助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   completion time 的翻译结果: 查询用时:0.2秒
图标索引 在分类学科中查询
所有学科
数学
互联网技术
计算机软件及计算机应用
企业经济
工业通用技术及设备
中国通史
中国文学
更多类别查询

图标索引 历史查询
 

completion time     
相关语句
  完成时间
     Analysis of Heuristic Algorithm for the Scheduling Problem of the Multiprocessor Flow Shop Weighted Completion Time Scheduling Problem
     多机Flow shop加权完成时间调度问题的启发式算法分析
短句来源
     The results are three necessary and sufficient conditions for the objective of total completion time and some sufficient conditions for the objective of maximum lateness time or for the objective of the number of tardy jobs under which an optimal schedule is of interval perturbation robustness.
     本文的结果是目标函数为完成时间总和时在加工时间扰动下最优调度具有区间摄动鲁棒性的三个充分必要条件,目标函数为最大拖期时间时及目标函数为拖后工件个数时在加工时间和/或交付期扰动下最优调度具有区间摄动鲁棒性的若干充分条件.
短句来源
     The result of MMMSE examination showed that the score of NPSLE group was lower than that of SLE control group and normal control group(P<0.01),and the completion time was longer than SLE control group and normal control group(P<0.01);
     SLE对照组较正常对照组在得分和完成时间上差异无统计学意义(P>0.05):②MMMSE检查结果显示:NPSLE组得分低于SLE对照组和正常对照组(P<0.01),完成时间长于SLE对照组和正常对照组(P<0.01);
短句来源
     Analysis of Heuristic Algorithm for the Flexible Flow Shop Weighted Completion Time Scheduling Problem
     柔性Flow shop加权完成时间调度问题的启发式算法
短句来源
     Performance analysis of policy of heuristic for the stochastic flexible flow shop weighted completion time scheduling problem
     随机柔性Flow shop加权完成时间调度问题的启发式策略性能分析
短句来源
更多       
  完工时间
     We study the problem 1|B|ΣwjCj of minimizing the total weighted completion time on a batch machine.
     本文研究使带权总完工时间为最小的同时加工排序问题1|B|∑wjCj.
短句来源
     ON-LINE RANDOMIZED ALGORITHM TO MINIMIZE WEIGHTED COMPLETION TIME FOR DIAL-A-RIDE PROBLEMS
     极小化总加权完工时间的Dial-a-Ride问题的在线随机算法(英文)
短句来源
     In this paper,on-line dial-a-ride problems with a single server to minimize total weighted completion time on general metric space are considered.
     讨论一般度量空间上带单服务器的极小化总加权完工时间在线Dial-a-Ride问题.
短句来源
     We first formulate the problem of minimizing total weighted completion time on single batch processing machine 1|B|∑ωjCj and get some conclusions.
     本文首先介绍总完工时间和最小的带权单机分批排序问题1|B|∑ωjCj,然后将1|B|∑ωjCj表示成数学规划的形式,并且用数学规划中的对偶理论证明了SPT序是其特殊情况1|B=1|∑Cj的最优解。
短句来源
     In 1978, an algorithm for minimizing total weighted completion time with a series-parallel precedence was given by Lawler.
     1978年Lawler给出当任务间的优先约束关系为串并有向图时,加权总完工时间问题的算法。
短句来源
更多       
  成书时间
     Examination of Yan Tie Lun Completion Time
     《盐铁论》成书时间
短句来源
     Research into the Completion Time of Yi Jian Jia Zhi
     《夷坚甲志》成书时间
短句来源
  总完工时间
     We study the problem 1|B|ΣwjCj of minimizing the total weighted completion time on a batch machine.
     本文研究使带权总完工时间为最小的同时加工排序问题1|B|∑wjCj.
短句来源
     We first formulate the problem of minimizing total weighted completion time on single batch processing machine 1|B|∑ωjCj and get some conclusions.
     本文首先介绍总完工时间和最小的带权单机分批排序问题1|B|∑ωjCj,然后将1|B|∑ωjCj表示成数学规划的形式,并且用数学规划中的对偶理论证明了SPT序是其特殊情况1|B=1|∑Cj的最优解。
短句来源
     In 1978, an algorithm for minimizing total weighted completion time with a series-parallel precedence was given by Lawler.
     1978年Lawler给出当任务间的优先约束关系为串并有向图时,加权总完工时间问题的算法。
短句来源
     Discounted Total Weighted Completion Time in No-Wait Flow Shop with Separated Setup Times
     折扣加权总完工时间的调整时间可分离无等待Flow Shop排序问题
短句来源
     For the single machine,batching,total completion time scheduling problems,the optimal batching structures on the batching ways:all jobs in exactly N(arbitrarily fixed batch number and 1
     研究了目标函数为总完工时间、工件恰分N批的单机分批排序问题最优解的结构性质,其中N为1与工件数之间的任意整数.
短句来源
更多       

 

查询“completion time”译词为其他词的双语例句

     

    查询“completion time”译词为用户自定义的双语例句

        我想查看译文中含有:的双语例句
    例句
    为了更好的帮助您理解掌握查询词或其译词在地道英语中的实际用法,我们为您准备了出自英文原文的大量英语例句,供您参考。
      completion time
    The objective functions are the minimizing of makespan and total weighted completion time.
          
    The objective is to minimize the maximum job completion time.
          
    The objective is to minimize the longest job completion time (makespan).
          
    Semi on-line scheduling for maximizing the minimum machine completion time on three uniform machines
          
    The reaction completion time was directly proportional to the initial concentration of Ca(OH)2 in slurry above 0.5 wt%.
          
    更多          


    In this paper,fuzzy number is used to take the uncertainty in the job durationtime of the project network into consideration.And a procedure is proposed to cal-culate the completion time of the entire project in terms of the probability dis-tribution.Compared with PERT,The method introduced is reasonable,simple andeasy to handle,

    在本文中用模糊数来考虑工程网络中作业时间的非肯定性,且介绍了一种以可能性分布表示的整个工程完工时间的方法。与 PERT 相比较,这里介绍的方法是合理的,简单的,且便于应用。

    In this paper we prove that the shortest ready time (SRT) sequencing minimizes the total completion time, and analyse properties of the one-machine sequencing problem with ready time to minimize the weighted number of tardy jobs.

    本文证明了最短准备时间(SRT)排序使总的完工时间取得最小,并进一步分析了带有准备时间的带权误工工件数排序问题的一些性质.

    This paper presents a modified Headspace GC/FPD method for determination of dimethylsulfide (DMS) in seawater and dimethylsulphoniopropionate(DMSP) in phytoplankton cells. The effects of temperature, gas/liquid phaseratio, and salt concentration on headspace sensitivity were investigated. Theoptimum condition of these three factors are at 40℃,0.5% and 20% respectively.The method's detection limit is 20ng/L. The relative standard deviation is lessthan 6%, the average recovery rate is 106%, relative error is less...

    This paper presents a modified Headspace GC/FPD method for determination of dimethylsulfide (DMS) in seawater and dimethylsulphoniopropionate(DMSP) in phytoplankton cells. The effects of temperature, gas/liquid phaseratio, and salt concentration on headspace sensitivity were investigated. Theoptimum condition of these three factors are at 40℃,0.5% and 20% respectively.The method's detection limit is 20ng/L. The relative standard deviation is lessthan 6%, the average recovery rate is 106%, relative error is less than 10%. Thedouble logarithm linear correlation cient between peak height and DMS concentrations is better than 0.99. The completion time of DMS release from cell DMSPunder alkaline condition (10 molre NaOH) is at least 6 hours. This procedurecan be used for the measurement of DMS and DMSP in a variety of naturalsamples.

    建立了顶空GC/FPD测定海水中二甲基硫(DMS)和浮游植物细胞中二甲基硫丙酸(DMSP)的方法,并研究盐度、温度、气液相比DMS诸因素对DMS项空灵敏度的影响。该法对DMS测定的相对标准偏差均小于6%,平均回收率为106%,最低检出限为20ng/L。细胞DMSP先经碱作用转化为DMS,在50℃下作用时间不少于6h,峰高与浓度的双对数线性相关系数大于0.99。对1994年冬、1995年夏采自胶州湾的实际样品分析结果表明,本法可用于一般海洋样品的测定。

     
    << 更多相关文摘    
    图标索引 相关查询

     


     
    CNKI小工具
    在英文学术搜索中查有关completion time的内容
    在知识搜索中查有关completion time的内容
    在数字搜索中查有关completion time的内容
    在概念知识元中查有关completion time的内容
    在学术趋势中查有关completion time的内容
     
     

    CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
    版权图标  2008 CNKI-中国知网
    京ICP证040431号 互联网出版许可证 新出网证(京)字008号
    北京市公安局海淀分局 备案号:110 1081725
    版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社