助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   tsq hydropower station 的翻译结果: 查询用时:0.218秒
图标索引 在分类学科中查询
所有学科
水利水电工程
电信技术
更多类别查询

图标索引 历史查询
 

tsq hydropower station
    很抱歉,暂未找到该词条的译词。
相关语句
  相似匹配句对
     Reminiscences of Construction for TSQ-1 Hydropower Project
     天生桥一级水电站建设八年的回顾
短句来源
     Technical Management of Construction for TSQ - 1 Hydropower Project
     天生桥一级水电站工程建设的技术管理
短句来源
     Bulkhead Construction of Diversion Tunnel in TSQ-ⅠHydropower Station
     天生桥一级水电站导流洞堵头施工
短句来源
     Hydropower and China
     水电与中国
短句来源
     Analysis of Settlement Payment of Lot C_3 for TSQ-Ⅰ Hydropower Station
     天生桥一级水电站C_3标工程结算支付分析
短句来源
查询“tsq hydropower station”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


The TSQ-ⅠHydropower Station has an installed capacity of 1200 MW; It has aconcrete-faced rockfill dam with max.height 1 78m ;The max. flood dischange of spillwayamounts to 21750m ̄3/s; the rockfill, 180 million m ̄3; the earth-rock exeavation in open-cut,26. 55million m ̄3; the concrete,1. 32million m ̄3. So this is a very large project. The design ofconfiguration of hydrostructures has been made on the basic of sciencific test and engineering geo-logical conditions.

天生桥一级水电站采用混凝土面板堆石坝,坝高178m,溢洪道最大地流量21750m ̄3/s,电站装机容量1200MW,大坝填筑量1800万m ̄3,工程总开挖量2655万m ̄3,混凝土132万m ̄3。本文介绍了在科研试验的基础上,根据地质条件进行的枢纽布置及各水工建筑物的设计原则。

Although the diversion tunnel of TSQhydropower station is a temporary discharge structure,the bulkhead of diversion tunnel is a permanent hydraulic retaining structure,and the bulkhead is the same important as dam and belongs to the first grade structure.The safety of bulkhead relates to the dam storage and gererating of electricity on time.In the optimal design of diversion tunnel bulkhead in TSQHydropower Station,the construction quantity was reduced,the concrete temperature...

Although the diversion tunnel of TSQhydropower station is a temporary discharge structure,the bulkhead of diversion tunnel is a permanent hydraulic retaining structure,and the bulkhead is the same important as dam and belongs to the first grade structure.The safety of bulkhead relates to the dam storage and gererating of electricity on time.In the optimal design of diversion tunnel bulkhead in TSQHydropower Station,the construction quantity was reduced,the concrete temperature was stability,and the joints of new and old concrete were well dealed,the concrete in joints was safety and reliable

天生桥一级水电站导流洞虽属临时过水建筑物 ,但导流洞的堵头却是永久性挡水建筑物 ,与大坝有同等的重要性 ,属于一级建筑物 ,它的安全与否 ,与大坝水库蓄水、厂房按期发电息息相关 .天生桥一级水电站导流洞堵头优化设计 ,减少了堵头段工程量 ,尽快使混凝土温度达到稳定 ,并处理好新老混凝土的连接缝 ,确保堵头混凝土安全可靠 .

The settlement payment is the core of contract management.The Lot C 3 of TSQHydropower Station,loaned by OECF of Japan,is an international bidding project.It uses FIDIC contract conditions and lays down a reasonable settlement payment procedure so as to fund the contractor timely.This paper presents some noticeable problems based on the analysis of C 3 settlement.It comes to the conclusion that a high efficient and practical settlement procedure is necessary to the contractor.

工程结算支付是承包工程合同管理的核心 .天生桥一级水电站 C3标工程是一项利用日本海外经济协力基金(OECF)贷款的国际承包工程 ,采用国际通用的 FIDIC合同条件 ,建立起一套较为合理的工程结算支付程序 ,为承包商按照合同工期要求实现阶段目标提供了资金保证 .在对 C3标工程结算支付分析的基础上 ,提出在承包合同的工程结算支付管理中应注意的几个问题 ,得出建立一套符合合同及工程师要求的高效、实用的工程结算支付程序对承包商的生存和发展具有重要意义的结论 .

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关tsq hydropower station的内容
在知识搜索中查有关tsq hydropower station的内容
在数字搜索中查有关tsq hydropower station的内容
在概念知识元中查有关tsq hydropower station的内容
在学术趋势中查有关tsq hydropower station的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社