助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   土木工程合同 的翻译结果: 查询用时:0.006秒
图标索引 在分类学科中查询
所有学科
更多类别查询

图标索引 历史查询
 

土木工程合同
相关语句
  civil engineering contract
     This paper describes the basic concept and classfication of claim for damage in engineering, introduces the procedure for claim for damage and items of claim for damage in civil engineering contract of Federation Internationale des Ingenieure Conceit (FIDIC).
     本文论述了工程索赔的基本概念和分类,对索赔的程序和国际咨询工程师联合会(FIDIC)的土木工程合同条件中的索赔条款进行了介绍。
短句来源
  “土木工程合同”译为未确定词的双语例句
     This paper according to common several kinds of contract conditions of civil engineering and internatio nal practice,puts forward supervision engineer should follows the following principles when handling cost claim:principle of necessity,compensation,minimality,quotation and time limit.
     从国际上几种常用的土木工程合同条件及国际惯例来看 ,监理工程师在处理费用索赔时应遵循如下原则 :必要性原则、赔偿原则、最小原则、引证原则、时限原则
短句来源
     This paper investigate the optimal mechanisam design for auction of civil engineering in the existence of transaction costs.
     笔者在文中采用现代信息经济学的机制设计的方法,分析和论证了在施工条件相对简单的不存在交易成本的土木工程合同招标制度中应该采用最低投标价中标.
短句来源
  相似匹配句对
     Change in Civil Engineering Construction Contract
     土木工程施工合同中的变更
短句来源
     Terms of Contract of International Civil Engineering Construction
     国际土木工程施工合同条件
短句来源
     Employee Contract
     雇佣合同
短句来源
     The Collective Agreement
     集体合同
短句来源
     Development of civil engineering
     土木工程的发展
短句来源
查询“土木工程合同”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


This paper describes the basic concept and classfication of claim for damage in engineering, introduces the procedure for claim for damage and items of claim for damage in civil engineering contract of Federation Internationale des Ingenieure Conceit (FIDIC). These problems have an important significance to safeguard the legitimate rights and interests of double sides of contract and keep the project to be going on smoothly.

本文论述了工程索赔的基本概念和分类,对索赔的程序和国际咨询工程师联合会(FIDIC)的土木工程合同条件中的索赔条款进行了介绍。这些问题对维护合同双方的合法权益,保证工程的顺利进行具有重要的意义。

This paper according to common several kinds of contract conditions of civil engineering and internatio nal practice,puts forward supervision engineer should follows the following principles when handling cost claim:principle of necessity,compensation,minimality,quotation and time limit.

从国际上几种常用的土木工程合同条件及国际惯例来看 ,监理工程师在处理费用索赔时应遵循如下原则 :必要性原则、赔偿原则、最小原则、引证原则、时限原则

In this paper,the following content is introduced:the cause that the claim of project time occurs and the clauses in the contract which can be quoted by the contractor,the anti-claim by the employer and the clauses in the contract which can be cited by the employer,and the principle appraising the claim of project time.A case study is given.

本文介绍了国际土木工程合同管理中“工期索赔”发生的原因及承包商可引用的合同条款、业主的反索赔工作及可引用的合同条款 ,以及工期索赔的评价原则 ,并进行了实例分析。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关土木工程合同的内容
在知识搜索中查有关土木工程合同的内容
在数字搜索中查有关土木工程合同的内容
在概念知识元中查有关土木工程合同的内容
在学术趋势中查有关土木工程合同的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社