助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   large overburden depth 的翻译结果: 查询用时:0.007秒
图标索引 在分类学科中查询
所有学科
水利水电工程
更多类别查询

图标索引 历史查询
 

large overburden depth
相关语句
  深覆盖层
     The reliability of seepage prevention system is a key problem for high rockfill dam built on the foundation of large overburden depth.
     在深覆盖层地基上修建高土石坝,其防渗体系的可靠性是一项关键技术问题。
短句来源
  相似匹配句对
     , and textual (e.g. by and large).
     和语篇搭配(如by and large)。
短句来源
     Large legacy
     大型塔机传奇
短句来源
     Construction of Large Diameter Pile Foundations at Deep Water Riverbed Without Overburden
     深水无覆盖层大孔径桩基施工
短句来源
     Study on semi-continuous excavating technology for overburden of loose mineral in large-sized open-pit
     大型露天矿松软物料剥离半连续工艺系统研究
短句来源
     The reliability of seepage prevention system is a key problem for high rockfill dam built on the foundation of large overburden depth.
     在深覆盖层地基上修建高土石坝,其防渗体系的可靠性是一项关键技术问题。
短句来源
查询“large overburden depth”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The reliability of seepage prevention system is a key problem for high rockfill dam built on the foundation of large overburden depth.Considering the practical characteristics of Pubugou Hydropower Project,the stability of the dam,the deformation and the stresses of the joint zone connected the core wall in the dam and the concrete cut wall in the large overburden depth are analyzed by the adaptive finite element method.And then the advantages and disadvantages of the different type of joints are...

The reliability of seepage prevention system is a key problem for high rockfill dam built on the foundation of large overburden depth.Considering the practical characteristics of Pubugou Hydropower Project,the stability of the dam,the deformation and the stresses of the joint zone connected the core wall in the dam and the concrete cut wall in the large overburden depth are analyzed by the adaptive finite element method.And then the advantages and disadvantages of the different type of joints are also discussed;finally,an appropriate type of joint is recommended to the designers.

在深覆盖层地基上修建高土石坝,其防渗体系的可靠性是一项关键技术问题。针对瀑布沟水电站堆石坝的实际工程特点,应用自适应有限元方法,分析研究了大坝的稳定性和覆盖层中混凝土防渗墙与坝内黏土心墙接头部位的局部应力和变形情况,对比分析了不同接头形式的利弊,为设计部门推荐了合适的接头形式。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关large overburden depth的内容
在知识搜索中查有关large overburden depth的内容
在数字搜索中查有关large overburden depth的内容
在概念知识元中查有关large overburden depth的内容
在学术趋势中查有关large overburden depth的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社