资源均衡的
相关语句
  resource leveling
     Genetic Algorithms Based on MATLAB of Construction Project Resource Leveling
     工程项目资源均衡的遗传算法及其MATLAB实现
短句来源
     FUZZY WEIGHT OPTIMAL CHOICE METHOD OF RESOURCE LEVELING IN NETWORK PLANNING
     网络计划中多资源均衡的模糊优选法
短句来源
     In order to give the neural network description of resource leveling problem and make the output correspondent with neurons,the new concept of Augmented permute matrix is proposed.
     首先提出增广置位矩阵,描述了资源均衡的神经网络表示,使得神经元的输出和问题的解彼此对应起来;
短句来源
  “资源均衡的”译为未确定词的双语例句
     Resources equilibrium base on fuzzy comprehensive similar selection method
     多资源均衡的模糊综合相似选择法研究
短句来源
     A Method of Optimal Project Scheduling for Multiple Resources Balancing
     多资源均衡的网络计划优化方法
短句来源
     converts the optimization of network diagram into the calculation of the variance σ~2,and gets the optimal solution by decreasing σ~2.Then the detail way and method of optimization are shown.
     文中引用方差σ~2来度量资源均衡的程度,把网络图的优化转换为求σ~2,并使其逐渐变小来获得最优方案.
短句来源
     Method of resources balance with preference coordination
     资源均衡的优先权协调法
短句来源
     Based on the concepts of possible project, partly possible project and the relation between partly possible projects, a method of optimal project scheduling for multiple resources balancing is proposed. 
     给出了可行计划、可行部分计划等一些概念,介绍了可行部分计划间的优势关系以及与之有关的两个定理,在此基础提出了一种解决工期最短、多资源均衡的网络计划方法。
短句来源
更多       
  相似匹配句对
     RESOURCE
     资源
短句来源
     The Weight Optimal Choice Method of Multi-Resource Leveling
     多资源均衡的权重优选法
短句来源
     Method of resources balance with preference coordination
     资源均衡的优先权协调法
短句来源
     TECHICAL RESOURCES
     技术资源
短句来源
查询“资源均衡的”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  resource leveling
By adopting MATLAB7.1, the extended particle swarm optimization algorithm was demonstrated in the resource leveling of power project scheduling.
      
This book provides the reader with a thorough grounding in the computation of precedence networks, along with some treatment of resource leveling.
      


Proportionate allocation of resources is one of the important optimization problems. In this paper, the mathematical model of such a problem is formulated by first transforming it into a 0-1 type integer programming problem through the introduction of the 0-1 variable. In the meanwhile an intuitive and simple geommetric method is devised to obtain its optimal solution. This method not only can be programmed and used on computers, but also can serve as a practical means for solving relatively large problems in...

Proportionate allocation of resources is one of the important optimization problems. In this paper, the mathematical model of such a problem is formulated by first transforming it into a 0-1 type integer programming problem through the introduction of the 0-1 variable. In the meanwhile an intuitive and simple geommetric method is devised to obtain its optimal solution. This method not only can be programmed and used on computers, but also can serve as a practical means for solving relatively large problems in terms of manual computation. The gist of this method lies in that, starting from initial peak value curve and initial horizontal bar graph, the optimal solution is found by way of successive iterations and modifications.

资源均衡分配是一类重要的优化问题。本文通过引进0—1变量,将其转化为一个0—1型整数规划问题而构成数学模型。同时设计一种直观简便的几何方法来获得最优解。此法不但能编成程序上机计算,而且对于较大规模的课题亦是实用的人工方法。本法的主要思路是从初始峰值曲线与初始横道图出发,逐次迭代调整而得最优解。

This paper manages to solve the problem on balance resource in proje- ct planning,Using dynamic programming to describe the graph model of balance of resource, and optimization algorithm based on the principle of minimum variable-square-deviation are presented,

本文试图解决网络计划中的资源均衡优化问题。提出了用动态规划来描述资源均衡问题的图模型,并根据均方差最小原理给出求其最优解的算法。

In this Paper the two prevalent solutions to the "Fixed Project Duration & Resource Equalization"-Min σ~2 and Levy Methcd have been analysed. Not only the existed questions about the two solutions are indicated but the improved algorithm is also offered. The basis of the new algorithm and its actualization process by computer are introduced. By comparison of the improved method with the prevalent methods through several actual examples we found that the solution of the improved method is better than that of...

In this Paper the two prevalent solutions to the "Fixed Project Duration & Resource Equalization"-Min σ~2 and Levy Methcd have been analysed. Not only the existed questions about the two solutions are indicated but the improved algorithm is also offered. The basis of the new algorithm and its actualization process by computer are introduced. By comparison of the improved method with the prevalent methods through several actual examples we found that the solution of the improved method is better than that of the prevalent methods.

文本对目前网络计划中“工期固定,资源均衡”的两种流行解法——Minσ~2 和Levy法,进行了分析,指出存在的问题,提出了改进算法。给出了改进算法的根据和计算机实现的方法。通过实例的对比计算,表明改进算法的解优于原方法的解,

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关资源均衡的的内容
在知识搜索中查有关资源均衡的的内容
在数字搜索中查有关资源均衡的的内容
在概念知识元中查有关资源均衡的的内容
在学术趋势中查有关资源均衡的的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社