助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   电站建筑物 在 水利水电工程 分类中 的翻译结果: 查询用时:1.182秒
图标索引 在分类学科中查询
所有学科
水利水电工程
电力工业
更多类别查询

图标索引 历史查询
 

电站建筑物    
相关语句
  power station construction
    With the topographic and geologic condition in site, and the layout of project considered, the location study and layout optimization for main power house, main transformer house, substation and tail water tunnel outlet are carried out. Also, the general layout of power station construction is discussed.
    针对厂区的地形、地质条件 ,结合枢纽布置 ,开展主厂房、主变室、变电所、尾水洞出口等的位置研究 ,优化布置 ,探讨了电站建筑物的总体布置方案。
短句来源
  power station construction
    With the topographic and geologic condition in site, and the layout of project considered, the location study and layout optimization for main power house, main transformer house, substation and tail water tunnel outlet are carried out. Also, the general layout of power station construction is discussed.
    针对厂区的地形、地质条件 ,结合枢纽布置 ,开展主厂房、主变室、变电所、尾水洞出口等的位置研究 ,优化布置 ,探讨了电站建筑物的总体布置方案。
短句来源
查询“电站建筑物”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  power station construction
Likewise, power station construction activities that included movement of earth materials and construction of roads and power lines also resulted in statistically significant changes in runoff.
      
For this project, WAPDA divided the power station construction into six contract packages, which were ordered separately.
      
Therefore, Japan is developing trigeneration with the main objective of peak electricity consumption so as to avoid power station construction.
      
The biggest saving is in the reduction in the cost of power station construction.
      
  power station construction
Likewise, power station construction activities that included movement of earth materials and construction of roads and power lines also resulted in statistically significant changes in runoff.
      
For this project, WAPDA divided the power station construction into six contract packages, which were ordered separately.
      
Therefore, Japan is developing trigeneration with the main objective of peak electricity consumption so as to avoid power station construction.
      
The biggest saving is in the reduction in the cost of power station construction.
      


The upper layer of strata of the underground power station of right bank of Shuibuya is hard, but the lower layer is soft. The upper layer rock belongs to Qixia group, alternating with hard and soft rock, and the lower layer rock belongs to Ma′an, Huanglong and Xiejing group, dissected by facing dip fault F 3 and F 4. The geologic condition is quite complicated there, with the outstanding problem of soft rock caving. With the topographic and geologic condition in site, and the layout of project considered,...

The upper layer of strata of the underground power station of right bank of Shuibuya is hard, but the lower layer is soft. The upper layer rock belongs to Qixia group, alternating with hard and soft rock, and the lower layer rock belongs to Ma′an, Huanglong and Xiejing group, dissected by facing dip fault F 3 and F 4. The geologic condition is quite complicated there, with the outstanding problem of soft rock caving. With the topographic and geologic condition in site, and the layout of project considered, the location study and layout optimization for main power house, main transformer house, substation and tail water tunnel outlet are carried out. Also, the general layout of power station construction is discussed.

水布垭右岸地下电站厂区地层上硬下软 ,上部为栖霞组层状岩体 ,软硬相间 ,下部为马鞍组、黄龙群组和写经寺组软岩 ,其间还有相向对倾的断层 F2 ,F3的切割 ,地质条件复杂 ,软岩成洞问题十分突出。针对厂区的地形、地质条件 ,结合枢纽布置 ,开展主厂房、主变室、变电所、尾水洞出口等的位置研究 ,优化布置 ,探讨了电站建筑物的总体布置方案。

The construction of TGP has proceeded smoothly since its formal start of construction in 1994 and the construction quality is good in general. The construction proceeds in accordance with the master project schedule in preliminary design approved by the central government and the investment can be controlled in the total budget estimate of the preliminary design. The Changjiang Water Resources Commission, taking charge of the general design jobs of TGP, has consistently paid attention to the project quality...

The construction of TGP has proceeded smoothly since its formal start of construction in 1994 and the construction quality is good in general. The construction proceeds in accordance with the master project schedule in preliminary design approved by the central government and the investment can be controlled in the total budget estimate of the preliminary design. The Changjiang Water Resources Commission, taking charge of the general design jobs of TGP, has consistently paid attention to the project quality in the first place and carried out large amount of investigation, design and scientific research work. This paper makes overal summarization and presentation on important technical issues in the design, such as dam, power house structure, permanent shiplocks, shiplift, project safety monitoring, main river closure and Stage Ⅱ cofferdam, mechanical and electric design etc. and put forward a lot of suggestions about optimizing design schemes and measures for solving construction difficulties in accordance with consturction progress.

三峡工程自 1994年正式开工以来 ,工程进展顺利 ,目前各项施工正紧张有序地进行 ,工程质量总体良好 ,施工进度按国家批准的初步设计总进度实施 ,工程投资可以控制在初步设计的总概算以内。长江水利委员会作为三峡工程的设计总成单位 ,始终把工程质量放在首位。为此进行了大量勘察、设计、科研工作。对设计中的重大技术问题 ,如 :大坝、电站建筑物、永久船闸、垂直升船机、工程安全监测、大江截流及二期围堰、机电技术设计等进行了全面的总结和论述 ,根据施工进展提出大量优化设计方案和解决施工难题的措施

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关电站建筑物的内容
在知识搜索中查有关电站建筑物的内容
在数字搜索中查有关电站建筑物的内容
在概念知识元中查有关电站建筑物的内容
在学术趋势中查有关电站建筑物的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社