询“项目整体”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  integral project
The INTEGRAL project consists of a Decision Support System (DSS) and a Power and Reservoir System Scheduling Model (PRSYM).
      
Equinox considers the RLE facility to be a potential project enhancement and it is not part of the integral project development plan.
      


The author investigated the conditions of women triples which include the pesent situation, selection of difficult Parts, arrangement and display level. Based on this evaluating the whole level of women triples

根据临场裁判与调研的结果,对第七届全运会技巧预、决赛女三项目的队伍状况,难度动作的选用,各套动作的组织编排和比赛实际发挥等方面进行了较为全面的统计分析,以此对女三项目的整体水平作出评价。

Canying on economic evaluation to large-scale complex project according to definite principle, dividing the projectinto different individual item engineering, drawing up unified economic evaluation price system, handling well constructing period, production period, intermediate product, finished product, constructing period interest, financialcharge, and sale tax etc, on these basis to cany on economic evaluation not only the economy feasibility of indvidualitem engineering can be determined , hut the economy...

Canying on economic evaluation to large-scale complex project according to definite principle, dividing the projectinto different individual item engineering, drawing up unified economic evaluation price system, handling well constructing period, production period, intermediate product, finished product, constructing period interest, financialcharge, and sale tax etc, on these basis to cany on economic evaluation not only the economy feasibility of indvidualitem engineering can be determined , hut the economy feasibility of whole large-scale complex project can be scientifically evaluated.

具有一定投资规模、跨两个或两个以上行业的大型复杂建设项目的经济评价具有产品吃配关系复杂、价格体系复杂、采用的经济评价标准复杂等特点。通过把大型复杂项目按一定原则划分为不同的单项工程进行经济评价、制定统一的经济评价价格体系,处理好项目建设期、生产期、中间产品、产成品、建设期利息、财务费用及销售税金等问题,并在此基础上进行项目整体经济评价的方法,既可以确定单项工程的经济可行性,还能够科学评价大型复杂项目整体的经济可行性。

Risk evaluation is a key management step employed to avoid or prevent investment risk by appraising the risk level of a certain investment project before its execution. An artificial intelligence method is an effective choice of investment risk management. As a component of the artificial intelligence method, the artificial neural network(ANN)is dealt with in this paper. The feasibility of the ANN as an appraising tool against investment risk is discussed. Thus, the ANN model is set up, and its structure is...

Risk evaluation is a key management step employed to avoid or prevent investment risk by appraising the risk level of a certain investment project before its execution. An artificial intelligence method is an effective choice of investment risk management. As a component of the artificial intelligence method, the artificial neural network(ANN)is dealt with in this paper. The feasibility of the ANN as an appraising tool against investment risk is discussed. Thus, the ANN model is set up, and its structure is carefully designed. In the ANN model as risk evaluation, the inputs of the network should be the indices that describe or may cause the investment risks, and then the output will show the risk level. On the basis of the investment risk distinction, the input units and the output units are defined. The concealed layers and units are also determined by making use of the ANN theories and methods. In addition, the relationship between the training frequency of the network and the precision of the output has been studied and the best training frequency thus obtained should be 200 thousand times. So many times of studying 41 samples with the network have resulted in the distribution of the weights among the points of the model. This model has been applied to the real cases of some investment projects to evaluate their respective risk levels, and the results have proved satisfactory.

风险评价是投资风险管理的关键步骤,是对项目整体风险水平作出合理评价的过程.本文将人工智能方法用于解决投资风险管理问题,研究了用人工神经网络方法进行风险评价的可行性,确定了神经网络投资风险评价模型的结构和算法,计算出了节点间的权重分布.利用该模型进行了实证分析,取得满意效果

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关项目整体的内容
在知识搜索中查有关项目整体的内容
在数字搜索中查有关项目整体的内容
在概念知识元中查有关项目整体的内容
在学术趋势中查有关项目整体的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社