助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   standard of utilizable foundation rock 的翻译结果: 查询用时:0.173秒
图标索引 在分类学科中查询
所有学科
水利水电工程
更多类别查询

图标索引 历史查询
 

standard of utilizable foundation rock
相关语句
  建基面标准
     Research on standard of utilizable foundation rock mass at toe-plate of concrete face rock-fill dam of Shuibuya Project
     清江水布垭面板堆石坝趾板可利用建基面标准研究
短句来源
     A synthetical analysis on utilizable foundation rock at the toe-plate of dam is conducted by several kinds of methods, e.g., project analog study, analyses on results of rock mechanics properties for existed dams, sonic wave tests for rock mass at the toe-plate area, deformation tests and quality assessment for the rock mass, the standard of utilizable foundation rock at the toe-plate of concrete face rock-fill dam of Shuibuya Project is determined.
     通过工程类比、建坝岩体力学性质研究成果分析、趾板区岩体声波测试、岩体变形试验以及岩体质量评价等多种方法对趾板建基岩体性状进行综合分析,确定了水布垭面板堆石坝趾板可利用建基面标准
短句来源
  相似匹配句对
     Standard
     标准
短句来源
     Which is the standard?
     采用什么标准评价?
短句来源
     training of standard;
     标准培训阶段的培训内容只是整个项目培训的一部分,在后续的阶段还有对应的专项培训。
短句来源
     the standard of the quality.
     制剂质量标准的研究。
短句来源
     Summarization on utilizable value in by-products of Fibre crops
     麻类作物副产品的综合利用现状
短句来源
查询“standard of utilizable foundation rock”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


A synthetical analysis on utilizable foundation rock at the toe-plate of dam is conducted by several kinds of methods, e.g., project analog study, analyses on results of rock mechanics properties for existed dams, sonic wave tests for rock mass at the toe-plate area, deformation tests and quality assessment for the rock mass, the standard of utilizable foundation rock at the toe-plate of concrete face rock-fill dam of Shuibuya Project is determined. The acceptable standards of utilizable...

A synthetical analysis on utilizable foundation rock at the toe-plate of dam is conducted by several kinds of methods, e.g., project analog study, analyses on results of rock mechanics properties for existed dams, sonic wave tests for rock mass at the toe-plate area, deformation tests and quality assessment for the rock mass, the standard of utilizable foundation rock at the toe-plate of concrete face rock-fill dam of Shuibuya Project is determined. The acceptable standards of utilizable rock mass in which sonic wave speed through hard rock equals 3. 8 km/s and that through soft rock 3.2 km/s are proposed. The weak unloaded zone of rock mass may be taken as rock base-plane of the toe-plate for Shuibulya Project.

通过工程类比、建坝岩体力学性质研究成果分析、趾板区岩体声波测试、岩体变形试验以及岩体质量评价等多种方法对趾板建基岩体性状进行综合分析,确定了水布垭面板堆石坝趾板可利用建基面标准。提出了以硬岩声波波速3.8 km/s,相对软岩声波波速3.2 km/s作为建基面验收标准,并以弱卸荷带岩体作为水布垭面板堆石坝趾板建基面。

 
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关standard of utilizable foundation rock的内容
在知识搜索中查有关standard of utilizable foundation rock的内容
在数字搜索中查有关standard of utilizable foundation rock的内容
在概念知识元中查有关standard of utilizable foundation rock的内容
在学术趋势中查有关standard of utilizable foundation rock的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社