the late poured band
相关语句
  后浇带
     Design and construction of the late poured band
     后浇带的设计与施工
短句来源
     The late poured band and reinforced band in reinforced concrete structure design
     浅析钢筋混凝土结构设计中的后浇带和加强带
短句来源
     Some problems on design and construction of the late poured band
     后浇带设计和施工的几个问题
短句来源
     Application of the late poured band
     谈建筑施工后浇带的应用
短句来源
     Study on Application of the Late Poured Band in Large Scale Plate-type Concrete Structures
     后浇带在大尺度板式混凝土结构中的应用研究
短句来源
更多       
  对后浇带
     On the design and construction of the late poured band
     对后浇带设计与施工的探讨
短句来源
  “the late poured band”译为未确定词的双语例句
     THE APPLICATION OF UEA V IN CONCRETE TO ELIMINATE THE LATE POURED BAND AND INCREASE THE IMPERMEABILITY
     UEA-V 在信达金融大厦混凝土工程中的应用
短句来源
     Therefore, the study on application of the late poured band in large scale plate-type concrete structures has extraordinary significance on technical and economical efficiency.
     因此,对大尺度板式混凝土结构中后浇带的应用研究工作具有重要的技术经济意义。
短句来源
查询“the late poured band”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


UEA V is a kind of high efficiency expansive agent of type U. The concrete mixed with UEA V in Xin Da Finance Building, the late poured bands were eliminated and the impermeability of concrete reached S30.

UEA-V是一种高性能U型膨胀剂,将UEA-V掺于混凝土中应用于信达金融大厦工程,取消了施工后浇带,混凝土抗渗等级达到了S30。

According to the problems existed in underground waterproofing engineering of high-rise building this paper mainly introduced some construction technological measures such as the waterproofing treatment for pile head and the late poured band. Good waterproofing effect is acquired through applying waterproofing stoppage agent and 628JS composite waterproof paint.

针对高层建筑地下防水容易出现渗漏的现象 ,重点介绍了桩头部位、后浇带的留置及后浇防水处理等的施工技术措施 ,通过应用防水堵漏宝及 6 2 8JS复合防水涂料 ,该工程未发现渗漏 ,防水效果良好

According to author's experience, design position, design form and construction approach of the late poured band are in detail introduced in this paper. And author points out that position of the late poured band should be located in less internal force of the structure. At the same time, cross section form should be concave or step ladder and the reinforcement at the late poured band should also be continuous. Thus the hidden trouble for project quality may be removed.

根据实践 ,介绍了后浇带的留设位置、设计形式和施工方法。指出后浇带的位置应选在结构内力较小处 ,其断面形式应做成凹形或阶梯形 ,后浇带部分钢筋应该连续等 ,以期排除工程质量隐患。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关the late poured band的内容
在知识搜索中查有关the late poured band的内容
在数字搜索中查有关the late poured band的内容
在概念知识元中查有关the late poured band的内容
在学术趋势中查有关the late poured band的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社