助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   project manager system 的翻译结果: 查询用时:0.064秒
图标索引 在分类学科中查询
所有学科
宏观经济管理与可持续发展
工业经济
信息经济与邮政经济
更多类别查询

图标索引 历史查询
 

project manager system
相关语句
  项目经理制
     Application of “Project Management and Dispatching System” in Project Manager System
     《工程管理与调度系统》在项目经理制中的运用
短句来源
     A Study of Establishing the Project Manager System in Designing Institutes
     设计院建立项目经理制的研究
短句来源
     By application of project manager system of “Pro ject Management and Dispatching System”, the project schedule and manpower dist ribution is scientifically adjusted, the working day quota system is applied int o the project management, the lowering of production cost is realized, the worki ng efficiency is improved, the management mode of project quality is ensured.
     运用《工程管理与调度系统》的项目经理制,科学地调整工程进度及人力分布,把工日定额体系应用到工程项目的管理中,实现了降低生产成本,提高工作效率,保证工程质量的管理模式。
短句来源
     Project manager system, as an effective management form, is an important way for management of fixed assets investment project.
     项目经理制 ,作为一种有效的管理方式 ,是固定资产投资项目管理的重要手段。
短句来源
     Then, according to the specific condition of this institute, this paper puts forward the organization structure regrouping scheme and the thought to realize financial management system reform, as well as the demand for the construction of corresponding internal regulations such as project manager system, salary allocations system.
     随后,结合该设计院的具体情况,分别研究提出了适合其自身特点的平衡矩阵式的组织结构重组方案和实现财务自主的财务管理体制改革思路,以及内部相关配套制度:项目经理制、工资分配制度等的建设要求。
短句来源
更多       
  “project manager system”译为未确定词的双语例句
     PROJECT MANAGER SYSTEM
     项目经理负责制
短句来源
     It states the superiority and concrete operating methods of adopting "means of project construction'' to organize construction, putting into practice "project manager system of job responsibility" and "accounting system of project cost" while the enterprises carry through construction project after bid and acceptance of a bid at present.
     论述了现阶段施工企业在工程建设项目中,通过投标中标后进行工程项目施工中,采用“项目法施工”管理组织施工,实行“项目经理责任制”和“项目成本核算制”的优越性以及具体操作方法。
短句来源
     Due to the low quality of human resource and poor management in this industry, it is highly necessary to summarize systematically the research achievements relating to professionalizing of project manager, analyze potential problems might occur in the process of developing professional manager system for domestic construction industry at current stage, and put forward countermeasures accordingly. This will undoubtedly promote the smooth growth of project manager system and have huge significance in enhancing competencies of construction workers and improve the quality of construction and engineering.
     在我国建筑行业人力资源素质不高、管理混乱的现状下,系统地归纳国内外项目经理职业化的相关研究成果,分析我国现阶段建筑业项目经理职业化的发展方向和职业化过程中可能出现的问题,并提出相应对策,以促进我国建筑行业项目经理职业化的顺利推进,对于增强我国建设队伍素质、提高建筑工程质量有着重大的意义。
短句来源
  相似匹配句对
     PROJECT MANAGER SYSTEM
     项目经理负责制
短句来源
     The of construction project manager
     浅谈施工项目经理的综合素质
短句来源
     PROJECT
     项目
短句来源
     PROJECT
     项目动态
短句来源
     Analysis of Project Manager System
     解读项目经理制
短句来源
查询“project manager system”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The QK18 - 1 project team of Bohai Oil Co., undertaking the project manager system, has adopted lo complete sets of the most advanced drilling techniques in the wold. Those are the integrated well head, PDC bit8 for total depth, drillable floatin8 collar and shoe to PDC bit8, cementing without WOC, down hole steerable motor,drilling fluids for environment protection,rig free cementing loedng,MWD logging, toPdrive drilling, and new and high -efficient 1inear shaker. Three wells were drilled with average...

The QK18 - 1 project team of Bohai Oil Co., undertaking the project manager system, has adopted lo complete sets of the most advanced drilling techniques in the wold. Those are the integrated well head, PDC bit8 for total depth, drillable floatin8 collar and shoe to PDC bit8, cementing without WOC, down hole steerable motor,drilling fluids for environment protection,rig free cementing loedng,MWD logging, toPdrive drilling, and new and high -efficient 1inear shaker. Three wells were drilled with average depth of 3, 561m each, penetration rate of 29. 46m/h and construction period of 18. 83 days, where the shortest peried is only 13. 31days with couple of best records.

渤海石油公司QK18-1项目组实行项目经理负责制,树立新的观念和思想,采用了当今世界上先进的10项钻井配套技术:整体组装式井口头、全井段PDC钻头、PDC钻头可钻式浮箍浮鞋、不候凝固井、大功率导向马达、无油无污染环保钻井液、不占用钻机时间水泥胶结测井、MWD测量技术、顶部驱动钻井和新型高效线性震动筛等。所钻3口井平均井深3561m,平均机械钻速29.46m/h,平均建井周期18.83d,最快的一口井只有13.31d,创造了多项最好记录。

Project manager system has come into effect in Chinese enterprises and becomes an effective way of managing various projects. The functions, responsibilities and qualifications of project managers are discussed in this paper. The working scopes and characteristics of project managers are also stated with such areas as international trade and engineering construction business being examples.

项目经理负责制已在中国企业中开始实行 ,并逐渐成为各类项目管理的有效方法之一。本文讨论了项目经理的作用、职责、条件 ,并以贸易和工程建设领域为例 ,说明了项目经理的工作范围和特点

Before fixed assets investment project will be practice the form of management organization must be ensured to implement. Project manager system, as an effective management form, is an important way for management of fixed assets investment project.

固定资产投资项目在实施之前 ,必须确定采取何种管理组织结构形式 ,以确保实现预定的项目目标。项目经理制 ,作为一种有效的管理方式 ,是固定资产投资项目管理的重要手段。

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关project manager system的内容
在知识搜索中查有关project manager system的内容
在数字搜索中查有关project manager system的内容
在概念知识元中查有关project manager system的内容
在学术趋势中查有关project manager system的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社