助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   completion 在 公路与水路运输 分类中 的翻译结果: 查询用时:0.214秒
图标索引 在分类学科中查询
所有学科
公路与水路运输
石油天然气工业
数学
水利水电工程
建筑科学与工程
地质学
环境科学与资源利用
交通运输经济
体育
更多类别查询

图标索引 历史查询
 

completion
相关语句
  竣工
    Brief Introduction About Compilation and Study of Completion Documents for Yichang Changjiang Highway Bridge
    宜昌长江公路大桥竣工文件编制与研究简介
短句来源
    The quality control of completion documents in highway engineering
    公路工程竣工文件的质量控制
短句来源
    The main content and avhievements as follows:1.At the base of analyzing the highway investment component, the process of the highway project investment control is divided into five important stages, that is: the project decision stage, the design stage, the bidding stage, the construction stage, the completion acceptance stage, then they are carried on study separately, and the corresponding investment control goal is proposed on each main stage.
    1.在分析高速公路项目投资构成的基础上,将高速公路项目的投资控制过程划分为工程的项目决策阶段、设计阶段、招投标阶段、实施阶段、竣工验收阶段五个重要阶段分别进行研究,并提出各主要阶段所对应的投资控制目标。
短句来源
    For the problems in construction technical materials at present,from the angle of examining engineering completion materials,the paper discussed the problems existed in construction technical materials and countermeasures.
    目前,作为工程质量保证之一的施工技术资料,还存在不少问题,为了引起施工单位的重视和强化质量管理,从工程竣工资料审查的角度,就施工技术资料中普遍存在的问题及其对策进行了阐述。
短句来源
    Control and management of engineering cost of port construction are a dynamic process. The method of overall process management and emphases in the stages for decision-making for investment,designs,implementation and completion of a project are analyzed in the paper in order to improve the investment results.
    港口建设工程造价的控制与管理是一个动态的过程,文中重点分析了在项目投资决策阶段、项目设计阶段、项目实施阶段和竣工阶段全过程造价管理的方法与侧重点,以提高投资效益。
短句来源
更多       
  “completion”译为未确定词的双语例句
    2m Diameter Zhuhai Bridge Bored Pile HOle Completion in Guandong Province
    广东珠海大桥直径2m桥桩孔成孔施工实践
短句来源
    Talks about Ex-post Evaluation after Completion of Port Construction Item
    港口建设项目后评价工作浅谈
短句来源
    Based on Chongqing Shibanpo Changjiang Bridge,using the creep model of CEB-FIP(MC90) ,the deformation,internal force and prestress losses of creep responses at ten years after the completion of the bridge are analysed. The analysis result is useful to the construction analysis and design of the bridge to a certain extent.
    本文以重庆石板坡长江大桥为工程背景,采用CEB-FIP(MC90)的徐变模型,对成桥十年后该桥的徐变效应引起的桥梁变形、内力和预应力损失进行了计算分析,分析结果对该类桥梁的施工分析及设计具有一定的借鉴作用。
    Analysis and Countermeasures of Subsidence of Red Sandstone Roadbed After Its Completion
    红砂岩路基工后沉降分析与对策
短句来源
    Study of Static and Dynamic Load Tests for Sifangtai Cable-Stayed Bridge,Harbin at Completion Stage
    哈尔滨四方台斜拉桥成桥静动载试验研究
短句来源
更多       
查询“completion”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
  completion
Vinberg, and we establish a connection with the wonderful completion of the associated adjoint symmetric variety due to C.
      
We prove that the elements A\leqslant defined by Lusztig in a completion of the periodic module actually live in the periodic module (in the type A case).
      
The pharmaceutical sciences are advancing rapidly in the post-genomic era of the 21st century with the completion of the human genome, as well as those of many other organisms including bacteria and parasites, and the rapid advances in proteomics.
      
The idea comes from the completion technique ever used in LQ optimal control.
      
The objective is to find an optimal sequence to minimize the cost of completion times and the cost of compression.
      
更多          


After the completion of construction of a deep water pier in a port there appeared progressively some traces of damage in its structure, and it was soon observed that the piles were deformed and cracked. In order to explore the causes which had induced those damages, a comprehensive program of observations and experiments was conducted in the field, and the following conclusions were obtained. 1. The damage of the pier structure was caused primarily by the differential settlement, and the effect of the...

After the completion of construction of a deep water pier in a port there appeared progressively some traces of damage in its structure, and it was soon observed that the piles were deformed and cracked. In order to explore the causes which had induced those damages, a comprehensive program of observations and experiments was conducted in the field, and the following conclusions were obtained. 1. The damage of the pier structure was caused primarily by the differential settlement, and the effect of the lateral thrust of the soil was not important. 2. The differential settlement of the pier was produced mainly due to the difference of the compression of soil between the front side and the rear side of the pier. 3. There was probably some lateral deformation of soil in its ea- rly stage, but it did not develop remarkably afterward. Accordingly, a repairing project was proposed which consisted of two main remedies; (1) to install vertical piles by the non-vibrative jacking method in place of all broken and unbroken inclined-to-river raking piles; (2) to supplement long piles under the frontal platform of the pier with all the tips of piles of this part resting on the same bearing stratum. The pier had been repaired according to the above-mentioned pro- ject, and since then there was no problem ever happened in service during a period of more than ten years.

某深水码头在建成后不久即出现基桩变形和断裂等损坏现象。为了分析损坏原因,进行了现场观测、试验研究,经过将近一年的工作,得出下述结论:1.码头结构损坏主要是由差异沉降引起的,土体水平挤压的影响不大;2.差异沉降主要是由码头前后方土体压缩量不同而产生的;3.土体在早期可能有一定的水平位移,后来已不再有显著发展。根据以上的原因分析,提出的修复方案主要包括两项:(1)利用无振动压桩法补设直桩,以替换已断的和未断的全部向河斜桩;(2)在码头部分增设长桩,使其基桩桩尖均达到硬土层。码头按照上述方案修复后,经过十多年使用,未发现任何问题。

This paper describes the design, constructin and monitoring of a retaining wall with vertical prestressed anchors at Lion-Hill in the suburbs of Chengtu. The prestressed anchors produce vertical forces which act upon the wall and help to resist the actions of sliding and overturning. Thereby the retaining wall can be constructed with smaller amount of masonry and the construction cost will be reduced.The foundation of this retaining wall lies on a stratum of soft shale. In order to study the feasibility and...

This paper describes the design, constructin and monitoring of a retaining wall with vertical prestressed anchors at Lion-Hill in the suburbs of Chengtu. The prestressed anchors produce vertical forces which act upon the wall and help to resist the actions of sliding and overturning. Thereby the retaining wall can be constructed with smaller amount of masonry and the construction cost will be reduced.The foundation of this retaining wall lies on a stratum of soft shale. In order to study the feasibility and effectiveness of prestressed anchors in this soft rock, some field tests of anchors were carried out to obtain necessary data before the design, and the stress measurements on the anchors were monitored periodically after the completion of construction. The results prove that the structure of this type is effective and economical. Therefore, further application of the vertical prestressed anchors is suggested.

本文描述在成都郊区狮子山一座竖向预应力锚杆挡墙的设计、施工和长期观测情况。竖向预应力锚杆产生垂直压力,这种垂直压力作用在挡土墙上,可以增大抗滑和抗倾覆的作用力,从而可以减少挡土墙所需用的圬工数量,并节省工程费用。这个挡土墙的基础位于软质页岩的地层上。为了研究在这种软岩中采用预应力锚杆的可能性和有效程度,在设计前曾进行现场锚杆抗拔试验以取得一些数据,在挡墙完工后对锚杆的应力变化进行了长期观测。观测的结果证明,这种挡墙的效果良好,并且是经济合理的,因此提出了进一步应用竖向预应力锚杆的建议。

The contents of this paper are introducing briefly the intertate and defence highway sy stem in U. S. America, i. e. to be known as freeway, here refering to its generation, development, planning, standard of design, scope of facilities and source of finance, problems in construction, conditions at present, and its significations after completion in defence and transportation among the peole. The total length of freeway is only about 1% of entire mileage of highway in U. S, America, but carrys as much...

The contents of this paper are introducing briefly the intertate and defence highway sy stem in U. S. America, i. e. to be known as freeway, here refering to its generation, development, planning, standard of design, scope of facilities and source of finance, problems in construction, conditions at present, and its significations after completion in defence and transportation among the peole. The total length of freeway is only about 1% of entire mileage of highway in U. S, America, but carrys as much as 1/5 of American highway transportation in peaceful period.

本文介绍美国州际与国防公路系统的发生、发展、规划、设计标准、建设规模和经费来源、修建中的问题、目前状况、以及修建完成后在国防与民间运输上的意义。超级公路总长仅占全国公路总里程的1%,但在和平时期要负担全国公路运输任务的1/5。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关completion的内容
在知识搜索中查有关completion的内容
在数字搜索中查有关completion的内容
在概念知识元中查有关completion的内容
在学术趋势中查有关completion的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社