助手标题  
全文文献 工具书 数字 学术定义 翻译助手 学术趋势 更多
查询帮助
意见反馈
   refuse landfill sites 的翻译结果: 查询用时:0.16秒
图标索引 在分类学科中查询
所有学科
环境科学与资源利用
更多类别查询

图标索引 历史查询
 

refuse landfill sites
相关语句
  垃圾填埋场
     Choice of Liner Materials for Refuse Landfill Sites and Utilization of Landfill Gas
     垃圾填埋场衬里材料选择与产气利用
短句来源
     Treatment of Percolate at City Refuse Landfill Sites
     垃圾填埋场渗滤液的处理方法
短句来源
     The result shows : the heavy metal is seriously polluted in municipal refuse landfill sites of Nanping city.
     结果表明:南平市城市垃圾填埋场重金属污染严重。
  相似匹配句对
     Sanitation Landfill Technology for Refuse
     垃圾卫生填埋技术
短句来源
     TREATMENT OF REFUSE LANDFILL LEACHATE
     垃圾填埋场渗滤液的处理工艺介绍
     Treatment of Percolate at City Refuse Landfill Sites
     垃圾填埋场渗滤液的处理方法
短句来源
     4. Landfill.
     4、填埋等。
短句来源
     On Urban Refuse
     浅谈城市垃圾
短句来源
查询“refuse landfill sites”译词为用户自定义的双语例句

    我想查看译文中含有:的双语例句
例句
没有找到相关例句


Based upon laboratory experimental results a domestic refuse leaching model was derived, F=■. The model could be applied on leaching load estimation for domestic refuse landfill sites with periodical filling of a fixed amount of refuse, and pollution loading decrement will then be demonstrated.

本文阐述了垃圾渗沥液中污染物的产生过程。在实验的基础上,建立了污染负荷估算模式:(?)。运用该模式,可估算垃圾填埋场运行期的最大污染负荷,并可描述封场后污染负荷的衰减过程。

Settlement of refuse surface in the large-scale simulator located in Shanghai Refuse Landfill site has been monitored and its long-term prediction was made. The intial refuse height was 4m and the area of simulator was 3000m2. It was found that the settlement was a function of refuse density. Less settlement was monitored at the points where the refuse was compacted heavily. The maximum cumulative settlement of 1m, 25% of the initial height, was found during the 2.5 years of monitoring...

Settlement of refuse surface in the large-scale simulator located in Shanghai Refuse Landfill site has been monitored and its long-term prediction was made. The intial refuse height was 4m and the area of simulator was 3000m2. It was found that the settlement was a function of refuse density. Less settlement was monitored at the points where the refuse was compacted heavily. The maximum cumulative settlement of 1m, 25% of the initial height, was found during the 2.5 years of monitoring from April 1995 to October 1998. The reuse approaches for the Landfill were discussed based on the settlement rules.

研究了在上海市老港垃圾填埋场17号填埋单元建造的3000m‘小型卫生填埋场垃圾表面沉降规律。结果表明,表面沉降与垃圾的压实程度有关,在填埋过程中,垃圾被充分压实后,沉降就相对较小。在所监测的25年时间内,最大累计沉降大于lin,是垃圾填埋初始高度(4m)的25%。根据垃圾表面沉降的预测结果,讨论了老港垃圾填埋场的利用途径和可能性。

Taking the scaling phenomena of the leachate pipe on shenzhen refuse landfill site, this article analyzes the reason of scaling from such points as scale composition,water quality,pipe design and using of pipe and bring forward the solvent method and prevention.

针对深圳市下坪垃圾填埋场渗滤液排污管道结垢现象 ,从结垢物组成分析、水质情况、管道设计、管道使用方法等方面 ,就其结垢原因进行分析探讨 ,并提出防治对策

 
<< 更多相关文摘    
图标索引 相关查询

 


 
CNKI小工具
在英文学术搜索中查有关refuse landfill sites的内容
在知识搜索中查有关refuse landfill sites的内容
在数字搜索中查有关refuse landfill sites的内容
在概念知识元中查有关refuse landfill sites的内容
在学术趋势中查有关refuse landfill sites的内容
 
 

CNKI主页设CNKI翻译助手为主页 | 收藏CNKI翻译助手 | 广告服务 | 英文学术搜索
版权图标  2008 CNKI-中国知网
京ICP证040431号 互联网出版许可证 新出网证(京)字008号
北京市公安局海淀分局 备案号:110 1081725
版权图标 2008中国知网(cnki) 中国学术期刊(光盘版)电子杂志社